| Location: | Oklahoma |
|---|---|
| Posted: | Nov 19, 2025 |
| Due: | Nov 21, 2025 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF25B000021 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT NUMBER: OK FW SQH T501(1)
PROJECT NAME: REHAB RIVERBANK & SANDTOWN WOODS TR
PROJECT DESCRIPTION: The Rehab Riverbank and Sandtown Woods Trail project is located in the Sequoyah National Wildlife Refuge in eastern Oklahoma approximately 90 miles southeast of Tulsa, Oklahoma. The Refuge sits at the confluence of the Arkansas and Canadian Rivers. The Refuge was established as an overlay of the U.S. Army Corps of Engineers (USACE) lands along Robert S. Kerr Reservoir created by the Robert S. Kerr Dam.
The project consists of improving visitor access and experience by repairing damaged areas of the bank, protect existing trail infrastructure, and to repair sections of trail damaged after the 2019 flooding event. This includes stabilization and repair of approximately 1,150 linear feet of riverbank and repair/reconstruction of approximately 500 linear feet of 6-foot-wide asphalt trail.
PRINCIPAL WORK ITEMS:
The project work will be performed in a grassed upland area that contains some wooded vegetation offset from the riverbank.
ANTICIPATED SCHEDULE:
Advertisement – September 2025
Award – November 2025
Contract Completion – March 2026
ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
| Sep 11, 2025 | [Presolicitation (Original)] OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail |
| Oct 20, 2025 | [Solicitation (Original)] OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail |
| Oct 23, 2025 | [Solicitation (Updated)] OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail |
| Nov 12, 2025 | [Solicitation (Updated)] OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail |
| Nov 18, 2025 | [Solicitation (Updated)] OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail |
| Nov 21, 2025 | [Solicitation (Updated)] OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail |

With GovernmentContracts, you can:
...Central time, at GRDA - Energy Control Center/Kerr Dam 4221 E.545 Road, Locust ...
Grand River Dam Authority
Bid Due: 6/17/2026
...Dam, Drain Pipe & Construct Trash Guard, Repair & Reshaped Spillway, add Rip ...
State of Oklahoma - Commissioners of the Land Office
Bid Due: 6/24/2026
...the Bid Express website, www.bidexpress.com . Search for GRDA or Grand River Dam ...
Grand River Dam Authority
Bid Due: 6/17/2026
...through the Bid Express website, www.bidexpress.com . Search for GRDA or Grand River ...
Grand River Dam Authority
Bid Due: 7/14/2026