| Location: | Georgia |
|---|---|
| Posted: | Jul 1, 2026 |
| Due: | Jul 2, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA857126Q0087 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This solicitation is being conducted under Simplified Acquisition Procedures (SAP) as a Request for Quote (RFQ) No. FA857126QOO87. This requirement is being solicited as a single source requirement to the Original Equipment Manufacturer (OEM) for the repair of L7-090 Liner and purchase of one (1) additional L7-090 Liner.
The Contractor shall provide all the tools, parts, materials, equipment, labor, repairs, and travel necessary to perform repairs on the existing Polyvinylidene Flouride (PVDF) L7-090 Liner for the Chemical Storage Tank in Building 20128 and supply one (1) new L7-090 Liner for the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. The Contractor shall repair the existing liner in the facility inside of L7-090. The additional spare liner shall be identical in contruction, material, and instrumentation to the existing liner and be stored by CMXG for future use.
The Contractor shall provide the following:
• Repair of L7-090 Liner on Tank 120 at Building 20128. This will include one (1) technician to facilitate repairs.
• 1 each (PVDF) Kynar® Rigid Box Liner to fit CMXG’s existing tank
• Approximately 48” x 48” x 72” deep, fabricated from ¼” thick Kynar 2850 Flex sidewalls and rim and 3/8” thick Kynar 2850 Flex bottom. Liner will be fabricated incorporating Patented (#8,133,345) N-FUZE lining technology, utilizing pressure butt-welded vertical joints and extrusion welded sidewall to bottom contruction. The tank shall have one (1) 45 degree corner where CMXG can re-install existing TANKeye Plus Leak Dectection System
Amendment 0001 corrects Period of Performance for CLIN 0002 and adjust responses due date to account for the High Priority need of this effort.

With GovernmentContracts, you can:
...2026 SAP Project Lee County Board Of Commissioners Jul 01, 2026 @ 09:40 ...
State Government of Georgia
Bid Due: 7/28/2026
...2026 SAP Road Striping Project Mitchell County Board Of Commissioners Jul 07, 2026 ...
State Government of Georgia
Bid Due: 8/06/2026
...SAP S016224, CENTERLINE AND EDGE STRIPING Habersham County Board Of Commissioners Jul 07, ...
State Government of Georgia
Bid Due: 7/31/2026
...the authority of FAR 13.106-1(b) (SAP) and 10 U.S.C. 2304(c)(1). Interested persons may ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/30/2026