| Location: | Washington |
|---|---|
| Posted: | Feb 2, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 93-2021-0058 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work generally includes the following:
1. Solids Processing Center (Building 72): Replacement of existing dewatering belt filter presses with new dewatering screw presses. Modification of sludge feed piping, W3 water piping, polymer piping, and odor control ducting. Installation of personnel access grating and platforms, a new monorail system, and ancillary equipment.
2. Solids Processing Center (Building 72): Installation of exterior stairs and entrance to upper level of facility.
3. Digester/BFP Feed Control Building (Building 77): Replacement of BFP Feed Pumps with new Screw Press Feed Pumps.
4. Temporary Systems: Installation and relocation of temporary dewatering screw press during the replacement of dewatering system.
5. Installation of new level sensors for the Biosolids Blend Tank (Facility 76) and Sludge Blend Tank (Facility 74).
The engineer's estimate for this project is $7,700,000.

With GovernmentContracts, you can:
...of a maintenance foot path and vehicle access, hot mix asphalt (HMA) saw ...
State Government of Washington
Bid Due: 6/24/2026
...with a wrap-around access platform for staff operating the facility and a large ...
Federal Agency
Bid Due: 7/06/2026
...include removal of the existing crossovers used for temporary traffic control, restoring delineation... ...
State Government of Washington
Bid Due: 7/01/2026
..., erosion control, removal and installation of beam guardrail and high tension cable ...
State Government of Washington
Bid Due: 7/15/2026