| Location: | Tennessee |
|---|---|
| Posted: | Apr 8, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9123625S4001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Supplemental Sources Sought Notice
Construction of New River Water Intake Facility and Pump House at Holston Army Ammunition Plant (HSAAP), Kingsport, TN.
The Army Corps of Engineers—Norfolk District is conducting Supplemental Market Research to identify potential sources for construction of the facility identified.
Holston Army Ammunition Plant (HSAAP) is a Government-Owned, Contractor-Operated (GOCO) explosives production facility located in Kingsport, TN. All production at HSAAP depends on river water.
HSAAP draws river water from the Holston River for process use in the plant. River water provides two primary functions: (1) Feedstock to the Filtered Water Plant, and (2) Non-contact Cooling Water (NCCW) for various process applications. River water is currently extracted through the existing pump house and intake on the east side of the plant.
The new river water intake facility and pump house will comply with the Clean Water Act (CWA) Rule 316(b) which provides protection to aquatic wildlife by reducing fish impingement mortality rates. 40 Code of Federal Regulations (CFR) § 125.94 identifies requirements for existing/new facilities to ensure compliance with Rule 316(b) such as (a) limiting the allowed velocity of the water flow through intake screens to 0.5 feet per second (fps), or (b) using a modified traveling screen that safely transports impinged organisms back to the source waterbody. Estimated intake capacity for river water is 80-96 million gallons per day (MGPD).
Please review the attached document for further details.
| Nov 5, 2024 | [Special Notice (Original)] Notice of Intent to Sole Source: New River Intake Facility at Holston Army Ammunition Plant |

With GovernmentContracts, you can:
Bid Title: FY2027-119 - Oak Ridge Recreation Center - Lobby Renovation Category: Bids
City of Oak Ridge
Bid Due: 10/15/2026
Bid Title: Bid on Traffic Signal Heads Category: BIDs Status: Open Description: The
City of Pigeon Forge
Bid Due: 10/06/2026
Form Details (Abstract): RFQ 1804993 Status Active Document PDF File Abstract Negotiation Number
Memphis Light
Bid Due: 9/23/2026
Event 32101-13979 Amendment 1 Terms and Conditions Specifications Attachment A Discount workbook 08/14/2026
State Government of Tennessee
Bid Due: 9/24/2026