| Location: | Utah |
|---|---|
| Posted: | Sep 20, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | JBID973 |
| Publication URL: | To access bid details, please log in. |
Project Description: Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project.
This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 10-inch and 18‑inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch‑diameter steel casing with carrier pipe beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter lined sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.

With GovernmentContracts, you can:
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026