| Location: | Florida |
|---|---|
| Posted: | Mar 14, 2025 |
| Due: | Apr 23, 2025 |
| Agency: | Sarasota County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Transmission Main & Pump Station #3 Improvements
Addenda: 0
Release Date: 3/14/2025
Due Date: 4/23/2025
IFB Construction
Installing an extension to a 30-inch potable water transmission main along Ashton Rd to the County's portable water Pump Station #3 site. PS #3 work will include improvements to control the refill of the water storage tanks, SCADA controls, piping configurations, limited paving & minor site improvements as stated herein.
The County anticipates to execute a Construction Contract for the duration of the Project.
Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements

With GovernmentContracts, you can:
...Bid Information Type RFP Status Issued Number 2027-003 (REPLACEMENT OF THE EXISTING SCADA ...
The City of Lauderhill, Florida
Bid Due: 11/16/2026
...compatible with the City's existing Supervisory Control and Data Acquisition (SCADA) system. The...
City of Tallahassee
Bid Due: 11/17/2026
...piping and valving, site civil improvements, structural foundations, electrical and SCADA/I&C... piles, mat ...
City of Flagler Beach
Bid Due: 11/30/2026
...Technology (OT) and SCADA systems are excluded from the scope of services. Dates(All ...
Kissimmee Utility Authority
Bid Due: 11/17/2026