A separate bid is required for each individual location, but a Company is not required to bid each location in order to be considered. Bids will be received until September 17, 2025 at 2p.m. at the McDuffie County Finance Department located at 210 Railroad Street (2
nd
floor). Any bid received after this date and time willnotbe accepted.
All interested parties should obtain bid specifications by visiting www.thomsonmcduffie.gov or by contacting Lori Ducey at 706-597-2383.
Award will be made to the Company submitting the lowest responsive and responsible bid. McDuffie County reserves the right to reject any or all bids, to waive technicalities, and to make an award deemed in its best interest.
Government Center
Information Technology Corridor
Provide floor protection with heavy paper and tape
Removal of Cove base molding that is 4" high (76.5 LF)
Replace Cove base molding to 611 high (76.5 LF)
Remove and replace 5/8" drywall - hung, taped, floated, and ready to paint (351.67 SF)
Remove and replace suspended ceiling tile 2 x 4 (207 SF)
Remove and replace bat insulation - 6 11 / R21- unfaced bat (231 SF)
Remove and replace diffusing panel (24 SF)
Tape Joint for new to existing drywall (20 LF)
Seal/prime (1 coat), then paint the surface area {351.67 SF)
Paint the walls (1 coat) (807.67 SF)
Clean and deodorize carpet (231 SF)
Information Technology Office
Provide floor protection with heavy paper and tape (236.25 SF)
Removal of Cove base molding that is 411 high (48.92 LF)
Replace Cove base molding to 6 11 high (48.92 LF)
Remove and replace 1/2" drywall - hung, taped, floated, and ready to paint (118.33 SF)
Remove and replace suspended ceiling tile 2 x 4 (220.25 SF)
Remove and replace bat insulation - 611 / R21- unfaced bat (236.25 SF)
Remove and replace diffusing panel (16 SF)
Tape Joint for new to existing drywall {20 LF)
Seal/prime (1 coat), then paint the surface area {118.33 SF)
Paint the walls (1 coat) {508.78 SF)
Clean and deodorize carpet (236.25 SF)
Courthouse
Remove and replace suspended ceiling tile 2 x 4 (224 SF)
Remove and replace bat insulation - 611 / R21 - unfaced bat (250 SF)
Remove and replace diffusing panel (24 SF)