IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3

Location: Georgia
Posted: Jul 2, 2026
Due: Aug 3, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • S - Utilities and Training Services
Solicitation No: PE-66062-NONST-2027-000000440
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-66062-NONST-2027-000000440 IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3 Atlanta, City Of
Jul 02, 2026 @ 03:26 PM
Aug 03, 2026 @ 02:00 PM
IFB/CON/DOT/2604-1260182, 2025 LMIG Street Resurfacing and Associated Activities Group 3

Start Date: Jul 02, 2026 @ 03:26 PM ET

End Date:
Aug 03, 2026 @ 02:00 PM ET

Event ID: PE-66062-NONST-2027-000000440
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Construction / Public Works
Government Type: city
Fiscal Year: 2027


Description


This project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT standards and specifications.

NIGP Codes
Code Description
57025 Forms, Metal: Concrete Curbs, Columns, and Gutters
57046 Post-Tensioned Type Reinforcing System, For Concrete Slabs
74514 Asphaltic Concrete, Cold Laid, Rock Asphalt
74521 Asphaltic Concrete, Hot Laid Including Bituminous Materials
74565 Patching Mix, Asphalt Concrete
75028 Concrete Curing Blankets and Paper
75030 Concrete, Precast
75032 Concrete Crack Repair Adhesive, Structural Urethane
75033 Concrete, Repair, Rapid Setting
75059 Mixers, Mobile, Concrete
75070 Ready-Mix Concrete (See 150-12 for Bagged Concrete)
75072 Recycled Bulk Concrete and Other Road Materials (See 745-68 for Recycled Asphalt)
75537 Asphalt and Concrete Recycling Equipment
75543 Asphalt and Concrete Scrapers, Profilers, and Milling Machines, Powered, Complete
75547 Concrete and Asphalt Power Gun Sprayers
75550 Concrete Buckets
75555 Concrete Buggies, Carts, Screeding Machines, Screens, etc.
75560 Concrete Curbers, Gutter Machines and Accessories
75565 Concrete Cutters, Saws, Multipurpose Saws, and Accessories
75570 Concrete Finishers, Power Driven
75573 Concrete Form Tubes and Boxes, For Forming Concrete Columns, etc., All Kinds
75574 Concrete Heaters and Accessories
75575 Concrete Joint Cleaning and Routing Machines
75580 Concrete and Mortar Mixers
75585 Concrete Vibrators
75595 Recycled Asphalt and Concrete Handling Equipment, Accessories and Supplies
55031 Markers, Traffic, Concrete
96877 Traffic Safety Services
96880 Traffic Sign Installation and Removal Services
96881 Traffic Sign Maintenance and Repair
96882 Traffic Signal Installation
96883 Traffic Signal Maintenance and Repair
96884 Traffic Control Services, Including Placement and Removal of Control Devices
96885 Traffic Counting Services
96889 Traffic Studies and Analysis Services
55010 Cement and Adhesives for Traffic Control Markers
55017 Encapsulate, Traffic Loop Detector
55022 Gaskets, Traffic Markers and Dividers
55078 Traffic Cones, Lane Markers, and Barricades, Portable
55079 Traffic Control Devices, Non-Electric. Including Rumble Strips, etc.
55080 Traffic Controls and Equipment, Electric Systems
55081 Traffic Controls and Equipment, Electric Parts
55082 Traffic Counters, Monitors, and Accessories
55083 Traffic Devices, Markers, Plaques, etc. Recycled
55085 Traffic Signal Poles, Standards, and Brackets
55088 Traffic Signals and Equipment, Electric Systems
55089 Traffic Signals and Equipment, Electric Parts
55090 Transportation Systems, Intelligent (An automated information system which provides traffic manageme
91117 C.I.P., Construction, Roads
91232 Construction, Street Lighting
91260 Maintenance and Repair, Street Lighting
91276 Striping: Streets, Parking Facilities, Lane Divisions, Paint, etc.
91350 Construction, Streets, Major and Residential, Including Reconstruction
91384 Maintenance and Repair, Streets, Major and Residential
91396 Paving and Resurfacing, Streets, Major and Residential
BuyerContact:

Bonnie Davis
bdavis@atlantaga.gov

404-327-1625

Attachment Preview

EXHIBIT - A
GENERAL SCOPE OF SERVICES
GROUP - 3

On Street Quad From Street To Street Mix Type Spread Rate
BENJAMIN E MAYS DRIVE SW FAIRBURN ROAD CASCADE ROAD 12.5MM 220
GREENBRIAR PARKWAY SW CAMPBELLTON ROAD CONTINETAL COLONY PARKWAY 12.5MM 220
LAKEWOOD AVENUE SE MACON DRIVE CLAIRE DRIVE 12.5MM 220
Spread
Rate

SCOPE OF WORK, SCHEDULE OF QUANTITIES, AND PRICES - Group 3
1.0 SCOPE OF WORK
The scope of work for this project consists of public right-of-way (ROW) improvements 4.32 centerline miles/ 16.59 lane miles of
asphalt resurfacing, milling, point repairs, roadway striping, loop detector repairs, ramp upgrade for ADA compliance, ADA ramp
installation, adjustments to utility and other miscellaneous structures in the ROW. Manhole, Water Valve, and Drop Inlet (Catch
Basin) adjustments are to be encased with concrete pads around the structures. All work shall be done in accordance with GDOT
standards and specifications. The quantities of the improvements are listed on the bid for pricing. Project List attached along with
mix type and spread rate.
Spread
On Street Quad From Street To Street Mix Type Rate
BENJAMIN E MAYS DRIVE SW FAIRBURN ROAD CASCADE ROAD 12.5MM 220
CONTINETAL COLONY
GREENBRIAR PARKWAY SW CAMPBELLTON ROAD PARKWAY 12.5MM 220
LAKEWOOD AVENUE SE MACON DRIVE CLAIRE DRIVE 12.5MM 220
Variable depth Milling of 112 inches to 2 inches of existing pavement and overlay with 112 inches to 2 inches of 12.5mm (as noted
on the attached, but not limited to this project list) with point patching and levelling performed as needed to prevent water
accumulation on pavement, restore proper grade and / or transverse slope for positive drainage. The CONTRACTOR will need to
make safe any utilities exposed as a result of deep patching / milling as directed by the Engineer.
2.0 MILESTONES AND LIQUIDATED DAMAGES
Contractor shall complete the work in accordance with the milestones set forth in Exhibit A.3 of the Agreement. Time is of the
essence under this Agreement. The Failure to meet any milestone or any substantial completion deadline, without prior written
approval from the City, may subject Contractor to liquidated damages.
Liquidated damages in the amount of $1,000.00 per calendar day shall apply for each calendar day that Substantial completion is
delayed beyond the date established in Exhibit A.3, unless otherwise approved in writing by the City.
3.0 UNIT & LUMP SUM PRICES
Unit and Lump Sum prices quoted in the Schedule of Unit & Lump Sum Prices shall be firm all-inclusive prices. Payment of the
Unit and/or Lump Sum prices shall constitute full payment for performance of the corresponding work and shall cover all costs of
whatever nature incurred by the CONTRACTOR in accomplishing the Work in accordance with the provisions of this Contract.
4.0 QUANTITIES
The quantities noted in the Schedule of Unit & Lump Sum Prices, are approximations subject to variations as stated in 5.0 and no
claim shall be made for deficiency or over-run, actual or relative. Payment will be made for the actual quantities of each Schedule
of Unit Prices item incorporated into the work in accordance with the Contract requirements based on the unit prices established in
the Schedule.
5.0 PERFORMANCE AND PAYMENT SECURITIES
The cost of the Performance and Payment Bonds are to be distributed through the various items of work.
6.0 ADJUSTMENTS
All prices are fixed for the duration of this Agreement and are not subject to escalation for any cause. Payment of the Total
Contract Price shall constitute full payment for performance of the Work and covers all costs of whatever nature incurred by
CONTRACTOR in accomplishing the Work in accordance with the provisions of the Agreement.
The CITY reserves and shall have the right to make such adjustments in the work as may be necessary or desirable to complete
the work originally intended in an acceptable manner. Unless otherwise specified herein, the CITY may make such adjustments
in the work which may increase or decrease the originally awarded quantities. Such Adjustments shall not invalidate the
Agreement nor release the Surety, and the Contractor agrees to accept payment for such adjustments as if the altered Work had
been a part of the original Agreement.
Adjustments that are within the General Scope of Work shall be covered by Change Order issued by the Engineer. Change Orders
for altered Work shall include extensions of contract time where, in the Engineer's opinion such extensions are commensurate with

the amount and difficulty of added Work.
If the CITY and the CONTRACTOR are unable to agree on a unit price adjustment for any item that requires a Change Order, the
City reserves the right to procure the item separately and/or make other arrangements for its completion.
All Change Orders shall require consent of the Contractor's Surety and an increase of the Performance and Payment Bonds, if
applicable. Adjustments shall not increase the total cost of the Project, based on the originally estimated quantities and the unit
prices bid. Should it become necessary for the best interest of the City to make changes in excess of those herein specified, the same
shall be covered by Change Order.
7.0 DEPARTMENT SUBMITTALS
Within fifteen (15) days of Contract award but before site mobilization, whichever is earlier, the following documents shall be
submitted:
1. Contract Schedule;
2. Safety and Health Plan;
3. Quality Control Plan;
4. Materials Submittals
5. Environmental Compliance Plan.
6. Traffic Control Plan
8.0 Georgia Department of Transportation (GDOT) Standard Specifications
Unless otherwise directed, all work performed under this contract shall be in accordance with the Georgia Department of
Transportation (GDOT) Standard Specifications. Construction of Transportation Systems, current edition, and applicable Georgia
Department of Transportation and Supplemental Specifications and Special Provisions modifying them. Work must also conform
with the City of Atlanta Department of Transportation Details and Specifications. All documents are incorporated herein by
reference as if fully set forth.
All references to GDOT Standard Specifications and Special Provisions can be found at:
http://www.dot.ga.gov/doingbusiness/theSource/Pages/specifications.aspx.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Bid # Bid/Proposal Name Pre-Bid/Pre-Proposal Bid/Proposal Opening Bid Tabulation ITB 27-006 Speed Table ...

City of Albany

Bid Due: 8/17/2026

...Natural Gas Pipeline Construction (PDF, 7MB) 08/18 09/16/2026...

City of Albany

Bid Due: 9/16/2026

...RFQ for Engineering and Construction Services Development Authority Of Dawson County Aug 07, ...

State Government of Georgia

Bid Due: 9/07/2026

...26-181 Construction Svcs for May Park Improvements Available Date: 7/23/2026 Due Date: 8/18/2026... ...

https://www.augustaga.gov/

Bid Due: 8/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.