| Location: | Indiana |
|---|---|
| Posted: | Jul 2, 2026 |
| Due: | Jul 29, 2026 |
| Agency: | Indianapolis Public Transportation Corporation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 26-06-587 |
| Publication URL: | To access bid details, please log in. |
Project Description: Project includes full demolition and replacement of existing asphalt driveway running from Harding Street back to an existing salt barn. Asphalt is to be replaced with 8” thick concrete. Full length of work is approximately 650 feet long by 21 feet wide.

With GovernmentContracts, you can:
...Description: Asphalt Emulsion Program - Season #2 Bid Number: 800-26-73A Bid Revisions/Pricing...
State Government of Indiana
Bid Due: 10/01/2026
...Category Code: Parks, Recreation, Trail Work, Trails and/or Multipurpose Trails, Paving (Asphalt... installation ...
City of Fort Wayne
Bid Due: 10/01/2026
...(Asphalt or Concrete),Trails and/or Multipurpose Trails Bid/Request Name Fort Wayne Parks Northside Park..., ...
City of Fort Wayne
Bid Due: 10/01/2026
..., drainage, floors, and landings; performing asphalt removal, regrading, and resurfacing; adding...
DEPT OF DEFENSE
Bid Due: 9/21/2026