Substation 10 Transformer Upgrade Re-Bid

Location: North Carolina
Posted: Oct 5, 2026
Due: Oct 14, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 320-040226FD Re-Bid
Publication URL: To access bid details, please log in.
Solicitation Number: 320-040226FD Re-Bid
Project Title: Substation 10 Transformer Upgrade Re-Bid
Description: General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment System for the transformer which has been designed to contain accidental spills and/or tank rupture within the area surrounding the power transformer. The installation of this system involves the excavation of a large basin around the transformer foundation. The basin will be permanently formed with reinforced concrete walls and floors. The containment basin is designed with concrete flush splash pads to allow all rainwater to drain out at a single outlet. The Contractor shall be responsible for furnishing the labor and materials to install the concrete basins, and shall be responsible for the labor to complete the installation of the pumps and all associated electrical/plumbing materials for a complete system. The Contractor shall furnish the mechanical sump package as outlined in the "List of Materials for the Oil Containment System" following these specifications. The Contractor shall furnish all concrete, reinforcing steel, galvanized steel bar grating, and framing materials for the concrete basin.
Opening Date: 10/14/2026 2:00 PM
Posted Date: 10/6/2026
Status: Open
Department: CITY OF ROCKY MOUNT
Solicitation Number
*
320-040226FD Re-Bid
Department
CITY OF ROCKY MOUNT
Status Reason
Open
Opening Date
2026-10-14T14:00:00.0000000
Posted Date
*
2026-10-05T20:51:57.0000000Z
Primary Commodity Code
Distribution and control centers and accessories
Mandatory Conference/Site Visit
—
—
Special Instructions
—
Solicitation Type
*
RFP
Owner
Alicia Gaines
Description
General The Oil Containment Specifications, Foundation Specifications, and Drawings are complementary, each to the other. The Substation 10 project includes the placement of the Oil Containment System for the transformer which has been designed to contain accidental spills and/or tank rupture within the area surrounding the power transformer. The installation of this system involves the excavation of a large basin around the transformer foundation. The basin will be permanently formed with reinforced concrete walls and floors. The containment basin is designed with concrete flush splash pads to allow all rainwater to drain out at a single outlet. The Contractor shall be responsible for furnishing the labor and materials to install the concrete basins, and shall be responsible for the labor to complete the installation of the pumps and all associated electrical/plumbing materials for a complete system. The Contractor shall furnish the mechanical sump package as outlined in the "List of Materials for the Oil Containment System" following these specifications. The Contractor shall furnish all concrete, reinforcing steel, galvanized steel bar grating, and framing materials for the concrete basin.

Attachment Preview

CLIENT:City of Rocky Mount PROJECT:Substation 10 Transformer Upgrade LABOR AND MATERIAL PROPOSAL PROJECT NO.:P.0752679.S.00 CONTRACTOR: DATE:
UNIT PRICING LABOR AND
GROUP DESCRIPTION QTY UNIT LABOR CONTRACTOR- FURNISHED MATERIAL MATERIAL EXTENDED COST
A Structures 1 lot
B Three-Pole Group Operated Air Break Switches 2 each
D Single-Pole Disconnecting Switches 4 each
E Power Circuit Breakers 1 each
G Meters, Relays, and Instrument Transformers 3 each
H1 Station Service Transformers 1 each
H2 Power Transformers (including lifting and placement on pad) 1 each
K Conduit and Cable 1 lot
L Foundations 1 lot
M Site Preparation (Yard Stone) 1 lot
O Station Grounding 1 lot
Q Oil-Containment System 1 lot
T Testing 1 lot
W Demolition 1 lot
TOTAL LABOR:
TOTAL OWNER-FURNISHED MATERIAL COST: $1,486,075.00
TOTAL INSTALLATION: $1,486,075.00

CLIENT:City of Rocky Mount
PROJECT:Substation 10 Transformer Upgrade
LABOR AND MATERIAL PROPOSAL PROJECT NO.:P.0752679.S.00
CONTRACTOR:
DATE:
UNIT PRICING
LABOR AND
GROUP DESCRIPTION QTY UNIT CONTRACTOR- MATERIAL
LABOR FURNISHED EXTENDED COST
MATERIAL
A Structures 1 lot
B Three-Pole Group Operated Air Break Switches 2 each
D Single-Pole Disconnecting Switches 4 each
E Power Circuit Breakers 1 each
G Meters, Relays, and Instrument Transformers 3 each
H1 Station Service Transformers 1 each
H2 Power Transformers (including lifting and placement on pad) 1 each
K Conduit and Cable 1 lot
L Foundations 1 lot
M Site Preparation (Yard Stone) 1 lot
O Station Grounding 1 lot
Q Oil-Containment System 1 lot
T Testing 1 lot
W Demolition 1 lot
TOTAL LABOR:
TOTAL OWNER-FURNISHED MATERIAL COST: $1,486,075.00
TOTAL INSTALLATION: $1,486,075.00
Proj no xxx P - 2
(C) Month Year C2 - Restricted
#

CLIENT:City of Rocky Mount PROJECT:Substation 10 Transformer Upgrade UNIT PRICING PROPOSAL PROJECT NO.:P.0752679.S.00 CONTRACTOR: DATE:
MATERIAL COST
DESCRIPTION LABOR MATERIAL TOTAL
COST PER INSTALLED CUBIC YARD OF CONCRETE PER GROUP L
Pad-Pier Type Foundation
Pad-Type Foundation
COST PER INSTALLED POUND OF REBAR
COST PER LINEAR FOOT OF GROUND WIRE DITCH
Machine Excavate
Hand Excavate
COST PER INSTALLED 10-FOOT GROUND ROD
COST PER LINEAR FOOT OF GROUND WIRE IN PRE-EXCAVATED TRENCH
COST PER WRENCH-LOK CONNECTION ON GROUND WIRE / ROD
COST PER LINEAR FOOT OF CONTROL CABLE CONDUIT TRENCH
Machine Excavate
Hand Excavate
COST PER LINEAR FOOT OF PVC CONDUIT
1-inch PVC
TOTAL INSTALLATION:
2-inch PVC
4-inch PVC
6-inch PVC
COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CONDUIT / CABLE TRENCH
COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CABLE TRAY (INCLUDING SECURING CABLE TO TRAY)
CONTROL CABLE TERMINATIONS
COST PER INSTALLED TON OF COMPACTED CRUSHER RUN STONE
COSTS FOR FIELD CORRECTION OF MISFAB AS LISTED BELOW. WORK TO BE APPROVED IN ADVANCE BY OWNER. PRICE TO INCLUDE PAINTING OF PUNCHED OR CLIPPED STEEL SURFACES WITH GALVANOX PAINT
Clipping angles or flat stock
Punching or drilling per hole
Punching or drilling and tapping per hole
Reaming per hole
ROCK EXCAVATION - COST PER CUBIC YARD
Foundations
Pad-Pier Type
Pad-Type
Ground Grid / Conduit Ditch
Oil-Containment Pit
LABOR
DESCRIPTION HOURLY RATE
REGULAR OVERTIME
Supervisor
General Foreman
Foreman
Journeyman Lineman / Wireman
Equipment Operator
Groundman
EQUIPMENT
DESCRIPTION UNIT (per day/hour/week) COST
Pickup Truck
Backhoe
Bucket Truck: 40 to 55 feet
Bucket Truck: 60 feet plus
Trencher
Air Compressor
Crane Truck: 20-ton
All-Terrain Crane: 45-ton
Unit Pricing shall be used in the event work is added or deleted from the project.

CLIENT:City of Rocky Mount
PROJECT:Substation 10 Transformer Upgrade
UNIT PRICING PROPOSAL PROJECT NO.:P.0752679.S.00
CONTRACTOR:
DATE:
MATERIAL COST
DESCRIPTION LABOR MATERIAL TOTAL
COST PER INSTALLED CUBIC YARD OF CONCRETE PER GROUP L
Pad-Pier Type Foundation
Pad-Type Foundation
COST PER INSTALLED POUND OF REBAR
COST PER LINEAR FOOT OF GROUND WIRE DITCH
Machine Excavate
Hand Excavate
COST PER INSTALLED 10-FOOT GROUND ROD
COST PER LINEAR FOOT OF GROUND WIRE IN PRE-EXCAVATED
TRENCH
COST PER WRENCH-LOK CONNECTION ON GROUND WIRE / ROD
COST PER LINEAR FOOT OF CONTROL CABLE CONDUIT TRENCH
Machine Excavate
Hand Excavate
COST PER LINEAR FOOT OF PVC CONDUIT
1-inch PVC
TOTAL INSTALLATION:
2-inch PVC
4-inch PVC
6-inch PVC
COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CONDUIT
/ CABLE TRENCH
COST PER INSTALLED LINEAR FOOT OF CONTROL CABLE IN CABLE
TRAY (INCLUDING SECURING CABLE TO TRAY)
CONTROL CABLE TERMINATIONS
COST PER INSTALLED TON OF COMPACTED CRUSHER RUN STONE
COSTS FOR FIELD CORRECTION OF MISFAB AS LISTED BELOW.
WORK TO BE APPROVED IN ADVANCE BY OWNER. PRICE TO
INCLUDE PAINTING OF PUNCHED OR CLIPPED STEEL SURFACES
WITH GALVANOX PAINT
Clipping angles or flat stock
Punching or drilling per hole
Punching or drilling and tapping per hole
Reaming per hole
ROCK EXCAVATION - COST PER CUBIC YARD
Foundations
Pad-Pier Type
Pad-Type
Ground Grid / Conduit Ditch
Oil-Containment Pit
LABOR
HOURLY RATE
DESCRIPTION
REGULAR OVERTIME
Supervisor
General Foreman
Foreman
Journeyman Lineman / Wireman
Equipment Operator
Groundman
EQUIPMENT
UNIT
DESCRIPTION COST
(per day/hour/week)
Pickup Truck
Backhoe
Bucket Truck: 40 to 55 feet
Bucket Truck: 60 feet plus
Trencher
Air Compressor
Crane Truck: 20-ton
All-Terrain Crane: 45-ton
Unit Pricing shall be used in the event work is added or deleted from the project.
Proj no xxx P - 3
(C) Month Year C2 - Restricted
#

CLIENT: City of Rocky Mount PROJECT: Substation 10 Transformer Upgrade OWNER-FURNISHED MATERIAL LIST PROJECT NO.: P.0752679.S.00 CONTRACTOR: DATE:
GROUP SUBSTATION ASSEMBLY UNIT DELIVERY LOCATION SUPPLIER ESTIMATED DELIVERY DATE QTY UNIT PRICE EXTENDED PRICE
A Structures site By Contractor In Stock 1 lot
B Three-Pole Group-Operated Air-Break Switches site Existing 2 each
D Single-Pole Disconnecting Switches site Existing 4 each
E Circuit Breakers site Existing 1 each $50,000.00 $50,000.00
G Meters, Relays & Instrument Transformers site Existing 3 each
H1 Station Service Transformers site Existing 1 each
H2 Power Transformers site Virginia Transformer 1/31/26 1 each $1,436,075.00 $1,436,075.00
TOTAL PRICE: $1,486,075.00

CLIENT: City of Rocky Mount
PROJECT: Substation 10 Transformer Upgrade
OWNER-FURNISHED MATERIAL LIST PROJECT NO.: P.0752679.S.00
CONTRACTOR:
DATE:
ESTIMATED
DELIVERY EXTENDED
GROUP SUBSTATION ASSEMBLY UNIT SUPPLIER DELIVERY QTY UNIT PRICE
LOCATION PRICE
DATE
A Structures site By Contractor In Stock 1 lot
B Three-Pole Group-Operated Air-Break Switches site Existing 2 each
D Single-Pole Disconnecting Switches site Existing 4 each
E Circuit Breakers site Existing 1 each $50,000.00 $50,000.00
G Meters, Relays & Instrument Transformers site Existing 3 each
H1 Station Service Transformers site Existing 1 each
Virginia
H2 Power Transformers site 1/31/26 1 each $1,436,075.00 $1,436,075.00
Transformer
TOTAL PRICE: $1,486,075.00
Proj no xxx P - 4
(C) Month Year C2 - Restricted
#

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Solicitation Number: 345-26-C0810 Project Title: Wrightsboro Elevated Water Tank Rehabilitation... Tank Rehabilitation project. ...

State Government of North Carolina

Bid Due: 10/27/2026

...Bid Title: Wrightsboro Elevated Water Tank Rehabilitation Category: Construction Services Status... Water Tank ...

Cape Fear Public Utility Authority

Bid Due: 10/27/2026

...Bid Number Title Due Date Other Files Tab Sheet 26-60 RFB for Westside ...

Greenville Utilities

Bid Due: 10/28/2026

...Solicitation Number: 298-FY27-WTR-RFQ-WCTankAssessment Project Title: Walnut Cove Water Tank... Assessment Description: Request for ...

State Government of North Carolina

Bid Due: 10/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.