| Location: | Washington |
|---|---|
| Posted: | Apr 12, 2026 |
| Due: | May 12, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C1222 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes repair the fish passage barrier found on the unnamed tributary to Willapa River that flows under Willapa Hills Trail in Lebam, WA. The scope of work for this fish passage restoration project will include but not be limited to site preparation including clearing & grubbing, culvert removal, trail fill excavation, stream construction slope establishment, pre-cast abutment installation, bridge installation, trail approach fill & gravel installation, bridge concrete finishing completion, planting & site cleanup, and associated utilities work (if any). Removal of the existing undersized 2 quantity 3 ft. diameter culverts and replacement with a 10 ft. wide by 100-foot-long bridge to correct the existing fish passage barrier. Major items included in the base bid (but not limited to) are:
Trench Excavation Safety Provisions.
Site Preparation.
Trail Excavation & Stream Channel.
Bridge & Abutment Installation.
Site Cleanup.

With GovernmentContracts, you can:
Project: BID - SSC - Auto HVAC Replacement - South Seattle College Ref.
State Government of Washington
Bid Due: 11/19/2026
Bid Number: JCSO-04 Bid Title: Jail Food Services Category: Sheriff Dept Status: Open
Jefferson County
Bid Due: 11/23/2026
Follow REQUEST FOR INFORMATION (RFI) - No.10826-RD [Mid-energy electron beam (eBeam) systems -
ENERGY, DEPARTMENT OF
Bid Due: 11/18/2026
Follow NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1 Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 11/30/2026