| Location: | Washington |
|---|---|
| Posted: | Apr 12, 2026 |
| Due: | May 12, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | NW-C1222 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes repair the fish passage barrier found on the unnamed tributary to Willapa River that flows under Willapa Hills Trail in Lebam, WA. The scope of work for this fish passage restoration project will include but not be limited to site preparation including clearing & grubbing, culvert removal, trail fill excavation, stream construction slope establishment, pre-cast abutment installation, bridge installation, trail approach fill & gravel installation, bridge concrete finishing completion, planting & site cleanup, and associated utilities work (if any). Removal of the existing undersized 2 quantity 3 ft. diameter culverts and replacement with a 10 ft. wide by 100-foot-long bridge to correct the existing fish passage barrier. Major items included in the base bid (but not limited to) are:
Trench Excavation Safety Provisions.
Site Preparation.
Trail Excavation & Stream Channel.
Bridge & Abutment Installation.
Site Cleanup.

With GovernmentContracts, you can:
...Solicitation Close Date: 07/13/26 Title: Samish River Unit Tree and Shrub Planting Project ...
State Government of Washington
Bid Due: 7/13/2026
...trees for the planting season in the Fall and Winter of 2026-2027. The ...
Snohomish Conservation District
Bid Due: 6/17/2026
...all landscaped areas. * Fertilization and soil conditioning. * Seasonal planting and replacement... ...
Quinault Indian Nation
Bid Due: 6/12/2026
...sod, install plantings, and install grass seed. * Engineers' estimates range for this ...
City of Sedro Woolley
Bid Due: 6/16/2026