| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 15, 2026 |
| Due: | Sep 18, 2026 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C24426Q0967 |
| Publication URL: | To access bid details, please log in. |
Title of Project: Omnicell One Cell Cabinet Components
1.Background:
The VA Pittsburgh Healthcare System (VAPHS) requires the procurement of one (1) Omnicell One‑Cell Cabinet associated components to support the activation of the 6E post‑surgical unit. This acquisition is necessary to enhance medication management efficiency, reduce manual errors, and align with the VA’s ongoing transition toward the Autonomous Pharmacy model. The system integrates fully with existing Omnicell infrastructure currently deployed at University Drive, HJ Heinz, and CBOC locations.
This requirement consists of two separate procurement channels: (1) ECAT procurement (PO 646-B62007) of the primary Omnicell 1-Cell Cabinet (MED-FRM-501), and (2) local NC04 contracting procurement of components including drawers, Flexlock, WIN10 package, external return bin, shelf, and installation. These items together complete the fully functional dispensing system required for the 6E activation post-surgical unit.
3.Scope:
The contractor shall provide installation services for the ECAT-procured Omnicell 1-Cell Cabinet (MED-FRM-501), and all components itemized below. The contractor responsibilities include uncrating, staging, installation, physical integration, hardware setup, and verification of operational readiness. Pittsburgh VA Biomedical Engineering will perform safety checks, asset entry, and system acceptance after installation.
2. Compatibility Requirements:
3. Functional Requirements:
4. Performance Requirements:
Scheduling, Hours of Work, and Location:
Delivery Location:
Pittsburgh VA Medical Center ATTN: 6 East
University Drive C.
Pittsburgh, PA 15240

With GovernmentContracts, you can:
...replacement will be with Mag Bearing Chillers and High Efficiency Boilers. Total Estimated ...
PennBid
Bid Due: 11/12/2026
.../technology that significantly improves effectiveness, productivity, energy, or efficiency of making...
DEPT OF DEFENSE
Bid Due: 6/28/2031
...: Technology-based solutions improving energy efficiency, mobility, maintainability, or usability... of field feeding ...
DEPT OF DEFENSE
Bid Due: 7/13/2031
...and any feasible alternatives that could improve the speed and efficiency of response. ...
DEPT OF DEFENSE
Bid Due: 11/30/2026