| Location: | California |
|---|---|
| Posted: | Apr 24, 2025 |
| Due: | May 13, 2025 |
| Agency: | City of Benicia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 23-04 |
| Publication URL: | To access bid details, please log in. |
Project ID: 23-04
Title: Military West Pedestrian Bridge Replacement and Barrier Removal Project
Addenda: 1
Release Date: 4/3/2025
Due Date: 5/13/2025
The Project proposes to construct a new single span prefabricated steel bridge over Military West at the Mary Farmar Elementary School, reinforced concrete bridge
abutments, cast in drilled hole (CIDH) pier foundations, reinforced concrete deck, segmental retaining wall systems, hot mix asphalt and concrete pathways, fencing, grading and site preparation. The City has ordered the bridge, which is being fabricated. The Contractor will assume the purchase of the bridge through the contract documents.

With GovernmentContracts, you can:
...331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel Manufacturing 331318: ...
City of Los Angeles
Bid Due: 6/30/2031
...Manufacturing Manufacturing 332618: Other Fabricated Wire Product Manufacturing Manufacturing 339950: Sign... 238120: Structural ...
City of Los Angeles
Bid Due: 10/14/2026
...(OSFM). The pipeline consists of approximately 40-foot section of 4-inch steel pipe and ...
City of Los Angeles
Bid Due: 10/28/2026
...57000 METALS: BARS, PLATES, RODS, SHEETS, STRIPS, STRUCTURAL SHAPES, TUBING, AND FABRICATED ITEMS ...
San Diego County Water Authority
Bid Due: 10/01/2026