| Location: | Florida |
|---|---|
| Posted: | Mar 14, 2025 |
| Due: | Apr 23, 2025 |
| Agency: | Sarasota County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Transmission Main & Pump Station #3 Improvements
Addenda: 0
Release Date: 3/14/2025
Due Date: 4/23/2025
IFB Construction
Installing an extension to a 30-inch potable water transmission main along Ashton Rd to the County's portable water Pump Station #3 site. PS #3 work will include improvements to control the refill of the water storage tanks, SCADA controls, piping configurations, limited paving & minor site improvements as stated herein.
The County anticipates to execute a Construction Contract for the duration of the Project.
Refer to the Solicitation Documents and Attachments section for minimum qualifications, scope/specifications, and insurance requirements

With GovernmentContracts, you can:
...1412173648 (IFB) RiverTown Storage Tank and Pumping System - Phase II The purpose... ...
JEA
Bid Due: 6/23/2026
...Contact Leigh Doran Title East Putnam Regional Water Tank Maintenance Secondary Contact Number ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/09/2026
...inspection, cleaning, evaluation, and repair services for its water storage tanks and contact ...
Seminole County
Bid Due: 6/24/2026
...Contact Leigh Doran Title East Putnam Regional Water Tank Maintenance Secondary Contact Number ...
Brevard County School Board
Bid Due: 7/09/2026