IFB/GS/DWM/2604-1260190/Color Video Pipeline and Sewer Cleaning Equipment

Location: Georgia
Posted: Jun 9, 2026
Due: Jun 23, 2026
Agency: State Government of Georgia
Type of Government: State & Local
Category:
  • 67 - Photographic Equipment
  • 79 - Cleaning Equipment and Supplies
Solicitation No: PE-66062-NONST-2026-000000412
Publication URL: To access bid details, please log in.
Event ID Event Title Government Entity Start Date (ET) End Date (ET)
PE-66062-NONST-2026-000000412 IFB/GS/DWM/2604-1260190/Color Video Pipeline and Sewer Cleaning Equipment Atlanta, City Of
Jun 08, 2026 @ 09:19 PM
Jun 23, 2026 @ 02:00 PM
IFB/GS/DWM/2604-1260190/Color Video Pipeline and Sewer Cleaning Equipment

Start Date: Jun 08, 2026 @ 09:19 PM ET

End Date:
Jun 23, 2026 @ 02:00 PM ET

Event ID: PE-66062-NONST-2026-000000412
Event Type: Non-State Agency
Event Status: Open
Purchase Type: Non-State Agency
Category Type: Goods
Government Type: city
Fiscal Year: 2026
Agency Site: Link


Description


The Department of Watershed Management (DWM) is seeking bids through an Invitation for Bids (IFB) for the procurement of new and replacement color video pipeline inspection systems, sewer cleaning units, OEM-certified accessories, and maintenance support services. These resources are essential to support sewer line inspection, cleaning operations, and the effective management of wastewater infrastructure assets.

To review the procurement solicitation in its entirety and participate in the bidding process, interested bidders must be registered vendors with the City of Atlanta. Registration and solicitation documents are available through the City's supplier portal at https://www.atlsuppliers.com/.

NIGP Codes
Code Description
96292 Video Scanning of Sewers, Water Wells, etc., Electronic
89077 Waste Water Reclamation Systems, Including Parts and Accessories
20938 Database Software, Mainframes and Servers
93691 Water Supply and Sewage Treatment Equipment Maintenance and Repair
20880 Software, Microcomputer (Not Otherwise Classified)
96873 Storm Drain Cleaning, Repair, and Sludge Removal Services
22030 Indicating and Recording Instruments, Equipment and Accessories (Not Otherwise Classified)
22036 Oscillographs, Cathode-Ray Recording System, Including Parts and Accessories
89003 Back Flow Preventers for Water and Sewer Pipe
98184 Water and Sewer Equipment, Including Well Pointing Equipment Rental or Lease
06578 Sewer/Catch Basin Cleaning Body and Equipment
21035 Joint Sealing Compound, Sewer and Drain Pipes
48622 Cleaner, Sewer, Septic Tank, and Waste Pipe, Acid and Caustic Types, Including Drain Openers, Enviro
48624 Cleaner, Sewer, Septic Tank, and Waste Pipe, Aerobic Bacteria and Fungi Type, Environmentally Certif
48522 Cleaner, Sewer, Septic Tank, and Waste Pipe, Acid and Caustic Types, Including Drain Openers
48524 Cleaner, Sewer, Septic Tank, and Waste Pipe, Aerobic Bacteria and Fungi Type
67012 Grout, Pipe and Sewer
67061 Sewer Pipe Cleaning Machines, Power Driven; and Parts
88582 Sewer and Septic Treating Chemicals
89051 Root Cutting Equipment, Sewer Lines
89063 Sewer Analyzing, Monitoring, Probe and Related Equipment
89064 Sewer Inspection Equipment
89066 Sewer Lift Stations, Including Parts and Accessories
91063 Public Utilities: Water, Sewer and Gas Maintenance and Repair Services
91345 Construction, Sewer and Storm Drain
91381 Maintenance and Repair, Sewer and Storm Drain, Including Removal
67053 Pipeline Equipment and Tools, Construction and Laying of the Pipeline
91330 Construction, Industrial Pipeline Insulation, Including Maintenance, Repair and Installation
91340 Construction, Pipeline, Including Aerial Crossings
91378 Maintenance and Repair, Pipeline, Including Removal and Relocation
93654 Pipeline Equipment Maintenance and Repair
94169 Pipeline Pressure Flushing Services
95876 Pipeline Management Services
96191 Water and Petroleum Pipeline Services
BuyerContact:

Tequila Blakely
tblakely@atlantaga.gov

470-503-9390

Attachment Preview

Material Type: Color Video Pipeline
Inspection Equipment
Item Number: 8406475
CITY OF ATLANTA SPECIFICATION COLOR VIDEO PIPELINE INSPECTION AND
WATER/ SEWER CLEANER EQUIPMENT, REPAIRS, MAINTENANCE, AND
SOFTWARE
SCOPE AND CLASSIFICATION - PART I
Scope - This specification describes the minimum acceptable requirements for
furnishing, installation, training, preventive maintenance, inspection and repair of color
video pipeline inspection and sewer cleaner equipment for the City of Atlanta,
Department of Watershed Management. Please refer to Scope and Classification - Part
II.
Classification - The material(s) must be classified as follows:
GROUP I COLOR VIDEO PIPELINE INSPECTION SYSTEM
GROUP II LATERAL LAUNCH SYSTEM
GROUP III PUSH CAMERA INSPECTION SYSTEM
GROUP IV CHASSIS WITH CUSTOM BUILD-OUT
GROUP V CHASSIS MOUNTED SEWER COMBINATION
GROUP VI REPAIR, SERVICES AND PARTS
GROUP VII PREVENTIVE MAINTENANCE/WARRANTY
GROUP VIII PIPELOGIX SOFTWARE LICENSE AND SUPPORT
SPECIFICATION REQUIREMENTS
1. Definitions
1.1. "Parts" means the components of a unit to be provided by a Preferred Bidder to the
City of Atlanta.
1.2. "Pricing Line" means the separate pricing that the Bidder submits for each line-item
bid.
1.3. "Service" means the furnishing of labor, time, or effort to repair or rebuild an entire unit
or part(s) of a unit.
2. Standards And Specifications - Material(s), goods, Parts or Service(s) being solicited under
this IFB must comply with the Federal Occupational Safety and Health Acts, Federal Aviation
Rev. 08.22.25

Administration Standards, and Georgia Occupational Safety and Health Act requirements,
where applicable and in effect at time of delivery.
3. Equipment. The equipment to be furnished must be currently on production and must be
manufacturer's standard model complete with all standard equipment. Bidder must be able to
supply 90% of Parts required to maintain this equipment within 24 hours and have access to
the remaining 10% of Parts within 72 hours. Failure to meet this requirement may result in
termination of the contract. To the extent applicable, and except as otherwise expressly
provided in this IFB, all energy consuming equipment purchased will be energy efficient,
defined as meeting either Energy Star specification of criteria that puts products in the upper
25% of energy efficiency, as well as meeting quality, performance, and durability
requirements.
4. Parts and Service Warranty. This Invitation for Bid (IFB) must cover Parts and Service
warranty for one (1) year after delivery date. While under warranty, Bidder must replace any
damaged or inferior item in a prompt and timely manner. Bidder must submit price information
for Parts and Service indicating schedule or rate of discount, which must apply to the City of
Atlanta.
5. Original Manufacturer Part Crossover Numbers. Bidder must supply original
manufacturer part crossover numbers for parts that are not manufactured by the equipment
manufacturer after the award of bid, but prior to the delivery of equipment.
6. Safe Use of Equipment. Bidder (where applicable) must provide a minimum of four (4)
hours instruction on the proper and safe use of the equipment at the Bidder's expense.
7. Manuals. Upon request by the City, Bidder must provide parts, service, and operating manuals
for each unit of equipment provided and submit electronically, one (1) set of descriptive
literature.
8. Without expressed or implied obligation on the part of the City of Atlanta to perform, the
Bidder may submit on a separate sheet an option to the City for a multi-year purchase
concept covering three (3) years' service and parts for equipment covered by its bid. Include
the terms of the multi-year purchase option including terms, price, and expiration date.
8.1. The Code of Ordinance of the City of Atlanta specifically prohibits obligating the City
for future budget years.
8.2. In the event options are exercised to purchase units in subsequent years, the provisions
as related to parts and services will apply as indicated above.
9. Reservation of Rights. The City of Atlanta reserves the right to increase or decrease
quantities shown without penalty.
10. Report of Purchases. Bidder must provide an itemized report of the annual spend ("Report
of Purchases") to the Chief Procurement Officer. The Report of Purchases must be submitted
annually within fifteen (15) days after the anniversary date of the Agreement. Failure to
submit a Report of Purchases may result in forfeiture of future contracts with the City of
Atlanta.
Rev. 08.22.25

11. Brand Name or Trade Name Instructions. If items in this IFB have been identified,
described, or referenced by a brand name or trade name description, such identification is
intended to be descriptive, but not restrictive and is to indicate the quality and characteristics
of products that may be offered. Products may be considered for award if such products are
clearly identified in the bids and are determined by the City of Atlanta to meet its needs in all
respects.
11.1. All bidders, including bidders whose products may be referenced, must clearly
indicate manufacturer/trade name and identifying number in space provided within
Pricing Line of this IFB.
11.2. Bidder must not furnish obsolete and/or near-expired products. If the Bidder proposes
to furnish another product, such products must be clearly identified in the bid. The
evaluation of bids and the determination as to equality of products offered must be the
responsibility of the City and will be based on information furnished by the bidder.
Accordingly, to ensure that sufficient information is available the bidder may be
required to submit literature and/or samples prior to award. These must be supplied
within seven (7) days, if required.
11.3. The purchase of any item by the City, as a result of this Invitation for Bid, is not a
judgment of one product against another. Consideration of application, need, and
price will constitute purchase determination.
12. Like or Similar Goods. Bidder is only permitted to provide like or similar goods or services
to those identified in its bid, if the goods or services identified in the bid are discontinued or
out of stock. Vendor must provide like or similar goods or services at the same price(s) quoted
in its bid. The City will not absorb any cost increases for like or similar goods or services.
12.1. Bidder must provide like, or similar goods or services not listed in the bid price (s) at
or below standard industry rates.
12.2. Bidder must meet or beat store, municipal, state and federal pricing for items bid on.
12.3. Bidder must provide like and similar goods or a direct substitute not listed on pricing
lines at _______% discount from catalog prices.
13. Quality Assurance
13.1. Test and Inspection. It is Bidder's responsibility to perform all tests and inspections
required by this specification unless otherwise stated in the purchase order, data sheet,
and/or contract. The Bidder may use in the process his/her own facility or any
recognized independent laboratory acceptable to the City of Atlanta. The City of
Atlanta reserves the right to perform any of the tests and inspection requirements
where such tests and inspections are needed to further determine compliance with the
specification. If such testing is needed, Bidder must pay for all testing costs.
13.2. Certification. Material covered by this specification must be manufacturer original
parts or approved by the manufacturer for use in the specified systems. Certification to
this standard must be provided with the Parts and/or Service. It is Bidder's
responsibility to ensure that that all parts and/or services meet industry standards. Full
Rev. 08.22.25

acceptance of the materials must be subject upon findings of suitability as determined
under Subsection 13.1.
13.3. Sampling. It is the Bidder's responsibility to submit a random sample testing in
accordance with this specification. Material furnished must be identical to the sample
submitted for performance test and must comply with the requirements set forth
herein. If the material does not comply with the requirements of this specification, or
is not identical to the original sample submitted, the Bidder must be required to replace
all such materials at its own expense. This includes all handling charges and
transportation, with the material that does so comply.
13.4. Quality and Quantity Control - A system of test and inspection must be used to ensure
receipt of the quality and quantity of items supplied. Goods will be promptly
unpacked and inspected; any discrepancies from purchase order or supplier invoice
will be reported immediately to the Chief Procurement Officer of the Department of
Procurement.
13.5. Plant and Facility Inspections - The Department of Procurement may require the
Bidder to make their plant and facilities available for inspection or may require
additional information concerning the Bidder's ability to comply with the requirements
of this specification, or its ability to perform in accordance with delivery requirements
and within budget. In addition to the above, Bidder may be required to produce shop
orders and backlog orders documentation. Failure to comply with this requirement
may cause rejection of the bid package.
13.6. Protection - The Bidder must assume all costs arising from the use of patented
materials, devices, or processes incorporated in the materials furnished. The Bidder
further agrees to indemnify and hold harmless the City of Atlanta and its duly
authorized agents from suits of law or actions of any nature for or on account of the
use of any patented materials, equipment devices or processes.
13.7. Travel and Lodging Expenses - The City of Atlanta may require one (1) or more onsite
visits to the Bidder's site to assure Bidder's compliance with the City's requirements
and other applicable requirements. Suppliers must reimburse the City, in accordance
with the City of Atlanta's Code of Ethics provisions, for authorized travel and lodging
expenses related to such onsite evaluations after the purchase order has been assigned
and occur no later than 30 days after receipt of invoice.
14. Preparation for Delivery
14.1. Packing - Packing must be accomplished in accordance with acceptable commercial
practices for domestic shipments, unless otherwise stated in the Agreement and/or
purchase order. The Bidder must make shipments using the minimum number of
containers consistent with the requirements of safe transit, available mode of
transportation and routing. It is the Bidder's responsibility to determine that packing is
adequate to assure that all materials must arrive at destination in undamaged
conditions ready for intended use.
Rev. 08.22.25

14.2. Marking - All packages must be identified with the City of Atlanta purchase order
number and the User Department. Sealed packing lists must be affixed to all cartons
showing its content.
14.3. Shipping - The Bidder must follow shipping instructions as stated in the purchase
order or Agreement.
15. Subcontracting. If awarded a contract, the use of subcontractors is permitted. However,
Bidder must: (i) remain responsible for the goods, installation, delivery, and any services
provided by the subcontractor; (ii) remain City's sole point of contact for the goods and/or
services provided under the Agreement; and (iii) be solely responsible for the payment of any
subcontractor.
15.1. Bidder must identify all subcontractors it intends to use in its bid. Failure to disclose
all subcontractors in a bid submission will result in termination of an Agreement if
awarded.
15.2. All subcontractors must complete the subcontractor Illegal Immigration Reform and
Enforcement Act (IIREA) Form and the completed subcontractor forms must be
included in the Bidder's bid.
16. Payment Terms. Bidder will provide payment terms of five percent (5%) 10, net 30 calendar
days of invoice price. Otherwise, terms will be net 30 calendar days.
17. Warranty. It is the Bidder's responsibility to submit, at time of shipment, the original
manufacturer's warranty of the goods/material(s) supplied.
18. Guarantee. The material must be guaranteed to be free from defects of construction,
conception, and workmanship for a period of at least 12 months or manufacturer's warranty
whichever is greatest from date of acceptance. Any part or portion found not in accordance
with this specification will be rejected and returned to Bidder at Bidder's expense for
immediate replacement.
19. Price Escalation and De-Escalation.
19.1 Preference must be given to the bidder submitting the lowest and best firm price as
their bid. Should it be found that due to unusual market conditions it is in the best
interest of the City of Atlanta to accept a price with an escalation/de-escalation clause,
the following must apply:
19.2 The contract price must be frozen for a specified period. This period must be shown
on your bid.
19.3 Cost data to support any proposed increase must be submitted to the Chief
Procurement Officer of the Department of Procurement not less than 30 days prior to
the effective date of any such requested price increase.
Rev. 08.22.25

19.4 Any adjustment allowed must consist only of bona fide cost increases resulting from
such situations as unforeseen raw material cost increase which may be passed on to the
consumer.
19.5 No adjustment must be made to compensate a supplier for inefficiency in operation, or
for additional profit.
19.6 In the event that market media indicators show that the prices for those materials,
goods, or services have overall decreased but the vendor has failed to pass the price
decrease onto the City, the City reserves the right to place the vendor in default for
cause, cancel the awarded contract, remove the vendor from the City of Atlanta
Bidders List for a period deemed suitable to the City, and recuperate any damages
from the vendor.
SCOPE AND CLASSIFICATION - PART II
2. REQUIREMENTS
Vendor must state "Compliance" or "Exception" for the requirements listed below for each group.
Check marks, dittos, or any other markings may not be accepted, and your bid could be rejected.
For the purpose of this bid, "Parts" must be defined as components of a unit to be provided by the
vendor to the City. "Service" must be defined as the furnishing of labor time or effort by a vendor,
to repair or rebuild (where applicable), a part, component, or (where applicable), the unit/item as
a whole.
Please note failure to complete all required forms in detail will result in a non-responsive bid and
ineligible for award.
_______________________ _______________________
Compliance Exception
Vendor must provide reasonable and agreed upon pricing for all "Sewer Cleaning Equipment and
"Sewer Line Inspection Equipment" not listed on this bid and provide like and similar goods at
State, Store, Fleet, or better pricing.
____________________ ____________________
Compliance Exception
Procedures - Bidder must comply with procedures established and outlined by the Department of
Watershed Management with regard to requesting services, accepting services and payment
processes. NOTE: All invoices must include the purchase order number to avoid payment delays.
____________________ ____________________
Compliance Exception
Rev. 08.22.25

Design - All vehicles and allied equipment must be new modeled inventory vehicles.
____________________ ____________________
Compliance Exception
City of Atlanta expects all stock equipment to be delivered within 14 business days or less.
____________________ ____________________
Compliance Exception
Subcontractors - Subcontractors are allowed per this bid, but the City of Atlanta will only respond
to the prime vendor. It is the prime vendor's responsibility to coordinate any equipment
installation and deliveries. The City will hold the prime vendor liable for all equipment orders for
this contract.
_____________ ____________________
Compliance Exception
Vendors must provide state of Georgia equipment pricing or better during process.
_____________ ____________________
Compliance Exception
Vendors must provide a 5% discount each day if equipment is not delivered within the time
specified in this contract. This requirement will be waived in the event of Force Majeure.
____________________ ____________________
Compliance Exception
Vendor must provide 5%, 10, net 30 payment terms.
____________________ ____________________
Compliance Exception
NOTE: The following section applies for Groups I through VI.
The services in this Bid must consist of the purchase of new sewer line inspection equipment,
sewer cleaner equipment, and upfitting, repair and preventive maintenance services.
____________________ ____________________
Compliance Exception
Rev. 08.22.25

These services requested in this contract will be oriented towards the completion of specific tasks.
The City is under no obligation to exclusively award this work to a single bidder nor is the City
bound to a minimum contract amount.
____________________ ____________________
Compliance Exception
Successful bidders must own or have full access to a fully functional machine shop and field
service equipment to perform inspection and repair of sewer line inspection and cleaning
equipment or any other related water and sewer equipment.
____________________ ____________________
Compliance Exception
Successful bidders must have qualified personnel certified to perform inspection and repairs.
____________________ ____________________
Compliance Exception
The successful bidder will be required to perform some services at City facilities.
____________________ ____________________
Compliance Exception
The Vendor must provide a written quote for any service requested from this contract. Quotes
approved by the Using Agency will be considered binding subject to the provisions of the contract.
All costs must be itemized on the Vendor quote and must involve the use of specific, identified
costs for labor and materials used to complete the repair. All work performed by the successful
bidder during this contract will be authorized using a City Purchase Order.
____________________ ____________________
Compliance Exception
Rev. 08.22.25

Training of City Personnel
Vendor Personnel: Designate and provide Vendor personnel to be responsible for coordinating and
expediting training duties. The person(s) must be present during training coordination meetings
with the City and must be familiar with the Operation and Maintenance (O & M) Manual
information.
____________________ ____________________
Compliance Exception
Manufacturer Representative: Where training of City personnel is required in the Specifications,
Manufacturer Representative must furnish detailed instructions to City personnel for operation and
maintenance of the specified equipment.
____________________ ____________________
Compliance Exception
Training services include pre-startup classroom instruction, post startup classroom instruction, and
onsite equipment instruction, as stated in the specifications.
____________________ ____________________
Compliance Exception
Manufacturer Representative must be familiar with Collections O & M requirements as well as
with the specified equipment.
____________________ ____________________
Compliance Exception
Pre-startup Training: Vendor must coordinate pre-startup training periods with City operating
personnel and Manufacturers' Representatives and furnish O & Manuals.
____________________ ____________________
Compliance Exception
Pre-startup training must be completed at least 14 days prior to actual startup.
____________________ ____________________
Compliance Exception
Rev. 08.22.25

ITEM NUMBER GROUP I - COLOR VIDEO SEWER LINE COMPLIANCE EXCEPTION
INSPECTION SYSTEM
General Requirements
1. The system proposed must be capable of providing color video inspection of pipelines from 4" - 36" in diameter via a self-propelled robotic crawler/transporter.
2. The system must be a wheeled, fully portable unit that utilizes a foldable handle for ease of movement by one (1) person.
3. Vendor must provide a lightweight weather-proof control console that houses the monitor and all system controls.
4. The control console must be capable of multi-angle positioning and be removable for remote operation utilizing up to a 30' cord.
5. Equipment must control for tractor and elevator movement.
6. Vendor must provide a weather-proof main body housing that utilizes a flip down door to expose keyboard.
7. Vendor must provide a "QWERTY" keyboard.
8. The main body must have a flip up door for shade.
9. Vendor must provide a Choice of Power or manual cable drum with a built-in footage counter with <0.5% accuracy.
10. Vendor must provide up to 1000' of cable.
11. Vendor must provide a rear Pendant Controller with all controller functions for remote operation near cable drum.
12. Vendor's final bid price must include transportation/freight costs for delivery of the system to the purchaser's facility.
13. The system must be capable for supporting two (2) tractor sizes. A small straight drive tractor and or a larger steerable tractor and remotely controlled elevator capable of providing color video inspection of pipelines from 4" - 36" in diameter via self-propelled robotic crawler/transporter.
ITEM
NUMBER

Post Startup Training: Where post startup training is required, furnish and coordinate the specified
manufacturers' services and vendor personnel for post startup training of the City operating
personnel within seven (7) days of actual startup.
____________________ ____________________
Compliance Exception
MINIMUM SPECIFICATIONS
ITEM GROUP I - COLOR VIDEO SEWER LINE
NUMBER INSPECTION SYSTEM COMPLIANCE EXCEPTION
General Requirements
1. The system proposed must be capable of providing color
video inspection of pipelines from 4" - 36" in diameter via
a self-propelled robotic crawler/transporter.
2. The system must be a wheeled, fully portable unit that
utilizes a foldable handle for ease of movement by one (1)
person.
3. Vendor must provide a lightweight weather-proof control
console that houses the monitor and all system controls.
4. The control console must be capable of multi-angle
positioning and be removable for remote operation
utilizing up to a 30' cord.
5. Equipment must control for tractor and elevator
movement.
6. Vendor must provide a weather-proof main body housing
that utilizes a flip down door to expose keyboard.
7. Vendor must provide a "QWERTY" keyboard.
8. The main body must have a flip up door for shade.
9. Vendor must provide a Choice of Power or manual cable
drum with a built-in footage counter with <0.5% accuracy.
10. Vendor must provide up to 1000' of cable.
11. Vendor must provide a rear Pendant Controller with all
controller functions for remote operation near cable drum.
12. Vendor's final bid price must include
transportation/freight costs for delivery of the system to the
purchaser's facility.
13. The system must be capable for supporting two (2) tractor
sizes. A small straight drive tractor and or a larger
steerable tractor and remotely controlled elevator capable
of providing color video inspection of pipelines from 4" -
36" in diameter via self-propelled robotic
crawler/transporter.
Rev. 08.22.25

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Southern Bulloch County Wastewater and Septage Receiving Project Bulloch County Board Of... Commissioners ...

State Government of Georgia

Bid Due: 9/01/2026

...27-001-MWA - WATER & WASTEWATER CHEMICALS Macon Water Authority Jul 23, 2026 @ ...

State Government of Georgia

Bid Due: 8/18/2026

...27-001-MWA - WATER AND WASTEWATER CHEMICALS INVITATION TO BID MACON WATER AUTHORITY MACON, ...

Macon Water Authority

Bid Due: 8/18/2026

...Close Wastewater Treatment Pond Sludge Removal Richmond Hill, City Of Aug 11, 2026 ...

State Government of Georgia

Bid Due: 9/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.