LU214-25-002 Eason Chiller Replacement

Location: Virginia
Posted: Nov 8, 2024
Due: Dec 12, 2024
Agency: State Government of Virginia
Type of Government: State & Local
Category:
  • 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: IFB 81353-1
Publication URL: To access bid details, please log in.
Views: Current Version ( 30 ) All Versions ( 35 )
Details


IFB-81353


  • LU214-25-002 Eason Chiller Replacement
    i
  • Round:1
  • Status: Open
  • Time Left:33 days
  • Closing:12/12/24 2:00 PM
  • Issued:11/8/24 11:06 AM
  • Last Updated:11/8/24
  • Buyer:Maty Fedor

  • fedormk@longwood.edu
  • 434-395-2094



IFB-81353


  • LU214-25-002 Eason Chiller Replacement
    i
  • Round:1
  • Status: Open
  • Time Left:33 days
  • Closing:12/12/24 2:00 PM
  • Issued:11/8/24 11:06 AM
  • Last Updated:11/8/24
  • Buyer:Maty Fedor

  • fedormk@longwood.edu
  • 434-395-2094

  • Issued By:Longwood University
  • Opportunity Type:Invitation for Bids (IFB)
  • Category:Construction
  • Work Location:Longwood University
  • Website:
  • Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit.
  • Open Responses:See solicitation documents Public Opening information.
  • Summary:The project is generally described as the Removal and replacement of the existing water-cooled chiller; Removal and replacement of the primary and secondary pumps and installation of new backup pumps; Replacement of chilled water piping near the chiller; Replacement of the existing refrigerant monitor to detect the new refrigerant type. Provide power for the new chiller, pumps and any other necessary equipment.
  • Round Information:Add document.

Documents
Document Size Description Posted On Type
LU214-25-002 Eason Chiller Replacement Combined.pdf (2.34 MB) LU214-25-002 Eason Hall Chiller IFB 11/8/24 RFx Document
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
  • Grid 1 - Response
    • I1_1. The project is generally described as the Removal and replacement of the existing water-cooled chiller; Removal and replacement of the primary and secondary pumps and installation of new backup pumps; Replacement of chilled water piping near the chiller; Replacement of the existing refrigerant monitor to detect the new refrigerant type. Provide power for the new chiller, pumps and any other necessary equipment.
    • NIGP Code:
    • Quantity: 1.00000
    • Delivery Date:

    B2B Follow ×
    Enter Email Address:
    CloseSubmit
    B2B Unfollow ×
    Enter Email Address:
    CloseSubmit
    Add B2B Posting ×
    Contact Name:
    Company Name:
    Email Address:
    Phone Number:
    SWaM Certifications:

    Micro Business

    Small Business

    Minority Owned Business

    Women Owned Business

    Service Disabled Veteran Owned

    Employment Service Org
    Message:
    CloseSubmit
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...onsite energy systems, and existing backup power strategies are often insufficient to support ...

    DEPT OF DEFENSE

    Bid Due: 7/03/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.