| Location: | Florida |
|---|---|
| Posted: | Mar 14, 2025 |
| Due: | Apr 23, 2025 |
| Agency: | Sarasota County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Transmission Main & Pump Station #3 Improvements
Addenda: 0
Release Date: 3/14/2025
Due Date: 4/23/2025
IFB Construction
Installing an extension to a 30-inch potable water transmission main along Ashton Rd to the County's portable water Pump Station #3 site. PS #3 work will include improvements to control the refill of the water storage tanks, SCADA controls, piping configurations, limited paving & minor site improvements as stated herein.
The County anticipates to execute a Construction Contract for the duration of the Project.
Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements

With GovernmentContracts, you can:
...Project ID: Y26-748 Title: East Water Reclamation Facility SCADA Upgrades with Fiber and ...
Orange County
Bid Due: 8/11/2026
...Project ID: Y26-748 Title: East Water Reclamation Facility SCADA Upgrades with Fiber and ...
Orange County
Bid Due: 7/28/2026
..., Supervisory Control and Data Acquisition (SCADA) System Advisory, Cybersecurity, and Telemetry...
Toho Water Authority
Bid Due: 8/13/2026
...(SCADA) systems, communication equipment, instrumentation, security systems, and operational controls...
Toho Water Authority
Bid Due: 8/06/2026