| Location: | Colorado |
|---|---|
| Posted: | Apr 7, 2025 |
| Due: | Apr 28, 2025 |
| Agency: | Town of Parker |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Longs Way Storm Pipe Lining CIP25-003
Storm culvert improvements underneath Longs Way. Included with the improvements, but not limited to, will be approximately 220 linear feet of 26” SnapTite pipe installed within two 30” CMP (each approximately 110’ in length), approximately 20 cubic yards of excavation, 20 cubic yards of rip-rap, two new flared end sections and erosion control to complete the project. |

With GovernmentContracts, you can: