| Location: | Utah |
|---|---|
| Posted: | Sep 20, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | JBID973 |
| Publication URL: | To access bid details, please log in. |
Project Description: Only those contractors that were prequalified for the Multiple Mountain View Corridor Sewer Projects may bid on this project.
This project includes installation of a gravity sanitary sewer with a trenchless crossing beneath SR‑85 (Mountain View Corridor) within UDOT Region 2 right‑of‑way. The Work includes, but is not limited to, installation of 10-inch and 18‑inch PVC gravity sanitary sewer pipe; trenchless installation of a 36‑inch‑diameter steel casing with carrier pipe beneath Mountain View Corridor (State Route 85); excavation, construction, and backfilling of launch, retrieval, and intermediate shafts; installation of new 60‑inch‑diameter lined sanitary sewer manholes; connection to the existing sanitary sewer system; abandonment and removal of existing sewer infrastructure; surface restoration, including pavement, curb and gutter, sidewalk, and striping; traffic control within UDOT right‑of‑way; sanitary sewer bypass pumping as required; and all related appurtenances and incidental work necessary to complete the Project in accordance with the Contract Documents.

With GovernmentContracts, you can:
...linear feet of 30-inch sanitary sewer pipeline, 10 sanitary sewer manholes, 225-foot-long guided ...
State Government of Utah
Bid Due: 11/10/2026
...Corridor Sewer Projects may bid on this project. This project includes installation of ...
State Government of Utah
Bid Due: 11/10/2026
...in a clean, sanitary, professional, and presentable condition. It is anticipated that this ...
State Government of Utah
Bid Due: 10/25/2026