| Location: | North Carolina |
|---|---|
| Posted: | Oct 8, 2026 |
| Due: | Oct 20, 2026 |
| Agency: | Guilford County Schools |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 6850 |
| Publication URL: | To access bid details, please log in. |
| QuoteID | Description | Bids Closed | Scope of Work | ||
|
6850
|
Northwest High Low Slope Roof
|
10/20/2026
|
SECTION000101
PROJECTTITLEPAGE
PROJECTMANUAL
FOR
GUILFORDCOUNTYBOARDOFEDUCATION
714GREENVALLEYROAD,
GREENSBORO,NORTHCAROLINA27408
NORTHWESTGUILFORDHIGHSCHOOLLOW-SLOPEROOFREPLACEMENT
5240NWSCHOOLROAD,
GREENSBORO,NORTHCAROLINA 27409
REIPROJECTNO.R26CLT-060
09-04-2026
PREPAREDBY:
1927J.N.PEASEPLACE,SUITE201,CHARLOTTE,NC28262
NORTHCAROLINAFIRMLICENSEC-1520
NorthwestGuilfordHighSchool
000101-1 PROJECTTITLEPAGE
Low-SlopeRoofReplacement
| ProfessionalEngineer |
|---|
| Digitally signed by Jeremiah Webster DN: C=US, E=jwebster@reiengineers.com, O=REI Engineers, CN=Jeremiah Webster Date: 2026.09.28 18:28:26-04'00' |
SECTION000107
SEALSPAGE
PART1GENERAL
1.1 SUMMARY
A. DesignFirmforNorthwestGuilfordHighSchoolLow-SlopeRoofReplacementwithProject
Manualdated09-04-2026:
1. REIEngineers,Inc.,1927J.N.PeasePlace,Suite201,Charlotte,NC28262.
2. NorthCarolinaFirmLicenseC-1520
ProfessionalEngineer
Digitally signed by Jeremiah Webster
DN: C=US,
E=jwebster@reiengineers.com, O=REI
Engineers, CN=Jeremiah Webster
Date: 2026.09.28 18:28:26-04'00'
ENDOFSECTION
NorthwestGuilfordHighSchool
000107-1 SEALSPAGE
Low-SlopeRoofReplacement
SECTION000110
TABLEOFCONTENTS
PROCUREMENTANDCONTRACTINGREQUIREMENTS
1.1 DIVISION00--PROCUREMENTANDCONTRACTINGREQUIREMENTS
A. 000101-ProjectTitlePage
B. 000107-SealsPage
C. 000115-ListofDrawings
D. 001113-AdvertisementforBids
E. 002113-InstructionstoBidders
F. 003126.23 -ExistingAsbestosInformation
G. 004113 -BidForm
H. 004313 -BidBondForm
I. 005213 -StandardFormofAgreement
J. 006000-ProjectForms
K. 006113.13 -PerformanceBondForm
L. 006113.16 -PaymentBondForm
M. 006233 -RoofManufacturer'sAcknowledgment
N. 006313 -RequestforInterpretation
O. 006325-SubstitutionRequestForm
P. 006355 -ChangeProposalForm
Q. 006536 -Contractor'sWarranty
R. 006537 -AsbestosFreeWarranty
SPECIFICATIONS
2.1 DIVISION01--GENERALREQUIREMENTS
A. 011100 -SummaryofWork
B. 011400 -WorkRestrictions
C. 012100-Allowances
NorthwestGuilfordHighSchool
000110-1 TABLEOFCONTENTS
Low-SlopeRoofReplacement
D. 012200-UnitPrices
E. 012300-Alternates
F. 012500-SubstitutionProcedures
G. 012600 -ContractModificationProcedures
H. 012900 -PaymentProcedures
I. 013100 -ProjectManagementandCoordination
J. 013300 -SubmittalProcedures
K. 014000-QualityRequirements
L. 014200 -ReferenceStandards
M. 015000-TemporaryFacilitiesandControls
N. 017300 -ExecutionRequirements
O. 017400 -CleaningandWasteManagement
P. 017700 -CloseoutProcedures
2.2 DIVISION03--CONCRETE
A. 035200 -LightweightConcreteRepairs
B. 035216.13 -LightweightCellularInsulatingConcrete
2.3 DIVISION06--WOOD,PLASTICS,ANDCOMPOSITES
A. 061000-RoughCarpentry
2.4 DIVISION07--THERMALANDMOISTUREPROTECTION
A. 070150 -PreparationforRe-Roofing
B. 072216 -RoofInsulation
C. 072600-ModifiedBitumenVaporRetarder
D. 074213-MetalWallPanels
E. 074293 -MetalSoffitPanels
F. 075400-ThermoplasticMembraneRoofing
G. 076200-SheetMetalFlashingandTrim
2.5 DIVISION09--FINISHES
A. 099113-ExteriorPaint
NorthwestGuilfordHighSchool
000110-2 TABLEOFCONTENTS
Low-SlopeRoofReplacement
B. 099659 -TranslucentSiliconeCoating
2.6 DIVISION22--PLUMBING
A. 221426 -RoofDrains
ENDOFSECTION
NorthwestGuilfordHighSchool
000110-3 TABLEOFCONTENTS
Low-SlopeRoofReplacement
SECTION000115
LISTOFDRAWINGS
PART1GENERAL
1.1 SUMMARY
A. Thefollowingdrawingsdated09-04-2026areincludedaspartoftheContractDocuments:
1. G-001Cover
2. XR101SitePlan
3. XR102RoofPlan
4. XR103RoofPlan
5. XR104RoofPlan
6. XR105RoofPlan
7. XR301RoofSystems
8. XR501Details
9. XR502Details
10. XR503Details
11. XR504Details
12. XR505Details
13. XR506Details
14. XR507Details
ENDOFSECTION
NorthwestGuilfordHighSchool
000115-1 LISTOFDRAWINGS
Low-SlopeRoofReplacement
SECTION001113
ADVERTISEMENTFORBIDS
PART1GENERAL
1.1 PROJECTINFORMATION
A. ProjectName:NorthwestGuilfordHighSchoolLow-SlopeRoofReplacement
B. ProjectAddress:5240NWSchoolRoad, Greensboro,NorthCarolina 27409
C. Owner:GuilfordCountyBoardofEducation
1.2 BIDS
A. SealedbidsfortheprojectwillbereceivedfrombiddersbytheOwnerat714GreenValley
Road, Greensboro, North Carolina 27408, Conference Room 2A, until 2:00 PM on 10-
20-2026,atwhichtimetheywillbepubliclyopenedandread.
1.3 PROJECTDOCUMENTS
A. ElectronicprojectdocumentsmaybeobtainedfromtheEngineer,REIEngineers,Inc.,1927
J.N. Pease Place, Suite 201, Charlotte, NC 28262, George Urbaniuk,
gurbaniuk@reiengineers.comatnocost.
1.4 BIDDINGREQUIREMENTS
A. All bidders are hereby notified that they shall be properly licensed under the state laws
governingtheirtrades.
B. Bid security in the amount equal to not less than 5% of the gross amount of the bid is
required.
C. APerformanceBondandPaymentBondintheamountofthecontractisrequired.
D. SubmitquestionstoREIEngineers,Inc.inwritingtotheProjectManager'semailaddress
listedabovenolaterthan5:00PMatleast7 dayspriortothebidduedate.
1.5 PRE-BIDMEETING
A. A Pre-Bid Meeting is scheduled for 10:00 AM on 10-08-2026 at the project address listed
above.
B. Attendanceisrecommended.
ENDOFSECTION
NorthwestGuilfordHighSchool
001113-1 ADVERTISEMENTFORBIDS
Low-SlopeRoofReplacement
SECTION002113
INSTRUCTIONSTOBIDDERS
PART1GENERAL
1.1 DEFINITIONS
A. The Bidding Documents consist of the Advertisement or Invitation to Bid, Instructions to
Bidders,BidForm,andothersamplebiddingandcontractforms.
B. TheproposedContractDocumentsconsistoftheFormofAgreementbetweentheOwner
and Contractor, Conditions of the Contract (General, Supplementary and other
Conditions), Drawings, Specifications and Addenda issued prior to execution of the
Contract.
C. Addenda are written or graphic instruments issued by the Engineer prior to the execution
of the Contract which modify or interpret the Bidding Documents by additions, deletions,
clarificationsorcorrections.
D. ABidisacompleteandproperlyexecutedproposaltodotheWorkforthesumsstipulated
therein,submittedinaccordancewiththeBiddingDocuments.
E. TheBaseBidisthesumstatedintheBidforwhichtheBidderofferstoperformtheWork
described in the Bidding Documents as the base, to which Work may be added or from
whichWorkmaybedeletedforsumsstatedinAlternateBids.
F. An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted
fromtheamountoftheBaseBidifthecorrespondingchangeintheWork,asdescribedin
theBiddingDocuments,isaccepted.
G. AUnitPriceisanamountstatedintheBidasapriceperunitofmeasurementformaterials,
equipmentorservicesoraportionoftheWorkasdescribedintheBiddingDocuments.
H. ABidderisapersonorentitywhosubmitsaBidandwhomeetstherequirementssetforth
intheBiddingDocuments.
I. A Sub-bidder is a person or entity who submits a bid toa Bidder for materials, equipment
orlaborforaportionoftheWork.
1.2 BIDS
A. Submit Bid Form along with required enclosures in a sealed envelope, with the Bidder's
name,licensenumber,andprojectnamewrittenontheoutside;placethissealedenvelope
inanotherenvelopeanddelivertotheOwnerattheaddressspecified.
B. Bids will be received until the date and time specified at which time they will be publicly
openedandread.
C. Fill in and sign the bid form correctly. Bids that show any omission, alterations of form,
additionsnotcalledfor,conditionalBids,oranyirregularitiesofanykindmayberejected. If
erasures are necessary and appear on the forms, each such erasure must be initialed by
thepersonsigningtheproposal.
D. Bidsthatarenon-responsiveorfailtofollowtheInstructionstoBiddersmayberejected.
NorthwestGuilfordHighSchool
002113-1 INSTRUCTIONSTOBIDDERS
Low-SlopeRoofReplacement
E. NobidmaybewithdrawnafterreceiptofBidsforaperiodof60days.
1.3 ACCEPTANCEOFBID(AWARD)
A. ItistheintentionoftheOwnertoawardacontractforworkunderthisprojecttothelowest
responsible Bidder; however, in the interest of suitability to the need of the Owner and/or
economy, equipment, materials and furnishings other than the lowest in price may be
selected.
B. TheOwnerreservestherighttorejectanyorallBids,toacceptanybidsubmitted,towaive
any formalities, and to negotiate with the low Bidder or Bidders any changes considered
necessaryordesirable. TheOwnerreservestherighttorejectanyBidwhensuchrejection
is in the interest of the Owner to reject the bid of the bidder who has previously failed to
performortocompleteontimeContractsofasimilarnature;andtorejectthebidofabidder
whoisnot,intheopinionoftheEngineer,inapositiontoperformtheContract.
C. The Owner shall have the right to accept Alternates in any order or combination, unless
otherwisespecificallyprovidedintheBiddingDocuments,andtodeterminethelowBidder
on the basis of the sum of the Base Bid and Alternates accepted. Alternates may be
acceptedatanytimeduringthebidholdingperiod.
1.4 PRE-BIDMEETING
A. Refer to the invitaiton or adveristement for bids for the date, time and location of the Pre-
BidMeeting.
B. APre-BidMeetingwillbeheldforpurposesofconsideringquestionsposedbyBidders. All
interpretations and corrections to Contract Documents deriving from this meeting will be
documentedviaAddendum.
C. IftheBidderdoesnotattendthePre-BidMeeting,itistheBidder'sresponsibilitytoobtain
thePre-BidMeetingMinutesandallAddenda.
1.5 DISQUALIFICATION
A. TheOwnerreservestherighttodisqualifyBids,beforeorafteropening,uponevidenceof
collusionwithintenttodefraudorcommitotherillegalpracticesuponthepartoftheBidder.
1.6 CONTRACTOR'SLICENSE
A. AllBiddersmusthaveproperlicensesforcontractorsasrequiredbyStateLaw. TheBidder's
license number shall be listed on the bid form and on the outside of the inner sealed
envelopeinwhichthebidissubmitted.
1.7 CONFLICTOFINTEREST
A. Bidders must disclose in writing with their bid the name of any owner, officer, director, or
agentwhoisalsoanemployeeoftheOwner.
B. BiddersmustdiscloseinwritingwiththeirbidthenameofanyemployeeoftheOwnerwho
owns,directlyorindirectly,aninterestof5percentormoreintheBidder'sfirmoranyofits
branchesorsubsidiaries.
C. Bysubmittingabid,theBiddercertifiesthatthereisnorelationshipbetweentheBidderand
any person or entity which is, or gives the appearance of, a conflict of interest related to
thisproject.
NorthwestGuilfordHighSchool
002113-2 INSTRUCTIONSTOBIDDERS
Low-SlopeRoofReplacement
1.8 NON-DISCRIMINATION
A. TheBiddershallnotdiscriminateagainstanyindividualsandwilltakeproactivemeasures
toassurecompliancewithallFederalandStaterequirementsconcerningfairemployment,
employment of people with disabilities, and concerning the treatment of all employees
withoutregardtodiscriminationbaseduponage,race,color,religion,sex,nationalorigin,
ordisability.
1.9 INTERPRETATIONOFDRAWINGSANDSPECIFICATIONS
A. Examine Drawings and Specifications and all Addenda or other revisions thereto and
thoroughly familiarize himself with the detailed requirements thereof prior to submitting a
proposal.
B. ShouldaBidderfinddiscrepanciesorambiguitiesin,oromissionsfromtheSpecifications
andDrawingsboundherein,orshouldbeindoubtastotheirmeaning,notifytheEngineer
in writing immediately. Engineer will issue an interpretation in the form of an addendum.
ThisaddendumwillbeforwardedtoallBiddersofrecord.
C. Addenda will be issued no later than four days prior to the date for receipt of Bids except
anAddendumwithdrawingtherequestforBidsoronewhichincludespostponementofthe
dateforreceiptofBids.
D. Actpromptlyandallowsufficienttimeforareplytobeprovidedbeforethedateestablished
forsubmissionofBids.
E. AcknowledgereceiptofalladdendaontheBidForm.
F. NooralinterpretationswillbemadetoanyBidderastothemeaningorintentoftheContract
DocumentsorbeeffectivetomodifyanyoftheprovisionsoftheContractDocuments.
1.10 SUBSTITUTIONS
A. References are made to certain specific products solely to denote the quality standard of
the desired product and are not intended to restrict Bidders to a specific brand, make,
manufacturer,orname. Theseproductshavebeennotedtoassistinestablishingmaterial
types and acceptable products. Equivalent products will be considered acceptable
providedthattheapprovalofthespecificproducthasbeengiveninwritingbytheEngineer.
B. Writtenrequestsforsubstitutionofequivalentproductsfromprimebidderswillbeconsidered
ifreceivedbytheEngineer14calendardayspriortothebidopening.
C. Identifytheproductorthefabricationorinstallationmethodtobereplacedineachrequest.
Includerelatedspecificationsectionsanddrawingnumber.
D. Providecompletedocumentationonboththeproductspecifiedandtheproposedsubstitution
includingthefollowinginformationasappropriate:
1. Comparisonofspecifiedandproposedsubstituteproductdata,fabricationdrawings,
andinstallationprocedures.
2. Sampleswhereapplicableorrequested.
3. Detailedcomparisonofsignificantqualitiesoftheproposedsubstitutionwiththose
oftheworkspecified.
NorthwestGuilfordHighSchool
002113-3 INSTRUCTIONSTOBIDDERS
Low-SlopeRoofReplacement

With GovernmentContracts, you can:
...(Optional) https://facilities.ofa.ncsu.edu/category/ads/ Project Name Roof Repairs Phase 3 - College... of Veterinary Medicine ...
University of North Carolina System
Bid Due: 11/17/2026
...Solicitation Number: 10474263-01-27 Project Title: Buggy Building Roof Replacement Description...: Lee County is ...
State Government of North Carolina
Bid Due: 11/10/2026
...pre-engineered metal panel roof. Plans and specifications will be available at the Pre-Bid ...
State Government of North Carolina
Bid Due: 11/03/2026
...Bid Location NC State University https://facilities.ofa.ncsu.edu/category/ads/ Roof Repairs Phase 3... Solicitation Number: 68-31686-PQB ...
State Government of North Carolina
Bid Due: 11/17/2026