Furnishing Knife Gate Valves and Sleeve Valves for the Hollywood Tunnel
Spec 2099
Bids Open: 1/16/2025
Approximate Construction Value: $310,000 to $350,000 for Schedule 1 (Knife Gate Valves) and $1,410,000 to $1,750,000 for Schedule 2 (Sleeve Valves)

With GovernmentContracts, you can:
...of pipes, concrete walls, valves, slide/sluice gates, electrical systems, metal and concrete tanks...
City of Pacifica
Bid Due: 6/30/2026
...of diffusers to mix the flow in the mixed liquor channels, gates and ...
San Francisco Public Utilities Commission
Bid Due: 7/23/2026
...to, the installation and/or repair of pipes, concrete walls, valves, slide/sluice gates, electrical...
City of Pacifica
Bid Due: 6/19/2026
...of diffusers to mix the flow in the mixed liquor channels, gates and ...
San Francisco Public Utilities Commission
Bid Due: 7/23/2026