Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)

Location: California
Posted: Jul 16, 2025
Due: Jul 25, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: W912PL25BA007
Publication URL: To access bid details, please log in.
Follow
Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Active
Contract Opportunity
Notice ID
W912PL25BA007
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION SOUTH PACIFIC
Office
W075 ENDIST LOS ANGELES
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jul 16, 2025 02:47 pm PDT
  • Original Published Date: Jun 18, 2025 01:36 pm PDT
  • Updated Date Offers Due: Jul 25, 2025 01:00 pm PDT
  • Original Date Offers Due: Jul 18, 2025 01:00 pm PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 16, 2026
  • Original Inactive Date: Jul 18, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J041 - MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
  • NAICS Code:
    • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • Place of Performance:
    5901 E. 7th St. Long Beach, CA 90822
Description View Changes
PIEE Update 0003 is issued to transmit the SF30 (2 pages) for Amendment 0002 of the IFB W912PL25BA007 to extend the bid opening date. PIEE Update 0002 is issued to transmit the Pre-Bid Site Visit sign-in sheet (1 page) for the IFB W912PL25BA007. PIEE Amendment 0001 is issued to transmit the SF-30 (7 pages) of the IFB W912PL25BA007, this amendment does not extend the proposal date. This is to provide site visit information and update conditions of U. S. Army Corps of Engineers Safety and Health Requirements. Provide all material and labor required to upgrade central chiller plant and DDC controls in Building 5A of the Long Beach VA campus, to comply with the latest codes and VA standards. All construction shall be performed in accordance with drawings and specifications provided by the VA. This project intends to replace the existing chillers, upgrade/refurbish existing cooling towers, upgrade/replace the primary and secondary chilled water pumps, condenser water pumps, related piping and controls, pressure differential Delta P valves in main chilled water lines entering each of the buildings and interface with existing Johnson Controls Metasys System. SOW includes but is not limited to:1. Civil-Site demolition includes removing existing concrete mow curb, cobbles and concrete pavement, gravel ground cover, irrigation, and sod.-New concrete sidewalk-One existing manhole will need to be raised to the new finished grade. A new pre-cast concrete manhole ring will be provided and installed by the contractor2. Structural-One of the new chillers shall be supported on the existing concrete pad, and for the other a new concrete foundation shall be provided. The chillers are connected to the concrete pad expansion anchors. The new air separator tank and expansion tank are supported and anchored to a new concrete pad. Equipment pumps are supported and anchored to concrete pads.-Electrical equipment shall be supported and anchored on new concrete pads mounted on the existing slab on grade-New piping is hung from the existing roof structure and supported on steel pipe supports as required3. Cooling Towers and Condenser Water Piping-Each of the existing four cell cooling towers (1100 ton per cell) shall be refurbished, including thermal upgrade to improve their performance-Install one new, factory built, packaged cooling tower with water filtration system and sweeper piping, condenser water pump, new piping and piping accessories-For existing 4-cell cooling towers, install four condenser water pumps-each 3.75 GPM at 125 feet head, 150 HP-For new cooling tower, install one condenser water pump- 3,750 GPM at 90 feet head, 125 HP-Remove two existing water filtration systems and replace with new four water filtration systems with sweeper piping to each cooling tower cell-All new piping and piping appurtenances to the new chillers, cooling towers and pumps shall include motorized valves, strainers, check valves, isolation valves, balancing valves, gauges and accessories4. Chillers and Chilled Water Piping System-Replace existing 1100-ton chiller with new 1250-ton chiller-Provide one, new 1250-ton chiller-For two new chillers, install two, primary chilled water pumps-each 3000 GPM at 50 feet head, 50 HP, One, secondary chilled water pump-3000 GPM at 180 feet head, 200 HP. Provide primary and secondary chilled water pumps with variable frequency drive (VFD) for the two new chillers-Provide pressure differential (Delta P) valves on the chiller water mains entering each building served by the Central Plant5. Chiller Room Refrigeration Leak Detection Monitoring System-Remove existing refrigerant leak detection and monitoring system and replace with code compliant system with alarms and emergency Chiller Room Ventilation System6. Chiller Room HVAC System-Replace existing exhaust fan with new Chiller Room Ventilation Fan of 7500/11.500 cubic feet per min (CFM) with VFD to meet the air flow of normal/emergency ventilation7. Plumbing-Install cold-water isolation valve for each cooling tower supply8. Electrical and Low Voltage-Provide electrical power and low voltage system to all mechanical and plumbing equipment-New conduit and wiring shall be routed from the new cooling towers to the motor control center ?MCC? located inside the substation. The control requirements shall be powered from the existing 120/208V panel located inside the substation building9. Phasing-The project will be phased to minimize disruption to patient care.-Intent will be to work on two cells at a time to minimize downtime-Complete shut-down of the Chiller Plant shall be required to install the new 30? main condenser supply and return header10. Provide Commissioning
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
  • LOS ANGELES , CA 90017-3409
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

May 8, 2025[Sources Sought (Original)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Jun 18, 2025[Solicitation (Original)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Jun 25, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Jul 2, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Jul 17, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Jul 24, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Jul 30, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Aug 6, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Aug 8, 2025[Solicitation (Updated)] Upgrade Central Chiller Plant and DDC Controls (Long Beach VA Campus)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

GFO-25-306 - Solar PV Located in Non-traditional Terrain (SPLINT) Solicitation Type Grant Funding

California Energy Commission

Bid Due: 6/16/2026

Project ID: Title: South Kelly - Highway 29 Intersection Project Addenda: 0 Release

City of American Canyon

Bid Due: 7/09/2026

GENERAL COUNSEL RFP NO. 25.26.1304 DESCRIPTION: SBCSS and the San Bernardino County Board

San Bernardino County Superintendent of Schools

Bid Due: 6/18/2026

Project ID: 2026-Informal-0316 Title: RV and Heavy-Duty Vehicle Specialized Outfitting Maintenance, Repair, and

City of Pasadena

Bid Due: 6/05/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.