New Fire Station #22

Location: Georgia
Posted: Nov 3, 2026
Due: Nov 13, 2026
Agency: City of Madison
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 2027-3500-01
Publication URL: To access bid details, please log in.
Main

Agency
City of Madison, Georgia
Status
Active
Fiscal Year
2027
Primary Contact
Laurinda Mason
Title
New Fire Station #22
Secondary Contact
Laurinda Mason
Number
2027-3500-01
Tertiary Contact
Laurinda Mason
Type
Request for Proposal
Department
Fire
Online Submissions
Yes
Project Estimate
Piggyback Solicitation
No
Insurance Required
No
Bid Bond Required
No
Bid Bond Amount

Performance Bond Required
No
Performance Bond Amount

Construction Bond Required
No
Construction Bond Amount

Scope of Services
The City of Madison is seeking qualified general contracting firms to provide complete construction management and general contracting services for the construction of New Fire Station #22. The selected contractor will be responsible for all construction methods, job-site safety programs, scheduling (CPM), quality control, subcontractor prequalification, cost accounting, permitting coordination, as-built documentation, and full closeout/commissioning. The scope also includes a mandatory one-year warranty period with punch-list administration and a year-end warranty inspection.
Dates(All times are listed as EST )

Broadcast Date
10/8/2026 8:00 AM EST
Question End Date
10/29/2026 5:00 PM EST
Sample Due Date
Due Date
11/13/2026 5:00 PM EST
Bid Opening Date

Question End Date Reminder Notification
2 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
Due Date Reminder Notification
2 Day(s)
Pre-Bid Meetings

Total: 1 (All times are listed as EST )
Date Time Mandatory Location
10/22/2026 1:00 PM Yes 1100 Mary Magnan Blvd, Madison, GA 30650
Shortlist Meeting

Total: 0 (All times are listed as EST )
Date Time Location
Documents

Total: 7
Type Name Description File Type
Addendum 2502527 Madison GA Fire Station CD 261031 1.pdf CD Bid Documents Attachment A PDF
Addendum 2502527 Madison GA Fire Station Project Manual 4.pdf Attachment B PDF
Request for Proposal New Fire Station 22 RFP 2027350001.pdf RFP 2027-3500-01 PDF
Addendum C7.0 COM FIRE STATION LANDSCAPE PLAN.pdf Landscaping plan PDF
Addendum C7.1 COM FIRE STATION LANDSCAPE DETAILS.pdf Landscaping plan PDF
Addendum 2502527 Madison GA Fire Station CD 261014 1.pdf Addendum Item #3 - Revised Bid Documents PDF
Pre-Bid Sign-In Sheet doc00410620261022142929.pdf Mandatory Pre-bid Sign-In Sheet PDF
Quote/Bid


Zones
Total: 0
Zone

Groups
Total: 0
Group
Quote/Bid Items

Total: 0
# Required Group Make Model Description Quantity Unit of Measure Price/ Percent Type

Additional Quote/Bid Items Fields
Display Options Spreadsheet Section
No Display Image and Specifications Hyperlink Fields
No
Display Build Sheet File Upload Field
No Display Options File Upload Field
No
Require Build Sheet File to be Uploaded
No Require Options File to be Uploaded
No
Display Lead Time Field
No Display Standard Packaging Field
No
Delivery Date
None
Required Files to be Uploaded by the Vendor
W-9 Form
Proposal
Oath of Non-Collusion Affidavit (Exhibit)
Fee Proposal/Cost Schedule (Exhibit)
E-Verify Affidavit (Exhibit)

Shipping
None
Terms and Conditions
None
Include Shipping in Price of Items
No
Display Bid Tabulation to Vendors
No
Display Vendor Submissions to Vendors
No
View Vendor Submissions while Bid Solicitation is Active
No
Allow Options File to be Updated after Due Date
No
Allow Post Due Date Submission
No
Questions & Answers

Total: 41
Question Date Asked Answer Date Answered
It appears Civil sheet C-7.0 (The Landscaping Plan) is blank. Can you please provide the landscaping plan?

10/12/2026 8:59:11 AM Please see the new attachments for updated landscaping plan. Thank you for your question. 10/12/2026 11:19:05 AM
Civil Drawings: Several civil drawings are marked “PRELIMINARY,” and Sheet T1.1 identifies them as informational while requiring their scope in the base bid. Please confirm which civil drawings are approved for bidding. 10/12/2026 12:09:22 PM
The landscape plan identifies a required site density factor of 114.775 but provides only 52. It also indicates 15.77 required parking trees but provides 15. Please confirm whether the proposed landscaping meets the applicable requirements or revised drawings will be issued. 10/12/2026 12:09:42 PM
Section 004323 provides five deductive alternate entries, while Section 012300 describes only four. Please confirm whether a fifth alternate is required and, if so, provide its scope. 10/12/2026 12:10:12 PM
Gear Extractor Allowance: Section 012100 requires a $40,000 allowance for the gear washer extractor, while Deductive Alternate 4 deletes the equipment. Please clarify whether the deduction should include the full allowance and associated installation costs. 10/12/2026 12:10:17 PM
Unsuitable Soils: Section 012200 requires unit pricing for structural fill and removal of unsuitable soils. Please identify the quantities, if any, that must be included in the base bid. 10/12/2026 12:10:28 PM
Geotechnical Report: Please provide the geotechnical investigation report used to establish the foundation, slab, pavement, structural fill, and unsuitable-soil design requirements. 10/12/2026 12:10:38 PM
Stormwater Permitting: Please identify the governing SWPPP and clarify whether the Owner or Contractor is responsible for NOI/NOT filings, permit fees, and regulatory reporting. 10/12/2026 12:10:51 PM
Utility Connections: Please clarify the limits of responsibility for water, sewer, electrical, natural gas, and communications service connections, including meters, tap fees, impact fees, deposits, and utility-company charges. 10/12/2026 12:11:10 PM
Owner-Furnished Equipment: Please clarify the Contractor`s responsibility for rough-ins, electrical connections, plumbing, communications, equipment supports, controls, and commissioning associated with Owner-furnished equipment. 10/12/2026 12:11:15 PM
Security Systems: Section 011000 identifies the security system as Owner-furnished and installed, while Division 28 includes access control and video surveillance. Please clarify which portions of these systems must be included in the Contractor`s base bid. 10/12/2026 12:11:35 PM
The specifications include both TPO roofing and metal roof panels. Please identify the areas requiring each system and provide the applicable transition and interface details. 10/12/2026 12:12:14 PM
Special Inspections: Please confirm whether the Owner will pay for required special inspections and laboratory testing and identify any inspection or testing costs that must be included in the Contractor`s base bid. 10/12/2026 12:12:26 PM
Clean-Agent Fire Suppression: Please identify which rooms require clean-agent fire suppression and provide the applicable system design criteria and equipment requirements. 10/12/2026 12:12:42 PM
Generator and Transfer Switch: Please confirm the required generator capacity, fuel source, fuel storage requirements, equipment location, and testing and commissioning requirements. 10/12/2026 12:12:54 PM
What appears to be C5.0 and C5.02, the drawings appear to be missing some information to site utilities. C5.02 is completely blank, and C5.0 does not have any site utilities drawings on the page nor has a page number in the title box.

Please provide site utilities drawings.
10/12/2026 3:31:57 PM
- RFP section 2.4 indicates the successful proposer shall give a contract Proposal bond, Performance Bond and a Payment Bond. This implies the 5% proposal bond would be submitted after a successful proposer was established.

Can we conclude the Proposal bond is to be submitted along with the proposal?

- RFP Section 2.6.1 indicates All proposed Sub-Consultants and Subcontractors must be listed in the Proposer`s response. The Proposed list of subcontractors form only includes line items for four (4) Subcontractors. Is it the intent to list only for specific trades? If yes, which ones?
If no, will a revised list of subcontractors form be provide?

- RFP Required Form No. 14. Notarized Contractor Affidavit is listed as a required form but the actual form was not provided.
Please provide.
10/19/2026 1:56:48 PM
- RFP section 2.4 indicates the successful proposer shall give a contract Proposal bond, Performance Bond and a Payment Bond. This implies the 5% proposal bond would be submitted after a successful proposer was established.
Can we conclude the Proposal bond is to be submitted along with the proposal?
10/19/2026 1:57:24 PM
- RFP Section 2.6.1 indicates All proposed Sub-Consultants and Subcontractors must be listed in the Proposer`s response. The Proposed list of subcontractors form only includes line items for four (4) Subcontractors. Is it the intent to list only for specific trades? If yes, which ones?
If no, will a revised list of subcontractors form be provide?
10/19/2026 1:57:31 PM
- RFP Required Form No. 14. Notarized Contractor Affidavit is listed as a required form but the actual form was not provided.
Please provide.
10/19/2026 1:57:39 PM
PEMB Loading & Deflections:
a) What is the collateral gravity load?
b) Is roof live load reduction for the main framing allowed?
c) S0.1 Metal Building Note 11 states" All designed components backup up to masonry to L/600."
- The PEMB building will have gauge girts from the PEMB. They will be laterally supporting the walls & plywood. L/600 is beyond the scope of gauge girts. Am i assuming the L/600 is for the vertical support of masonry(I.E. a lintel beam)?
- For the PEMB girts, we can hold L/240 of L/360. These are standard PEMB values. Please advise.
10/23/2026 10:09:32 AM
PEMB Panels:
I cannot seem to locater specifications for the following panels, please supply what profile, guage and finish is required for :
a) Roof panel
b) Soffit panel
c) interior liner panel
10/23/2026 10:11:02 AM
PEMB Trim:
I cannot locate a specification for the PEMB trim (eave trim, rake trim, gutter & downspouts) to know if they are to be aluminum or galvalume, or the thickness required. Please advise.
10/23/2026 10:12:23 AM
On sheet E003, the Luminaire Schedule lists(23) W1 wall pack fixtures. However, these fixtures do not appear on the lighting circuit drawings on sheets E002 or E210. Instead, the fixtures shown in those same locations are WL (3” downlights), and the quantities do not match the W1 fixture count. As highlighted in red on the attached file, there are five fewer WL fixtures than the (23) W1 fixtures listed in the schedule.
Would you like us to include the W1 wall packs as an add alternate, or should we exclude them from our pricing?
10/23/2026 11:42:24 AM
Sheet A8.1 references “SIGNAGE – ROOM ENTRY” with Note 1 stating “ROOM NUMBER (SEE SCHEDULE)”. We were unable to locate the referenced room/sign schedule in the drawing set or specifications.

Please provide the room/sign schedule, or advise where it can be found, so we can accurately quantify the required signage for bidding purposes.
10/28/2026 4:06:46 PM
Section 085113 requires windows to comply with ASTM E1886/E1996 impact and cyclic pressure testing (Wind Zone 1, large missile impact within 30`-0" of grade). However, the glazing specified in Sections 085113 and 088000 is non-laminated, and the basis-of-design product, Kawneer 8225TL, does not appear to be impact-rated.

Additionally, Section 088000 indicates a design wind speed of 110 MPH, Exposure B, which does not appear to require windborne debris protection.

Please clarify whether impact-resistant glazing/windows are required for this project. If so, please provide the approved impact-rated window and glazing specification.
10/28/2026 4:09:17 PM
Section 084313 includes aluminum-framed storefront systems with vision glass only; however, no aluminum entrance door section was identified in the Project Manual.

Section 087100 references aluminum-framed entrances/storefronts and includes hardware requirements, but no door hardware set specifically identifies an aluminum door. Door 100 (Hardware Set 028: offset pull, RX-QEL rim exit device, and 4040XP closer) appears to be an aluminum storefront entrance door.

Please confirm if Door 100 is intended to be an aluminum storefront entrance door and identify the applicable entrance door specification and requirements.
10/28/2026 4:10:21 PM
With Mitsubishi / Trane equipment as the basis of design, appreciate if we can have Trane controls BAS as one of the approved vendors under spec 230900 - Environmental Control System.
Our integration capabilities with the equipment far exceed the spec requirement for control and monitor. Furthermore, it will provide a single point responsibility during project execution and service to the owner after handing over.
10/29/2026 10:33:50 AM
Spec 051200-1.4-A and B indicate AISC Certifications are required for the Steel fabricator and installer. Can the AISC Certification be waived? 10/29/2026 3:36:37 PM
"Section 085113 requires windows to pass ASTM E1886 / E1996 missile-impact and cyclic-pressure testing (Wind Zone
1, large missile within 30` of grade). The glass specified in 085113 and the 088000 IG schedule is non-laminated, and
the basis-of-design Kawneer 8225TL is not an impact-rated product. Per 088000 the design wind speed is 110 mph,
Exposure B, which is not a windborne-debris region.

Can we conclude spec 085113 2.02.E is to be deleted? If impact resistance is required, confirm which openings, the missile level, and the laminated IG
make-up, and confirm acceptable impact-rated products."
10/29/2026 3:37:48 PM
"Section 084313 includes aluminum-framed storefront with vision glass only; no aluminum entrance section is included
in the Project Manual. Section 087100 references ""Aluminum-Framed Entrances and Storefronts"" and ""Entrances,"" but
no hardware set identifies an aluminum door. Door 100 (Set 028: offset pull, RX-QEL rim exit device, 4040XP closer)
appears to be a storefront entrance

Confirm whether any doors are aluminum. If so, identify door numbers, stile type (narrow / medium / wide), glazing, and
confirm all hardware is furnished under 087100 for installation by the entrance installer."
10/29/2026 3:38:40 PM
Section 1-A-6.3 shows a wood sill, casing, and trim. Is the wood sill, casing, and trim throughout the building to be a paint grade wood? If stain grade, is pine an acceptable wood species? Please indicate paint or stain requirements. 10/29/2026 3:39:42 PM
Specification Section 28 13 00 references an Enrollment Center and a Badging Station. However, the specifications do not clearly define the required equipment, workstation configuration, or responsibility for furnishing the associated computer hardware.

Please confirm the Owner’s requirements for the following:
1. Enrollment Station
Is an Enrollment Station with a biometric reader required? (Yes / No)
If required, who is responsible for furnishing the associated computer workstation?
Please clarify whether the workstation is to be furnished by the Owner or the Access Control Contractor.
2. Badge/Card-Making Station
Is a dedicated Badge/Card-Making Station required? (Yes / No)
If required, who is responsible for furnishing the associated computer workstation?
Can the Badge/Card-Making Station utilize the same computer workstation as the Enrollment Station, or is a separate dedicated workstation required?"
10/29/2026 3:45:59 PM
Please confirm whether Avigilon can be added as an approved manufacturer for the project’s CCTV and Access Control systems. 10/29/2026 3:47:16 PM
Specification Section 28 13 00, Subsection 2.18, identifies two manufacturers for the Access Control System. However, both manufacturers have reportedly been dissolved or acquired, and their specified products may no longer be available.

Please clarify the Owner’s requirements for the Access Control System and provide direction regarding acceptable manufacturers and equipment.
10/29/2026 3:50:20 PM
The approved architectural wood doors for Madison Fire Station include Masonite Doors. Masonite Architectural was rebranded as Forte Opening Solutions in 2024. Is Forte Openings Solutions an acceptable wood door manufacturer for this project? 10/29/2026 3:56:56 PM
How much time should we allow for building permit review and approval? 10/29/2026 4:00:01 PM
Are permits and fees to be waived by the county or is the GC responsible? 10/29/2026 4:00:09 PM
Sheet E600 indicates a list of Kitchen Equipment, cooking range, ice machine, Refrigerator, and undercounter refrigerators with no model numbers, etc. Spec Section 11 40 00 - 3.07 - A indicates Atosa Model YR450-AP-161 Ice Make with CYR400P ice bin. Please provide model numbers, etc. for the Kitchen Equipment and Residential appliances. 10/29/2026 4:19:01 PM
Upon review of the civil drawings, Sheets C5.0 and C5.2 appear to be either blank or contain unlabeled information. The intended content and scope of these sheets are unclear. Please clarify whether these sheets are intentionally blank or if additional information, revisions, or updated drawings will be provided. 10/29/2026 4:37:10 PM
Upon review of the civil drawings, Sheets C5.0 and C5.2 appear to be either blank or contain unlabeled information. The intended content and scope of these sheets are unclear. Please clarify whether these sheets are intentionally blank or if additional information, revisions, or updated drawings will be provided. 10/29/2026 4:43:38 PM
Commodity Codes

Total: 3
Code Description
[909-24] Building Construction, Commercial and Institutional
[958-26] Construction Management Services
[909-22] Building Construction, Non-Residential (Office Bldg., etc.)
Publications

Total: 0
Publication Date
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract

DEPT OF DEFENSE

Bid Due: 11/18/2026

Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 11/25/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006

State Government of Georgia

Bid Due: 11/23/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047

State Government of Georgia

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.