| Project Title: | Substation 10 Transformer Upgrade Re-Bid |
| Description: | General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment System for the transformer which has been designed to contain accidental spills and/or tank rupture within the area surrounding the power transformer. The installation of this system involves the excavation of a large basin around the transformer foundation. The basin will be permanently formed with reinforced concrete walls and floors. The containment basin is designed with concrete flush splash pads to allow all rainwater to drain out at a single outlet. The Contractor shall be responsible for furnishing the labor and materials to install the concrete basins, and shall be responsible for the labor to complete the installation of the pumps and all associated electrical/plumbing materials for a complete system. The Contractor shall furnish the mechanical sump package as outlined in the "List of Materials for the Oil Containment System" following these specifications. The Contractor shall furnish all concrete, reinforcing steel, galvanized steel bar grating, and framing materials for the concrete basin. |
| Opening Date: | 10/14/2026 2:00 PM |
| Posted Date: | 10/6/2026 |
| Status: | Open |
| Department: | CITY OF ROCKY MOUNT |
|
Solicitation Number
*
320-040226FD Re-Bid
|
Department
CITY OF ROCKY MOUNT
|
Status Reason
Open
|
|
|
Opening Date
2026-10-14T14:00:00.0000000
|
Posted Date
*
2026-10-05T20:51:57.0000000Z
|
Primary Commodity Code
Distribution and control centers and accessories
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
RFP
|
|
|
Owner
Alicia Gaines
|
|||
|
Description
General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment System for the transformer which has been designed to contain accidental spills and/or tank rupture within the area surrounding the power transformer. The installation of this system involves the excavation of a large basin around the transformer foundation. The basin will be permanently formed with reinforced concrete walls and floors. The containment basin is designed with concrete flush splash pads to allow all rainwater to drain out at a single outlet. The Contractor shall be responsible for furnishing the labor and materials to install the concrete basins, and shall be responsible for the labor to complete the installation of the pumps and all associated electrical/plumbing materials for a complete system. The Contractor shall furnish the mechanical sump package as outlined in the "List of Materials for the Oil Containment System" following these specifications. The Contractor shall furnish all concrete, reinforcing steel, galvanized steel bar grating, and framing materials for the concrete basin.
|
|||
| CLIENT:City of Rocky Mount PROJECT:Substation 10 Transformer Upgrade LABOR AND MATERIAL PROPOSAL PROJECT NO.:P.0752679.S.00 CONTRACTOR: DATE: | ||||||
|---|---|---|---|---|---|---|
| UNIT PRICING | LABOR AND | |||||
| GROUP | DESCRIPTION | QTY | UNIT | LABOR | CONTRACTOR- FURNISHED MATERIAL | MATERIAL EXTENDED COST |
| A | Structures | 1 | lot | |||
| B | Three-Pole Group Operated Air Break Switches | 2 | each | |||
| D | Single-Pole Disconnecting Switches | 4 | each | |||
| E | Power Circuit Breakers | 1 | each | |||
| G | Meters, Relays, and Instrument Transformers | 3 | each | |||
| H1 | Station Service Transformers | 1 | each | |||
| H2 | Power Transformers (including lifting and placement on pad) | 1 | each | |||
| K | Conduit and Cable | 1 | lot | |||
| L | Foundations | 1 | lot | |||
| M | Site Preparation (Yard Stone) | 1 | lot | |||
| O | Station Grounding | 1 | lot | |||
| Q | Oil-Containment System | 1 | lot | |||
| T | Testing | 1 | lot | |||
| W | Demolition | 1 | lot | |||
| TOTAL LABOR: | ||||||
| TOTAL OWNER-FURNISHED MATERIAL COST: | $1,486,075.00 | |||||
| TOTAL INSTALLATION: | $1,486,075.00 |
CLIENT:City of Rocky Mount
PROJECT:Substation 10 Transformer Upgrade
LABOR AND MATERIAL PROPOSAL PROJECT NO.:P.0752679.S.00
CONTRACTOR:
DATE:
UNIT PRICING
LABOR AND
GROUP DESCRIPTION QTY UNIT CONTRACTOR- MATERIAL
LABOR FURNISHED EXTENDED COST
MATERIAL
A Structures 1 lot
B Three-Pole Group Operated Air Break Switches 2 each
D Single-Pole Disconnecting Switches 4 each
E Power Circuit Breakers 1 each
G Meters, Relays, and Instrument Transformers 3 each
H1 Station Service Transformers 1 each
H2 Power Transformers (including lifting and placement on pad) 1 each
K Conduit and Cable 1 lot
L Foundations 1 lot
M Site Preparation (Yard Stone) 1 lot
O Station Grounding 1 lot
Q Oil-Containment System 1 lot
T Testing 1 lot
W Demolition 1 lot
TOTAL LABOR:
TOTAL OWNER-FURNISHED MATERIAL COST: $1,486,075.00
TOTAL INSTALLATION: $1,486,075.00
Proj no xxx P - 2
(C) Month Year C2 - Restricted
#
| CLIENT:City of Rocky Mount PROJECT:Substation 10 Transformer Upgrade UNIT PRICING PROPOSAL PROJECT NO.:P.0752679.S.00 CONTRACTOR: DATE: | |||
|---|---|---|---|
| MATERIAL COST | |||
| DESCRIPTION | LABOR | MATERIAL | TOTAL |
| COST PER INSTALLED CUBIC YARD OF CONCRETE PER GROUP L | |||
| Pad-Pier Type Foundation | |||
| Pad-Type Foundation | |||
| COST PER INSTALLED POUND OF REBAR | |||
| COST PER LINEAR FOOT OF GROUND WIRE DITCH | |||
| Machine Excavate | |||
| Hand Excavate | |||
| COST PER INSTALLED 10-FOOT GROUND ROD | |||
| COST PER LINEAR FOOT OF GROUND WIRE IN PRE-EXCAVATED TRENCH | |||
| COST PER WRENCH-LOK CONNECTION ON GROUND WIRE / ROD | |||
| COST PER LINEAR FOOT OF CONTROL CABLE CONDUIT TRENCH | |||
| Machine Excavate | |||
| Hand Excavate | |||
| COST PER LINEAR FOOT OF PVC CONDUIT | |||
| 1-inch PVC | |||
| TOTAL INSTALLATION: | |||
| 2-inch PVC | |||
| 4-inch PVC | |||
| 6-inch PVC | |||
| COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CONDUIT / CABLE TRENCH | |||
| COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CABLE TRAY (INCLUDING SECURING CABLE TO TRAY) | |||
| CONTROL CABLE TERMINATIONS | |||
| COST PER INSTALLED TON OF COMPACTED CRUSHER RUN STONE | |||
| COSTS FOR FIELD CORRECTION OF MISFAB AS LISTED BELOW. WORK TO BE APPROVED IN ADVANCE BY OWNER. PRICE TO INCLUDE PAINTING OF PUNCHED OR CLIPPED STEEL SURFACES WITH GALVANOX PAINT | |||
| Clipping angles or flat stock | |||
| Punching or drilling per hole | |||
| Punching or drilling and tapping per hole | |||
| Reaming per hole | |||
| ROCK EXCAVATION - COST PER CUBIC YARD | |||
| Foundations | |||
| Pad-Pier Type | |||
| Pad-Type | |||
| Ground Grid / Conduit Ditch | |||
| Oil-Containment Pit | |||
| LABOR | |||
| DESCRIPTION | HOURLY RATE | ||
| REGULAR | OVERTIME | ||
| Supervisor | |||
| General Foreman | |||
| Foreman | |||
| Journeyman Lineman / Wireman | |||
| Equipment Operator | |||
| Groundman | |||
| EQUIPMENT | |||
| DESCRIPTION | UNIT (per day/hour/week) | COST | |
| Pickup Truck | |||
| Backhoe | |||
| Bucket Truck: 40 to 55 feet | |||
| Bucket Truck: 60 feet plus | |||
| Trencher | |||
| Air Compressor | |||
| Crane Truck: 20-ton | |||
| All-Terrain Crane: 45-ton | |||
| Unit Pricing shall be used in the event work is added or deleted from the project. |
CLIENT:City of Rocky Mount
PROJECT:Substation 10 Transformer Upgrade
UNIT PRICING PROPOSAL PROJECT NO.:P.0752679.S.00
CONTRACTOR:
DATE:
MATERIAL COST
DESCRIPTION LABOR MATERIAL TOTAL
COST PER INSTALLED CUBIC YARD OF CONCRETE PER GROUP L
Pad-Pier Type Foundation
Pad-Type Foundation
COST PER INSTALLED POUND OF REBAR
COST PER LINEAR FOOT OF GROUND WIRE DITCH
Machine Excavate
Hand Excavate
COST PER INSTALLED 10-FOOT GROUND ROD
COST PER LINEAR FOOT OF GROUND WIRE IN PRE-EXCAVATED
TRENCH
COST PER WRENCH-LOK CONNECTION ON GROUND WIRE / ROD
COST PER LINEAR FOOT OF CONTROL CABLE CONDUIT TRENCH
Machine Excavate
Hand Excavate
COST PER LINEAR FOOT OF PVC CONDUIT
1-inch PVC
TOTAL INSTALLATION:
2-inch PVC
4-inch PVC
6-inch PVC
COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CONDUIT
/ CABLE TRENCH
COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CABLE
TRAY (INCLUDING SECURING CABLE TO TRAY)
CONTROL CABLE TERMINATIONS
COST PER INSTALLED TON OF COMPACTED CRUSHER RUN STONE
COSTS FOR FIELD CORRECTION OF MISFAB AS LISTED BELOW.
WORK TO BE APPROVED IN ADVANCE BY OWNER. PRICE TO
INCLUDE PAINTING OF PUNCHED OR CLIPPED STEEL SURFACES
WITH GALVANOX PAINT
Clipping angles or flat stock
Punching or drilling per hole
Punching or drilling and tapping per hole
Reaming per hole
ROCK EXCAVATION - COST PER CUBIC YARD
Foundations
Pad-Pier Type
Pad-Type
Ground Grid / Conduit Ditch
Oil-Containment Pit
LABOR
HOURLY RATE
DESCRIPTION
REGULAR OVERTIME
Supervisor
General Foreman
Foreman
Journeyman Lineman / Wireman
Equipment Operator
Groundman
EQUIPMENT
UNIT
DESCRIPTION COST
(per day/hour/week)
Pickup Truck
Backhoe
Bucket Truck: 40 to 55 feet
Bucket Truck: 60 feet plus
Trencher
Air Compressor
Crane Truck: 20-ton
All-Terrain Crane: 45-ton
Unit Pricing shall be used in the event work is added or deleted from the project.
Proj no xxx P - 3
(C) Month Year C2 - Restricted
#
| CLIENT: City of Rocky Mount PROJECT: Substation 10 Transformer Upgrade OWNER-FURNISHED MATERIAL LIST PROJECT NO.: P.0752679.S.00 CONTRACTOR: DATE: | |||||||
|---|---|---|---|---|---|---|---|
| GROUP | SUBSTATION ASSEMBLY UNIT | DELIVERY LOCATION | SUPPLIER | ESTIMATED DELIVERY DATE | QTY | UNIT PRICE | EXTENDED PRICE |
| A | Structures | site | By Contractor | In Stock | 1 lot | ||
| B | Three-Pole Group-Operated Air-Break Switches | site | Existing | 2 each | |||
| D | Single-Pole Disconnecting Switches | site | Existing | 4 each | |||
| E | Circuit Breakers | site | Existing | 1 each | $50,000.00 | $50,000.00 | |
| G | Meters, Relays & Instrument Transformers | site | Existing | 3 each | |||
| H1 | Station Service Transformers | site | Existing | 1 each | |||
| H2 | Power Transformers | site | Virginia Transformer | 1/31/26 | 1 each | $1,436,075.00 | $1,436,075.00 |
| TOTAL PRICE: | $1,486,075.00 |
CLIENT: City of Rocky Mount
PROJECT: Substation 10 Transformer Upgrade
OWNER-FURNISHED MATERIAL LIST PROJECT NO.: P.0752679.S.00
CONTRACTOR:
DATE:
ESTIMATED
DELIVERY EXTENDED
GROUP SUBSTATION ASSEMBLY UNIT SUPPLIER DELIVERY QTY UNIT PRICE
LOCATION PRICE
DATE
A Structures site By Contractor In Stock 1 lot
B Three-Pole Group-Operated Air-Break Switches site Existing 2 each
D Single-Pole Disconnecting Switches site Existing 4 each
E Circuit Breakers site Existing 1 each $50,000.00 $50,000.00
G Meters, Relays & Instrument Transformers site Existing 3 each
H1 Station Service Transformers site Existing 1 each
Virginia
H2 Power Transformers site 1/31/26 1 each $1,436,075.00 $1,436,075.00
Transformer
TOTAL PRICE: $1,486,075.00
Proj no xxx P - 4
(C) Month Year C2 - Restricted
#

With GovernmentContracts, you can:
...Solicitation Number: 345-26-C0810 Project Title: Wrightsboro Elevated Water Tank Rehabilitation... Tank Rehabilitation project. ...
State Government of North Carolina
Bid Due: 10/27/2026
...Bid Title: Wrightsboro Elevated Water Tank Rehabilitation Category: Construction Services Status... Water Tank ...
Cape Fear Public Utility Authority
Bid Due: 10/27/2026
...Bid Number Title Due Date Other Files Tab Sheet 26-60 RFB for Westside ...
Greenville Utilities
Bid Due: 10/28/2026
...Solicitation Number: 298-FY27-WTR-RFQ-WCTankAssessment Project Title: Walnut Cove Water Tank... Assessment Description: Request for ...
State Government of North Carolina
Bid Due: 10/19/2026