Installation and Removal of Motor Control
Center for Storm Water Pump Station
Pre-Submittal Meeting
January 8, 2026/ 2:00 PM CST
1
Overview
• Airport Staff Introductions
• Introduction
• Scope of Work
• RFP Timeline
• Submittal Requirements
• Project Proposal Format
• Project Proposal Selection Criteria
• Questions
2
Introduction
• The Birmingham Airport Authority is requesting proposals for qualified contractors to remove
the Motor Control Center (MCC) for the Storm Water Pump Station and supply and install a
new Motor Control Center at the Birmingham Shuttleworth International Airport.
• The goal of this procurement effort is to enter into a contract with the best-valued Contractor
to remove the Motor Control Center (MCC), supply and install an MCC.
3
Scope of Work –Summary of Project
• The BAA is looking for safe removal, disposal, and replacement of the facility’s existing MCC.
The project includes disconnecting, removing, and disposing of the current MCC; supplying,
installing, and commissioning a new MCC; providing all associated electrical, mechanical,
programming, and testing services.
• Currently we have
• Cutler-Hammer 2100 MCC which is 1600-amps, 480-volts, 3-phase, 4-wire
• Four banks with each breaker feeding the pumps 800-amp
• Control system is a Watch Dog system
4
Scope of Work- Pre-Construction
• Conduct site visits to verify dimensions, clearances, connections, and field conditions
• Prepare project schedule, safety plan, and submittals for approval.
• Provide detailed drawings showing MCC layout, conduit routing, and wiring diagrams
• Coordinate shutdown windows with the Owner
5