| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66799-NONST-2027-000000055 | Town Center Streetscape | Johns Creek, City Of |
Oct 12, 2026 @ 03:55 PM
|
Nov 10, 2026 @ 02:00 PM
|
Start Date: Oct 12, 2026 @ 03:55 PM ET
End Date:
Nov 10, 2026 @ 02:00 PM ET
The Contractor will construct streetscape improvements with on-street parking and pedestrian facilities along Lakefield Drive, construct a new connector road between Johns Creek Parkway and Lakefield Drive, reconstruct the West entrance of City Hall with a raised intersection, install decorative elements, and complete all other miscellaneous items necessary for completion of the work with the City of Johns Creek (City), Georgia.
| Code | Description |
| 21015 | Bricks, Concrete |
| 21028 | Culverts, Concrete |
| 21055 | Paving and Stepping Blocks |
| 74501 | Aggregate, Precoated |
| 74505 | Asphalt, Aggregates |
| 75592 | Thermometers: Pavement and Thermoplastic |
| 80160 | Signs: Construction, Including Roll-Up Type Message Signs |
| 91187 | Storm Drainage |
| 91276 | Striping: Streets, Parking Facilities, Lane Divisions, Paint, etc. |
| 91319 | Construction, Curb and Gutter, Including Maintenance, Repair, and Removal Services |
| 91327 | Construction, Highway and Road |
| 91336 | Construction, Parking Lot and Alley |
| 91339 | Construction, Pipe Culvert |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 91350 | Construction, Streets, Major and Residential, Including Reconstruction |
| 91357 | Construction, Vaulted Sidewalk |
| 91371 | Maintenance and Repair, Highway and Roads, Including Removal of Asphalt, Concrete, Bitumens, etc. |
| 91382 | Maintenance and Repair, Sidewalk and Driveway, Including Removal |
| 91395 | Paving and Resurfacing, Highway and Road |
| 91396 | Paving and Resurfacing, Streets, Major and Residential |
| 92914 | Asphalt Pavers Maintenance and Repair |
| 98852 | Landscaping, Including Design, Fertilizing, Planting, etc., Not Grounds Maintenance or Tree Trimming |
Neil Trust
neil.trust@johnscreekga.gov
678-512-3233
INVITATION TO BID (ITB)
TOWN CENTER STREETSCAPE
(LAKEFIELD DRIVE IMPROVEMENTS)
BID NUMBER #27-314
RECOMMENDED VIRTUAL PRE-BID CONFERENCE
VIA MICROSOFT TEAMS
October 20, 2026, at 3:00 PM ET
Interested attendees must email purchasing@johnscreekga.gov prior to the day before of the meeting (preferably
sooner) with their firm's request to participate in the online Teams Pre-Bid meeting. Please submit, firm name,
email addresses of attendees and a meeting request will be sent to you by the Purchasing Division with a secure
meeting link.
Release of Bid
October 12, 2026
Bid Due Date
November 10, 2026, at 2:00 PM ET
Questions must be asked electronically via BidNet:
Deadline for Questions
November 2, 2026, at 5:00 PM ET
Quotes, bids, and RFPs are electronically managed through the Georgia Purchasing Group by BidNet, our online
bidding/vendor registration system, on the City website: https://www.johnscreekga.gov/Residents/Purchasing. To
access the RFP document you must register with BidNet. Go to the City website above and click the link "register
and view quote/bid/RFP opportunities".
EXHIBIT A - Bid Specifications
PURPOSE, INTENT AND PROJECT DESCRIPTION
The Contractor will construct streetscape improvements with on-street parking and pedestrian facilities
along Lakefield Drive, construct a new connector road between Johns Creek Parkway and Lakefield Drive,
reconstruct the West entrance of City Hall with a raised intersection, install decorative elements, and
complete all other miscellaneous items necessary for completion of the work with the City of Johns Creek
(City), Georgia. This work includes the following project:
TOWN CENTER STREETSCAPE (LAKEFIELD DRIVE IMPROVEMENTS)
All work shall be constructed according to the Construction Plans and is made part of the contract by
reference.
SCOPE OF WORK
The Contractor shall construct the project per:
* Georgia Department of Transportation (GDOT) Specifications, Standards, and Details;
* Applicable City of Johns Creek Specifications and Details;
* The Contract Documents including but not limited to the scope of work and specifications;
* The Plans - drawings/details/notes;
* Purchase Order;
* Approved Schedule;
* City of Johns Creek ordinances and regulations;
* OSHA standards and guidelines;
* Any other applicable codes, laws and regulations including but not limited to Section 45-10-20
through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act,
Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act
of 1990
The contractor will be responsible for providing all labor, materials, and equipment necessary to perform
the work. The contractor will be responsible for constructing all improvements shown on the plans unless
specifically noted otherwise in the specifications/plans.
The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be
issued for differing site conditions. In case of discrepancies between the plans and specifications, the most
stringent prevails.
The successful bidder must have verifiable experience at construction of similar projects in accordance with
these specifications. Bidder shall submit (3) references demonstrating experience completing projects
of similar scope (please include contact email please).
Retainage in the amount of 5% of the total amount due on each monthly invoice will be held by the City
until project completion and acceptance.
The City, directly or through its contracted Construction, Engineering, and Inspection (CE&I) consultant,
will inspect the work as it progresses.
BID QUESTIONS:
All questions related to the project and documents must be asked electronically through BidNet. A response
will be made prior to 72 hours of the Deadline to Submit Bid electronically via BidNet. Contact with City
staff during the solicitation period is forbidden. Offerors may contact the procurement officer for any
clarification on schedule and bid submissions at purchasing@johnscreekga.gov.
PROCUREMENT SCHEDULE:
Bid Release October 12, 2026
Virtual Pre-Bid Meeting October 20, 2026, 3:00 PM ET
Deadline to Submit Questions November 2, 2026, 5:00 PM ET
Deadline to Submit Bid November 10, 2026, 2:00 PM ET
Anticipated Work Session December 7, 2026
Anticipated Council Meeting January 11, 2027
Anticipated NTP January 18, 2027
Anticipated Completion Date 540 Calendar Days from NTP Date
All materials and workmanship associated with this contract shall meet current GDOT Specifications and
Standards for construction materials, methods and procedures. Please refer to the GDOT website for the
most current versions of the Specifications and Special Provisions.
The Contractor shall adhere to the following specifications unless they are not applicable to the
project design scope or noted otherwise in the "Additional Special Provisions and Notifications"
Section of this document.
PROSECUTION AND PROGRESS
The Contractor will have Five-hundred and Forty (540) calendar days from issuance of Notice to Proceed
to be substantially complete with the project. The Contractor will be considered substantially complete
when all contract work except for punch list work has been completed and accepted.
The Contractor will mobilize with sufficient forces such that all construction identified as part of this
contract shall be substantially completed by the completion date indicated above. Upon Notice of Award
the Contractor will be required to submit a Progress Schedule. The Contractor shall be assessed liquidated
damages in the amount of $450.00 per calendar day for any work not completed by the deadline. Liquidated
damages shall be deducted from the 5% retainage held by the City.
The work will require the bidder to provide all labor, administrative forces, equipment, materials and other
incidental items to complete all required work. The City shall perform a Final Inspection upon notification
from the contractor that all work is complete. A Punch List of found deficiencies will be submitted to the
contractor upon completion of the Final Inspection. The Contractor at his expense shall complete all Punch
List work prior to issuance of Final Acceptance. The City will retain 5% of the fee due the Contractor until
the Final Acceptance of work is issued by the City. The retainage will be paid as the final invoice after the
project has been completed and accepted.
The Contractor shall not install lane closures or perform work or move equipment or materials on the
traveled way that interferes with traffic flow between the hours of 6:00 am to 9:00 am and 4:00 pm to 8:00
pm (Monday through Friday) and 9:00 am to 1:00 pm on Sundays if weekend work is permitted.
Normal workday for this project shall be 8:00 AM to 5:00 PM and the normal work week shall be Monday
through Friday. The City will permit extended workdays and work weeks for this project. The contractor
must provide a work plan for these extended times to be approved by the City. No work will be allowed
on City holidays (a complete list can be found on the City's website).
PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges, taxes and fees, and give all notices
necessary and incidental to the due and lawful prosecution of the work. Contractor shall submit Notice of
Intent as primary permittee in order to obtain the appropriate NPDES permit as per plans.
MATERIALS
The Contractor and/or the CE&I firm hired by the City will be responsible for quality control testing of
materials incorporated into the project. All materials will meet appropriate GDOT specifications. Materials
quality control test types will meet GDOT specifications at a frequency equal to or exceeding that set by
those specifications.
The Contractor will be responsible for replacing any work performed with material from rejected sample
lot at no cost to the City.
INVOICING
The Contractor shall invoice monthly for work satisfactorily completed. Invoices need to be sent to the
City's hired CE&I firm and Project Construction Mangers for approval. The Contract Number shall be
listed on all invoices. Appropriate backup documentation shall be provided with each invoice. This backup
must include an Excel spreadsheet showing the original estimated quantity, previous quantities completed,
and quantities completed for that Payment Application.
If Fulton County Water and Sewer Utilities are included in the project, the costs for those items must be
presented as a separate sub-total or separate invoice.
EXISTING CONDITIONS / DEVIATION OF QUANTITIES
All information given in this ITB, shown on the plans and / or included in the supporting documentation
concerning quantities, scope of work, existing GDOT conditions, etc. is for information purposes only. It
is the Contractors responsibility to inspect the project site to verify existing conditions prior to submitting
their bid. No adjustment will be made to the bid for differing site conditions.
The City reserves the right to add, modify, or delete quantities. Contractor will be paid for actual in-place
quantities completed and accepted for pay items listed in the Bid Schedule. Contractor will not be entitled
to an adjustment of unit price on an item which increased or decreased from the original plan quantity. All
other work required by this ITB, plans, specs, standards, etc. but not specifically listed in the Bid Schedule
shall be considered "incidental work". The bidder shall include the cost for all incidental work in their
lump sum bid for Grading Complete. No adjustment will be made to the bid based on missing or inaccurate
information.
No payment will be made for additional work without prior written approval from the City. At no time
will Contractor proceed with work outside the prescribed scope of services for which additional payment
will be requested without the written authorization of the City.
UTILITIES
Contractor shall be responsible for protecting all utilities and for coordinating any utility relocation
necessary for the completion of the work.
All known utility facilities are shown schematically on highway plans and are not necessarily accurate in
location as to plan or elevation. Utility facilities such as service lines or unknown facilities not shown on
plans will not relieve the contractor of their responsibility under this requirement. "Existing utility facilities"
means any utility that exists on the project in its original, relocated or newly installed position.
WATER AND SEWER REPLACEMENTS
Unless otherwise noted in the plan set, the contractor shall be responsible for adjusting to grade and/or
replacing all existing Fulton County owned water and sewer structures that are impacted by the proposed
project including, but not limited to, those shown on the 44-Series Plan Sheets.
Fulton County Technical Specifications shall be used for all adjustments and replacements of water and
sewer facilities. Contractor or sub-contractor shall be on the Fulton County approved contractor list in
order to complete this work.
All pipe fittings and accessories shall be included with the pipe (LF) price. No extra payment for traffic
control and grading will be made. Those costs shall be included in the price bid for pipe installation.
TRAFFIC CONTROL
The Contractor shall, at all times, conduct his work as to assure the least possible obstruction to the citizens.
Work staging and operations shall be conducted in a manner to minimize interference with traffic flow thru
existing parking areas. The safety and convenience of the general public and the protection of persons and
property shall be provided for by the Contractor as specified in the State of Georgia, Department of
Transportation Standard Specifications Sections 104.05, 107.09 and 150.
The Contractor shall furnish, install and maintain all necessary and required barricades, signs and other
traffic control devices in accordance with MUTCD and DOT specifications. Contractor shall take all
necessary precautions for the protection of the workers and safety of the public.
All existing signs, markers and other traffic control devices removed or damaged during construction
operations will be reinstalled or replaced at the Contractors expense. At no time will Contractor remove
regulatory signing which may cause a hazard to the public. The Contractor shall, within 24 hours of paving
place temporary pavement markings (paint or removable tape) to match intended pavement markings of the
construction stage. No additional payment will be made for this work.
Traffic whose origin and destination is within the limits of the project shall be provided ingress and egress
at all times unless otherwise approved by the City. The ingress and egress includes entrances and exits via
driveways at various properties, and access to the intersecting roads and streets. The Contractor shall
maintain sufficient personnel and equipment (including flaggers and traffic control signing) on the project
at all times, particularly during inclement weather, to insure that ingress and egress are safely provided
when and where needed.
Two-way traffic shall be maintained at all times, utilizing certified flaggers as necessary, unless otherwise
specified or approved by the City. In the event of an emergency situation, the Contractor shall provide
access to emergency vehicles and/or emergency personnel through or around the construction area.
All personnel, equipment, and materials required for installing and maintaining traffic control shall be the
responsibility of the contractor.
Mandatory: Contractor shall furnish copies of traffic control certifications and a headshot photo of
all personnel providing traffic control services during project. This requirement shall be furnished
to the City at the project kick-off meeting.
Additional restrictions apply to Signal Work - See "Signal Installations/Upgrades" Section below.
PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE
The Contractor shall be responsible for the preservation of all public and private property including, but not
limited to, crops, fish ponds, trees, monuments, irrigation, mailboxes, highway signs and markers, fences,
landscaping, grassed and sodded areas, etc. along and adjacent to the highway, road or street, and shall use
every precaution necessary to prevent damage or injury thereto, unless the removal, alteration, or
destruction of such property is provided for under the contract.
When or where any direct or indirect damage or injury is done to public or private property by or on account
of any act, omission, neglect or misconduct in the execution of the work, or in consequence of the non-
execution thereof by the Contractor, he shall restore, at his/her own expense, such property to a condition
similar or equal to that existing before such damage or injury was done, by repairing, rebuilding or otherwise
restoring as may be directed, or she/he shall make good such damage or injury in an acceptable manner.
The Contractor shall notify the City after damage occurs in a timely manner and coordinate with the City
to determine how quickly repairs shall be made on a case-by-case basis based on the safety, utility, and cost
of the resulting damage. No retainage shall be released to the Contractor prior to correction of any damages.
Contractor will be responsible for ensuring adjacent parcel owners have access to their mailboxes. This
includes relocating mailboxes temporarily and/or permanently, if necessary, at no additional cost to the
City.
SURVEY
The Contractor will be responsible for all staking necessary to complete construction activities. All survey
equipment, stakes and other materials needed, will be considered incidental to construction operations and
no additional compensation will be provided. Electronic CAD files will be available to the winning bidder
for information purposes only.
ESTABLISHING SURVEY CONTROL
The Contractor shall coordinate with the City of Johns Creek to reestablish and/or verify survey control
prior to conducting any work activities for all highway projects greater than 500' in length or with a
construction contract value greater than $250,000.
RIGHTS AND USE OF MATERIAL
Materials excavated within the project limits become the property of the Contractor. The Contractor, at
his/her discretion, may elect to incorporate any of the excavated material into his/her work provided and
that it is suitable for the intended use. Materials identified to be removed and are unsuitable for the project
will be removed from the site by the Contractor. All excavation, placement, hauling and grading of on-site
material will be the Contractors responsibility.
GRADING COMPLETE
The Contractor shall be responsible for all grading work including all clearing, grubbing, hauling, grading,
excavation, backfilling, and compaction tasks associated with the work. In addition to the above listed tasks,
any costs associated with providing borrow material from a location not within the project limits will be the
responsibility of the Contractor. Sub-grade excavation to required elevations, removal of excavated material
if necessary, sub-grade compaction, fine grading, and back-filling excavated area with suitable material will
be the responsibility of the Contractor. Also included in this work will be the removal and hauling off of
existing construction materials, trees and any other items necessary to complete the work.
Finished grade of disturbed areas will match and blend with the elevation, context, and material type of
existing adjacent areas not disturbed by construction operations.
The Contractor is also responsible for maintaining drainage throughout the contract. This includes, but is
not limited to any ditch grading and/or temporary pipes required to accomplish this.
The costs of any required shoring required to construct stormwater pipes within the provided right of way
and/or easements at the depth shown in the plans shall be included in the cost of Grading Complete.
Tree save fence shall be installed and maintained by the contractor as indicated on the plans.
The bidder shall include the cost for all such work in the "Grading Complete" bid item.
TREE PRESERVATION
The City desires to preserve as many specimen trees as possible within these projects. This means that trees
are only to be removed if their trunks or a significant amount of their root system are within the limits of
construction and/or will be impacted by other ancillary activities required during construction such as utility
relocation.
For projects involving a trail or sidewalk, the City seeks opportunities to meander those features around
existing trees if possible.
Prior to any clearing activities, the Contractor shall meet with the City's assigned Construction Manager in
the field and mark the trees outside of the limits of construction that shall be preserved. Prior to this meeting
the Contractor shall have staked the easements and construction limits.
In addition to construction limits, factors such as agreed upon right of way stipulations and impacts due to
utility relocations should also be considered when determining whether or not a tree can be preserved.
If indicated on the plans, tree save fence shall be installed and maintained by the contractor as indicated on
the plans.
The bidder shall include the cost for all such work in the "Grading Complete" bid item.
EROSION/SEDIMENT CONTROL
It is the responsibility of the Contractor to follow all Federal, State and Local erosion and sediment control
laws and specifications. This includes meeting all NPDES guidelines, obtaining any required permits, and
submitting the Notice of Intent as needed to meet these guidelines
Erosion/Sediment Control measures shall be installed and maintained by the Contractor throughout the
duration of the project. The Contractor is responsible for the removal and disposal, off project site, all
installed temporary erosion/sediment control measures when affected areas have been restored to a level
where vegetative coverings will minimize erosion.
The Contractor shall coordinate with the City to have the 7-Day Inspection performed by the engineer.
Contractor shall install and maintain erosion control BMP's per the plans unless directed otherwise by the
City.
GRASSING
Contractor will be responsible for temporary and permanent grassing all disturbed areas. This work shall
consist of ground preparation, furnishing and planting, seeding (including the cost of the seed), fertilizing,
sprigging, mulching and watering of all areas disturbed due to construction operations. This work will
comply with GDOT Section 700 - "Grassing". Finished grade of disturbed areas will match and blend with
adjacent areas not disturbed by construction operations. The type of grass to be used shall match the
established grass on the adjacent property or as noted on any Right of Way Plans or property stipulations.
In the event that areas are damaged prior to final project acceptance, the Contractor will repair or replace
as necessary.
CITY FIBER
They City owns and maintains a traffic fiber network.
The Contractor is responsible for relocating and/or installing any fiber shown on the plans.
COORDINATION
The Contractor shall keep the City updated on the construction schedule, daily work plans and any
challenges, setbacks in a timely manner. The Contractor shall provide advance notice to the City for
activities that are expected to required lane or road closures, impact access to/from a driveway, and/or
impact school-related activities.
Once Notice to Proceed has been provided, the Contractor shall establish a work schedule that includes, but
not limited to clearing/grubbing, utility relocations, paving, and/or concrete work.
An updated schedule shall be included with each payment application/invoice.
PREPARATION OF SUBGRADE
This work shall consist of constructing the sub-grade such that the finished line and grade will conform to
the line and grade as shown on the plan or as directed by City staff. The subgrade will be compacted to a
degree such that no noticeable deflection is apparent. Removal of unsuitable material and replacement with
suitable material is the responsibility of the Contractor. The City staff will verify line, grade, and
compaction prior to placement of any materials. Contractor will not proceed with placement of materials
without authorization by City staff.
CONCRETE SIDEWALK
The Contractor shall construct 4" and/or 6" depth Portland Cement Concrete sidewalks as stated in the
plans, in accordance with the typical section.
Where space does not allow for a two-foot setback or where immovable objects restrict the width or location
of the sidewalk, the contractor shall seek approval by the City prior to making adjustments in regard to the
sidewalk width and/or location. Curb cut ramps shall be located at all intersections and driveways in
accordance with GDOT and ADA requirements.
In addition, ADA compliant detectable warning surfaces shall be used at the toe of the ramps. Curb cut
ramps and detectable warning surfaces are incidental to the cost for the Portland cement concrete sidewalks.
The detectable warning surfaces shall be the yellow fiberglass insert type and shall be at a minimum 2' x 4'
in size. The detectable warning surfaces shall be considered incidental and no separate payment will be
made. Also, the proposed sidewalk shall tie to the existing driveways in accordance with GDOT and ADA
requirements. ADA ramps will be paid for at the contract unit price per SDY for sidewalk.
This work shall consist of supplying, transporting, forming, placing, finishing, and curing Portland
Cement Concrete as sidewalks at locations specified in this ITB. Concrete shall conform to the minimum
requirements for Class "B" as specified by GDOT. Concrete shall be placed only when the air
temperature is 40 degrees Fahrenheit and rising. Concrete will be protected from freezing for the first 24
hours. Appropriate levels of care will be employed by contractor to restrict public access to uncured
concrete. Concrete will be broom finished, edged, and jointed.
Concrete sidewalk construction will be performed in accordance with current GDOT specifications.
Wherever sidewalks meander from the adjacent roadway, the contractor shall ensure that they follow all
ADA guidelines, including, but not limited to the maximum grade requirement of 5%, and ensure that
positive drainage flow is achieve. For any such locations of meandering sidewalks, it is the intent of the
City to minimize tree removal, impacts to existing features, and/or required grading while meeting ADA
requirements. Prior to tree removal and construction activities within such sections of the sidewalk, the
contractor shall coordinate in the field with COJC as needed to establish a final trail and grading plan. This
coordination process will establish which trees will be permitted to be removed for the project.
CONCRETE CURB AND GUTTER
The curb and gutter shall be installed in a manner to provide a uniform, standard curb and gutter section. It
shall be installed to provide a straight and consistent-width gutter. It shall tie in to any surrounding existing
curb and gutter in a smooth manner, without kinks.
Where the existing asphalt edge is not smooth, the Contractor shall saw cut the existing edge of pavement
prior to forming and pouring the concrete. This work is incidental and no separate payment will be made
to saw-cut the asphalt.
The concrete for the specified curb and gutter shall be formed to the standard width specified in the plans.
Should a gap between the asphalt and the newly formed curb and gutter exist due to saw-cutting and/or
existing conditions, the following procedures shall be followed:
Case 1 - Full Depth or Mill/Overlay Projects: For projects that involve asphalt/lane work, follow detail
for Class "B" Concrete Widening
Case 2 - No Asphalt Work: For projects that do not include asphalt/lane work, the Contractor shall fill
in the gap up to the existing surface course using concrete that has been dyed black.
Payment for this concrete will be made using 999-9999 GAP CONCRETE - BLACK (CY).
HANDRAIL INSTALLATION
The contractor shall install handrails as noted in the plans. The contractor will be responsible for providing
all labor, materials, and equipment necessary to perform the work.
Handrails shall be installed according to the Johns Creek Handrail Detail.
Contractor must receive approval from the City project contact prior to purchase and installation.

With GovernmentContracts, you can:
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 48400-eRFQ-002180-2027
State Government of Georgia
Bid Due: 12/02/2026
Bid Number: #66812-27-0005 Bid Title: ITB - Demolition and Remediation of Former Boys
Douglas city
Bid Due: 11/17/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 48400-eRFQ-002181-2027
State Government of Georgia
Bid Due: 12/02/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 41400-eRFP-001976-2027
State Government of Georgia
Bid Due: 12/04/2026