| Location: | Pennsylvania |
|---|---|
| Posted: | May 12, 2026 |
| Due: | May 19, 2026 |
| Agency: | Pennsylvania State University |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 00-09058.00 |
| Publication URL: | To access bid details, please log in. |
Installation of a system to purify the attemperator water at the West Campus Steam Plant for the 800 PSI to 250 PSI pressure reducing station on the CT HRSG.
Contractors bidding to Whiting-Turner must be prequalified with Whiting-Turner. Prequalification with Whiting-Turner can be completed at: https://www.whitingturner.com/subcontractor-prequalification/
Project will be bid through - https://app.buildingconnected.com/projects/6941cab482b200f9f0baf14c/bid-packages
| Package Number | Package Name | Pre-Bid Date/Time | Pre-Bid Meeting | Bid Date/Time | Awarded To | Document |
| D23 | Electrical Package - Reverse Osmosis Installation | 04/23/2026 - 09:00 am | Recommended but not Mandatory | 05/19/2026 - 03:00 pm | ||
| D26 | Mechanical Package - Reverse Osmosis Installation | 04/23/2026 - 09:00 am | Recommended but not Mandatory | 05/19/2026 - 03:00 pm |

With GovernmentContracts, you can:
...(VA-26-00050598) Design Build Active Contract Opportunity Notice ID 36C24426R0081 Related Notice...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/29/2026
...Marasco Architect/ Engineer and Design Build Selection Capital Project (>$10M) No Professional.... Design ...
Pennsylvania State University
Bid Due: 6/11/2026
..., and Storage. Penn State Project Leader Name, Email Ronald Kobelenske Architect/ Engineer ...
Pennsylvania State University
Bid Due: 6/16/2026
.... Architect/ Engineer and Design Build Selection Capital Project (>$10M) No Professional Consultant...
Pennsylvania State University
Bid Due: 6/25/2026