| Location: | Florida |
|---|---|
| Posted: | Jul 2, 2026 |
| Due: | Jul 16, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SS-26-045 |
| Publication URL: | To access bid details, please log in. |
Project Description: 2 PC Cornell Model 4NNW–F-16-7.5-6 horizontal mounted pump cast iron construction and ductile iron heat treated impeller to pump 570 GPM to a discharge head of 22 feet when operating at 1170 RPM and driven by a 7.5 HP 1200 RPM 3 phase 60 hertz 460-volt motor with premium, efficiency, corrosive duty, 1.15 SF, class F insulation, and TEFC enclosure.
Equipment as above complete with 420 SS HT shaft sleeve, mechanical cyclo-seal (no seal piping required), 420 HT wear rings, clean out port, 125 LB FF Flanged suction and 125 LB FF flanged discharge, and all
mounted on a common bed plate, coupling and hinged OSHA guard.

With GovernmentContracts, you can:
...Construction Advertisement Number: AWARD-DOT-10/11-7008SD Version Number: 000 Advertisement Begin Date...
State Government of Florida
Bid Due: 10/11/2070
...CONSTRUCTION OF POLE BARN Bid No. 2026-05 Status: Closes: Open 8/18/2026 2:00 PM...
City of Palatka
Bid Due: 8/18/2026
...Title Contract Construction Project Manager Secondary Contact Number RFP 2027-4100-01 Tertiary... Performance Bond ...
Brevard County School Board
Bid Due: 7/27/2026
...Title Construction Management Continuing Services Solicitation Type RFP - Non-Construction Status... for Qualifications ...
City of Jacksonville
Bid Due: 8/20/2026