WHITEWATER HIGH SCHOOL RENOVATIONS 10/08/26
ITB 27-004-075
FAYETTE COUNTY SCHOOLS
PBK PN 240477
PBK, P.O. BOX 880, GRIFFIN, GA 30223
ADDENDUM NUMBER THREE: DATED: October 08, 2026
To: All prime contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications
and Drawings dated September 11, 2026, as noted below. Acknowledge receipt of this
Addendum in the space provided on the Bid Form; failure to do so may subject bidder to
disqualification.
BID DATE: November 5, 2026
SPECIFICATIONS
1. Section 001113 - INVITATION TO BID
A. Delete this section in its entirety and replace with section of same name included within
this addendum.
1. A revision to the Pre-bid location has been included to relocate to the Fayette
County Board of Education office located at 205 LaFayette Avenue,
Fayetteville, GA. Time and date unchanged from previous addenda.
2. Section 012100 - ALLOWANCES
A. Delete this section in its entirety and replace with section of same name included within
this addendum.
1. A lump sum allowance is included to cover the cost of replacing existing
gasketing and insulated glass panes in skylights.
3. Section 013540 - SPECIAL PROCEDURES FOR MOVE MANAGEMENT
A. Add this specification section included in this addendum.
1. The section includes instructions for the contractor in regard to moving,
relocating, and storing furniture within the existing building.
4. Section 087100 - DOOR HARDWARE
A. Add this specification section to the project manual included in this addendum
1. The section includes both front-end specifications and door hardware sets.
5. Section 230900 - INSTRUMENTATION AND CONTROL FOR HVAC
A. Delete Section 230900 in its entirety and replace with Section 230900, dated
6. Section 232113 - HYDRONIC PIPING
A. On page 13, delete paragraph 3.8 in its entirety and replace it with the following:
"3.8 LOOP WATER SYSTEM START-UP AND TREATMENT
1. After pressure testing piping and correction for any piping leaks, the piping
system shall be thoroughly flushed of all foreign matter and debris. At each
water source heat pump air conditioner, the hose assemblies shall be
temporarily disconnected from the units and the supply hose looped back to the
Addendum No. 3 - Page 1 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 10/08/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
return piping in order to bypass each WSHP. Close valves to heat exchanger
and open bypass valve. The entire piping system shall be filled with fresh water
and the system pumps shall be started to circulate the water. The system
strainers shall be checked frequently and cleaned as needed. If the water is
extremely dirty, the system shall be continuously flushed using the make-up
water station and discharging to a drain. Once the system water is clear, the
pump shall be stopped, valves opened to the coil, heat exchanger bypass valve
shall be closed and valve to heat exchanger opened, each WSHP re-connected
to the system and the entire new system re-filled using fresh water and adding
a cleaning agent such as trisodium phosphate (TSP). Circulate this solution
throughout the piping system and continue to operate for 3 hours. Then turn off
the system pump and refill with fresh water. Add chemical treatment as
specified in Division 23 - HVAC Water Treatment. Provide 48-hour prior notice
to Architect to allow Owner/Architect to witness the water system start up and
treatment.
DRAWINGS
STRUCTURAL
1. SHEET S201 BATTING FACILITY FOUNDATION PLAN AND DETAILS
A. Delete General Note; "TO ACCOUNT FOR ANY POTENTIAL UNREALIZED
CONDITIONS, THE GNERAL CONTRATOR SHALL PROVIDE AN
ALLOWANCE FOR AN ADDITIONAL 30 CUBIC YARDS OF CONCRETE.
ALLOWANCE SHALL INCLUDE/ACCOUNT FOR ALL COSTS FOR MATERIAL,
FABRICATION, DELIEVERY, LABOR FOR INSTALLATION/PLACEMENT,
FORMWORK, ETC. REINFORCEMENT FOR CONCRETE SHALL ALSO BE
INCLUDED AS PART OF ALLOWANCE AND SHALL BE ASSUMED TO BE 3%
MINIMUM BY VOLUME, ANY UNUSED PORTION OF THE 30 CUBIC YEARDS
OF CONCRETE SHALL BE CREDITED BACK TO THE OWNER."
ARCHITECTURAL
1. SHEET AD-101.1 DEMOLITION FLOOR PLAN - SECTOR A-F
A. Detail No.1, Demolition Floor Plan - Sector A-F; All existing mop sinks marked
for demolition in red linework will instead be considered "Existing to Remain"
B. Delete demo note "D1" from the following spaces: 720, 720.1, 720.6, 720.8,
720.9, 720.10
C. Add demo keynote "D4" to the following spaces: 716, 116.1, 901, 901.01
D. General Arch Demolition Notes, No.7: "ALL FURNITURE WILL BE REMOVED
OR RELOCATED BY THE OWNER AS NESSESSARY PRIOR TO THE
COMMENCEMENT OF DEMOLITION WORK OF THIS PROJECT.
CONTRACTOR SHALL COORDINATE WITH OWNER AS REQUIRED." Revise
to read "ALL FURNITURE WILL BE REMOVED, RELOCATED, AND STORED
BY THE CONTRACTOR IN ACCORDANCE WITH SPEC SECTION 01 3540."
E. General Arch Demolition Notes; Add note No.22.: REFER TO REFLECTED
CEILING PLANS FOR COMPLETE SCOPE OF CEILING DEMOLITION.
Addendum No. 3 - Page 2 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 10/08/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
2. SHEET AD-101.2 DEMOLITION FLOOR PLAN - SECTOR G,H,I,K
A. Detail No.1, Demolition Floor Plan - Sector A-F; All existing mop sinks marked
for demolition in red linework will instead be considered "Existing to Remain"
B. Remove demo note "D1" from the following spaces: 720, 720.1,720.6, 720.8,
720.9, 720.10
C. General Arch Demolition Notes, No.7: "ALL FURNITURE WILL BE REMOVED
OR RELOCATED BY THE OWNER AS NESSESSARY PRIOR TO THE
COMMENCEMENT OF DEMOLITION WORK OF THIS PROJECT.
CONTRACTOR SHALL COORDINATE WITH OWNER AS REQUIRED." Revise
to read "ALL FURNITURE WILL BE REMOVED, RELOCATED, AND STORED
BY THE CONTRACTOR IN ACCORDANCE WITH SPEC SECTION 01 3540."
D. General Arch Demolition Notes; Add note No.22.: REFER TO REFLECTED
CEILING PLANS FOR COMPLETE SCOPE OF CEILING DEMOLITION.
E. Keynote, No.24; EXISTING PLYWOOD STAGE TO BE REMOVED AND
REPLACED; PAINT BLACK. Revise to read: EXISTING PLYWOOD STAGE TO
BE SANDED, PREPPED, AND REPAINTED; BLACK.
3. SHEET AD-101.3 DEMOLITION FLOOR PLAN - SECTOR L,J,H.LL,K.LL
A. Detail No.1, Demolition Floor Plan - Sector A-F; All existing mop sinks marked
for demolition in red linework will instead be considered "Existing to Remain"
B. General Arch Demolition Notes, No.7: "ALL FURNITURE WILL BE REMOVED
OR RELOCATED BY THE OWNER AS NESSESSARY PRIOR TO THE
COMMENCEMENT OF DEMOLITION WORK OF THIS PROJECT.
CONTRACTOR SHALL COORDINATE WITH OWNER AS REQUIRED." Revise
to read "ALL FURNITURE WILL BE REMOVED, RELOCATED, AND STORED
BY THE CONTRACTOR IN ACCORDANCE WITH SPEC SECTION 01 3540."
C. General Arch Demolition Notes; Add note No.22.: REFER TO REFLECTED
CEILING PLANS FOR COMPLETE SCOPE OF CEILING DEMOLITION.
D. Keynote, No.24; EXISTING PLYWOOD STAGE TO BE REMOVED AND
REPLACED; PAINT BLACK. Revise to read: EXISTING PLYWOOD STAGE TO
BE SANDED, PREPPED, AND REPAINTED; BLACK.
4. SHEET AD-101AB DEMOLITION FLOOR PLAN - ATHLETIC BUILDINGS
A. General Arch Demolition Notes, No.7: "ALL FURNITURE WILL BE REMOVED
OR RELOCATED BY THE OWNER AS NESSESSARY PRIOR TO THE
COMMENCEMENT OF DEMOLITION WORK OF THIS PROJECT.
CONTRACTOR SHALL COORDINATE WITH OWNER AS REQUIRED." Revise
to read "ALL FURNITURE WILL BE REMOVED, RELOCATED, AND STORED
BY THE CONTRACTOR IN ACCORDANCE WITH SPEC SECTION 01 3540."
Addendum No. 3 - Page 3 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 10/08/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
5. SHEET A-101K FLOOR PLAN SECTOR K
A. Detail No.1, Level 1 - Area K Floor Plan
1. A CMU chase in Women 605 to accommodate mechanical revisions is
included in this addendum. Refer to Supplementary Drawing SDA-
101K included in this addendum.
6. SHEET A-101K.LL LOWER LEVEL FLOOR PLAN - SECTOR K
A. Detail No.1, Lower Level - Area K Floor Plan
1. In Football 857, Apply Detail Marker 12/A-621 to all lockers shown.
7. SHEET A-201.2 REFLECTED CEILING PLAN - SECTOR G,H,I,K
A. Ceiling Materials Legend; Add to Legend: NEW 09 5100.ACP2; ACOUSTICAL
CEILING PANEL TYPE 2 - VINYL FACED, [COLOR], 2'x2' WITH 09
5100.SWN1 15/16" SUSPENSION SYSTEM.
B. Delete ceiling material graphic shown in the following spaces: 821.1, 821.2.
Replace with material NEW 09 5100.ACP2 added above in this addendum.
8. SHEET A-201.3 REFLECTED CEILING PLAN - SECTOR L,J,H.LL,K.LL
A. Ceiling Materials Legend; Add to Legend: NEW 09 5100.ACP2; ACOUSTICAL
CEILING PANEL TYPE 2 - VINYL FACED, [COLOR], 2'x2' WITH 09
5100.SWN1 15/16" SUSPENSION SYSTEM.
B. Delete ceiling material graphic shown in the following spaces: 854.1, 854.2,
857.2, 857.3. Replace with material NEW 09 5100.ACP2 added above in this
addendum.
9. SHEET A-402 ENLARGED KITCHEN FLOOR PLAN
A. Delete Sheet A-402 in its entirety and replace with Sheet A-402 included in this
addendum.
10. SHEET A-810 DOOR SCHEDULE
A. Add General note No.1
1. Note to read "Install new interchangeable cores associated with
security gates at 13 locations. Contractor to coordinate with architect to
verifying locations."
11. SHEET A-921 WALL FINISH SCHEDULE
A. Finish Schedule Notes and Remarks, General Notes; Add General note No.8.
1. Note to read "The notation "PT" on this sheet refers a surface required
to be painted. Refer to spec section 09 9123."
Addendum No. 3 - Page 4 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 10/08/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
MECHANICAL
1. SHEET MD-101K.LL - MECHANICAL DEMOLITION LOWER LEVEL - AREA K FLOOR
PLAN
A. Delete Sheet MD-101K.LL in its entirety and replace with Sheet MD-101K.LL
included in this addendum.
2. SHEET MD-301 - MECHANICAL ROOM LARGE SCALE DEMOLITION FLOOR PLAN
A. Delete Sheet MD-301 in its entirety and replace with Sheet MD301 included in
this addendum.
3. SHEET M-101K - MECHANICAL LEVEL 1 - AREA K FLOOR PLAN
A. Delete Sheet M-101K in its entirety and replace with Sheet M-101K included in
this addendum.
4. SHEET M-101K.LL - MECHANICAL LOWER LEVEL - AREA K FLOOR PLAN
A. Delete Sheet M-101K.LL in its entirety and replace with Sheet M-101K.LL
included in this addendum.
5. SHEET M-301 - MECHANICAL ROOM LARGE SCALE NEW WORK FLOOR PLAN
A. Delete Sheet M-301 in its entirety and replace with Sheet M-301 included in this
addendum.
6. SHEET M-602 - MECHANICAL SCHEDULES, LEGEND & GENERAL NOTES
A. Delete Sheet M-602 in its entirety and replace with Sheet M-602 included in this
addendum.
Addendum No. 3 - Page 5 of 5
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.3 2026-10-07
SECTION001113-INVITATIONTOBID
SealedbidsfromGeneralContractorswillbereceivedbyFayetteCountySchoolsattheBoard
ofEducationOffice,205LaFayetteAvenue,Fayetteville,Georgiauntil3:00P.M.,Prevailing
Time,November05,2026,forWhitewaterHighSchool-Renovations,FayetteCounty,
Georgia.Atthetimeandplacenotedabove,thebidsfortheProjectwillbepubliclyopenedand
read.
Anon-mandatoryPre-BidConferencewillbeheldOctober15,2026,at1:00P.M.,atthe
BoardofEducationOffice,205LaFayetteAvenue,Fayetteville,Georgia
ElectronicbiddingdocumentsmaybeobtainedattheofficeofPBKArchitectsGeorgia,P.C.,
525EastTaylorStreet,P.O.Box880,Griffin,Georgia30223.Registrationfordocuments,
togetherwithnon-refundabledepositof$250.00shouldbefiledpromptlywiththeArchitects.A
sharefilelinkforaccessingPDFsofbiddocumentswillbeemailedassoonaspossible.Only
bidsreceivedfromContractorsregisteredwiththeArchitectwillbeaccepted.
BiddingDocumentsmaybeexaminedatthefollowinglocation(s):
a. ConstructConnectc/oCMDAttn:DPC
800-364-2059
b. DodgeData&Analytics
413-507-3179
c. PBKArchitectsGeorgia,P.C.
770-227-5473
OnlyabidsubmittedbyaBidderonrecordwiththeArchitectashavingreceivedplans
andspecificationsfromtheArchitectwillbeopened.
Thecontract,ifawarded,willbeonalumpsumbasis.Nobidmaybewithdrawnforaperiodof
60daysaftertimehasbeencalledondateofopening.BidsmustbeaccompaniedbyaBid
Bondinanamountnotlessthan5%oftheBaseBid.BothaPerformanceandaPaymentBond
willberequiredinanamountequalto100%oftheContractPrice.TheOwnerreservesthe
righttorejectanyorallbidsandtowaivetechnicalities.
For:FayetteCountySchools
By: Dr.JonathanPatterson
ENDOFSECTION 001113
001113- InvitationToBid
1
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.3 2026-10-07
This page intentionally left blank
001113- InvitationToBid
2
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.3 2026-10-07
SECTION012100-ALLOWANCES
PART1GENERAL
1.1 RELATEDDOCUMENTS
A. DrawingsandgeneralprovisionsoftheContract,includingGeneralandSupplementary
ConditionsandotherDivision01SpecificationSections,applytothisSection.
1.2 SUMMARY
A. Sectionincludesadministrativeandproceduralrequirementsgoverningallowances.
1. CertainitemsarespecifiedintheContractDocumentsbyallowances.Allowanceshave
beenestablishedinlieuofadditionalrequirementsandtodeferselectionofactual
materialsandequipmenttoalaterdatewhendirectionwillbeprovidedtoContractor.If
necessary,additionalrequirementswillbeissuedbyChangeOrder.
B. Typesofallowancesincludethefollowing:
1. Lump-sumallowances.
2. Quantityallowances.
3. Contingencyallowances.
C. RelatedRequirements:
1. Section004321"AllowancesForm"forformforallowancestobeincludedwiththeBid.
2. Section 012200"UnitPrices"forproceduresforusingunitprices.
1.3 SELECTIONANDPURCHASE
A. AttheearliestpracticaldateafterawardoftheContract,adviseArchitectofthedatewhenfinal
selectionandpurchaseofeachproductorsystemdescribedbyanallowancemustbe
completedtoavoiddelayingtheWork.
B. AtArchitect'srequest,obtainproposalsforeachallowanceforuseinmakingfinalselections.
IncluderecommendationsthatarerelevanttoperformingtheWork.
1.4 ACTIONSUBMITTALS
A. Submitproposalsforpurchaseofproductsorsystemsincludedinallowances,intheform
specifiedforChangeOrders.
1.5 INFORMATIONALSUBMITTALS
A. Submitinvoicesordeliveryslipstoshowactualquantitiesofmaterialsdeliveredtothesitefor
useinfulfillmentofeachallowance.
B. Submittimesheetsandotherdocumentationtoshowlabortimeandcostforinstallationof
allowanceitemsthatincludeinstallationaspartoftheallowance.
C. Coordinateandprocesssubmittalsforallowanceitemsinsamemannerasforotherportionsof
theWork.
1.6 COORDINATION
A. CoordinateallowanceitemswithotherportionsoftheWork.Furnishtemplatesasrequiredto
coordinateinstallation.
1.7 ALLOWANCES,GENERAL
A. OwnerreservestherighttouseunusedportionsofAllowancesforotherWorkrequiredbythe
Project.
1. TheOwnerorArchitectshalldirecttheContractorastotheuseofanyunused
Allowances.
B. Allowancesshownaregenerallyforunforeseenconditionsandareaboveandbeyondany
specificcontractmaterialandworkrequirements.
C. AllowanceLog: Keepalogofallallowancesusedandunused. Submitlogwitheach
applicationofpayment.
012100- Allowances
1
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.3 2026-10-07
1.8 LUMP-SUMALLOWANCES
A. RequirementsinthisArticlecoordinatewithAIADocumentA201. RevisetosuitProject.Line
itemsforeachlumpsumallowancescheduledshallbeincludedonthe"ScheduleofValues"
includedwiththeApplicationforLumpSumPayment.
B. Contractor'scostsassociatedwiththeallowancesshallbebasedontheinvoiceamountfrom
thesubcontractor/utilitycompanyplus712percentforContractor'shandling. Contractorshall
coordinateworkwithsubcontractor/utilitycompany,obtainwrittencostestimatefromthe
subcontractor/utilitycompany,andhaveestimateapprovedbyOwnerpriortobeginningwork.
C. Shouldthelumpsumallowancesbeexceeded,changeordersauthorizingadditionalcostsshall
beexecutedusingthesamebasisoftheoriginalallowance(subcontractor/utilitycompany
invoiceplus712percentforContractor'shandling).
D. Atprojectcloseout,creditallunusedallowancesremainingintheScheduleofValuestoOwner
byChangeOrder.
1.9 QUANTITYALLOWANCES
A. Usequantityallowancesasscheduledinthissectioninconjunctionwithunitpricesas
scheduledinSection012200"UnitPrices"todeterminelineitemvaluesassociatedwiththe
quantityallowancesschedule.
B. AllcostsassociatedwithQuantityAllowancesareaboveandbeyondquantitiesrequiredto
constructprojectasindicatedontheDrawings.
C. Lineitemsforeachquantityallowancescheduledshallbeincludedonthe"ScheduleofValues"
includedwithapplicationforpayments.
D. Contractorscostsassociatedwiththeselineitemvaluesshallincludeallcostnecessary,
includingbutnotlimitedtomaterials,delivery,installation,insurance,applicabletaxes,
overheadandprofit,laborburden,etc.
E. Shouldthequantityallowancesbeexceeded,changeordersauthorizingadditionalquantities
shallusethesameunitpriceasscheduledinSection012200"UnitPrices"foradditionalcost.
F. Atprojectcloseout,creditallunusedallowancesremainingintheScheduleofValuestoOwner
bychangeorder.
1.10 CONTINGENCYALLOWANCES
A. UsethecontingencyallowanceonlyasdirectedbyArchitectforOwner'spurposesandonlyby
ChangeOrdersthatindicateamountstobechargedtotheallowance.
B. Contractor'soverhead,profit,andrelatedcostsforproductsandequipmentorderedbyOwner
underthecontingencyallowanceareincludedintheallowanceandarenotpartoftheContract
Sum. Thesecostsincludedelivery,installation,taxes,insurance,equipmentrental,andsimilar
costs.
C. ChangeOrdersauthorizinguseoffundsfromthecontingencyallowancewillinclude
Contractor'srelatedcostsandreasonableoverheadandprofitmargins.
D. Lineitemsforeachcontingencyallowancescheduledshallbeincludedonthe"Scheduleof
Values"includedwithapplicationsforpayment.
E. AtProjectcloseout,creditunusedamountsremaininginthecontingencyallowancetoOwner
byChangeOrder.
PART2PRODUCTS
2.1 PRODUCTSANDORMATERIALSUSEDINALLOWANCESSHALLBEASDEFINEDOR
APPROVEDELSEWHEREINTHECONTRACTDOCUMENTS.
PART3EXECUTION
3.1 EXAMINATION
012100- Allowances
2
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.3 2026-10-07
A. IfunsuitablesoilsorrockareencounteredduringtheProject,theProjectTestingCompanyand
theEngineerofRecordshallbenotifiedimmediately.
3.2 UNSUITABLESOILSANDROCK
A. Removal,disposalandplacementofunsuitablesoilsmaterialsandanyrockshallbeatthe
recommendationoftheProject'sTestingCompanyandasapprovedbytheEngineerof
Record.
1. Removalshallincluderemovalbyacceptablemethodsandequipmentoftheminimum
quantitiesdeemednecessarybytheProject'sTestingCompany
2. Disposalshallincludedisposalofmaterialseitheronsiteoroffsiteasindicated. Disposal
ofmaterialsonsiteshallbeatthedirectionoftheEngineerofRecord. Rockmaterials
disposedofonsiteshallbeplacedinfillslopesasdirectedbytheEngineerofRecord.
Disposalofmaterialsoffsiteshallbeinaccordancewithapplicablelawsandregulations.
ItshallbetheresponsibilityoftheContractortodisposeofoffsitematerialsaccordingly.
3. Placeshallincludeobtainingsuitablebackfillandorfillmaterialsorstoneobtainedfrom
on-siteoroff-sitesourcesasindicatedandplacingmaterialsandcompactingtoProject
requirements. Materialsobtainedfromon-sitesourcesshallbeobtainedfromonsite
locationsasdirectedbytheEngineerofRecord.
4. Noallowancesshallbepaidunlessallquantitiesarequalified,quantifiedandapprovedby
theProjectsTestingCompanyandtheEngineerofRecord.
3.3 REMOVAL&RELOCATIONOFEXISTINGUTILITIES
A. RemovalorrelocationofutilitiesshallbecoordinatedbytheContractor.
3.4 PREPARATION
A. Coordinatematerialsandtheirinstallationforeachallowancewithrelatedmaterialsand
installationstoensurethateachallowanceitemiscompletelyintegratedandinterfacedwith
relatedwork.
3.5 SCHEDULEOFALLOWANCES
A. LumpSumAllowances
1. Includealumpsumamountof$25,000tocoverthecostofadditionalconcreterequired
byincreasingstructuralfootingsrequiredbythefinalloadcalculationsprovidedbythe
pre-engineeredbuildingsupplier.
2. Includealumpsumamountof$40,000toreplacetheexistingschoolmonumentsign.
3. Includealumpsumamountof$40,000tocoverthecostofgraphicspackagetobe
providedinthekitchenservinglinearea.
4. Includealumpsumamountof$300,000tocoverthecostoftheremovaloftheexisting
gymnasiumelevatorandtheinstallationofanewelevator.
5. Includealumpsumamountof$225,000tocoverthecostofreplacingexistinggasketing
and/orinsulatedglasspanesinskylightswheredamagedorbroken.Contractorto
coordinatewithArchitecttodetermineexistingskylightconditionsandscopeofgasketing
andinsulatedglasspanereplacement.
B. QuantityAllowances
1. IncludeintheBaseBidanamounttoremoveanddisposeofonsite200cubicyardsof
unsuitablesoiloruncompactedearth.
012100- Allowances
3

With GovernmentContracts, you can:
Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract
DEPT OF DEFENSE
Bid Due: 11/18/2026
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006
State Government of Georgia
Bid Due: 11/23/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047
State Government of Georgia
Bid Due: 11/19/2026