| Location: | Oklahoma |
|---|---|
| Posted: | Feb 26, 2026 |
| Due: | Mar 13, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA813726R0010 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma (project drawings can be provided to interested vendors for additional location and schematic information). Contact the primary or secondary point of contact to request project drawings. This is a construction-only contract.
The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.
Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.
This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (TinkerAFBI) 21-100.
IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems.

With GovernmentContracts, you can:
Follow REPAIR TAXIWAY A, Phase 1 and Phase 2 (Option) both Unfunded Active
DEPT OF DEFENSE
Bid Due: 6/23/2026
Bid Number: Gen 26-5 Bid Title: Marland Grand Home-Re-Roofing Project Category: Marland Grand
City of Ponca City
Bid Due: 6/04/2026
Bid Title: 2024 CIRP Phase II - Pavement Rehabilitation Project Category: Public Works
Bixby city
Bid Due: 6/02/2026
Follow TINKER AFB MAC BOA WWYK250013 - Renovate to Open Storage B1115 Active
DEPT OF DEFENSE
Bid Due: 6/17/2026