RFP for General Contractor ? Preconstruction & Construction Services

Location: California
Posted: Oct 16, 2026
Due: Nov 18, 2026
Agency: City of San Buenaventura
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
RFP for General Contractor – Preconstruction & Construction Services

Attachment Preview

PA ST EUR COURT A PA RT M EN TS
33-Unit Affordable & Supportive Housing
5832 Valentine Road, Ventura, California 93003
APNs 138-0-042-115 and 138-0-042-125

REQUES T FOR P ROP OS A LS & QUA LIFICA T IONS
GE NE RA L CO NT RA CT O R
Preconstruction & Construction Services
PA ST EUR COURT A PA RT M EN TS
33-Unit Affordable & Supportive Housing
5832 Valentine Road, Ventura, California 93003
APNs 138-0-042-115 and 138-0-042-125
Issued by Ventura Housing on behalf of Pasteur Court LP. Pasteur Court LP, a California limited
partnership. The managing general partner is Pasteur Court LLC, whose sole member is
Homecomings, Inc., a nonprofit corporation wholly controlled by Ventura Housing.
RFP Issued: Friday, October 16, 2026
P ROP OSA LS D U E
Wednesday, November 18, 2026 * 2:00 PM (Pacific)
MAIN OFFICE 995 Riverside Street, Ventura, CA 93001 * 805.648.5008 (English/Espanol) * venturahousing.org
TDD/TDY English 800.735.2929 * Espanol 800.855.3000 * Equal Housing Opportunity

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
TA BL E O F C O N TEN T S
1. PURPOSE
2. INTRODUCTION & BACKGROUND
3. PROJECT DETAILS
4. RFP SCHEDULE
5. PROPOSAL CONTENTS & FORMAT
6. FORM OF AGREEMENT
7. BONDING & INSURANCE
8. EVALUATION & SELECTION
9. SUBMISSION INSTRUCTIONS
10. EXHIBITS
11. RFP TERMS & CONDITIONS
Attachment 1 SUBMISSION CHECKLIST
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 2 OF 13

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
1. P U RP O SE
Pasteur Court LP (the "Owner"), through its developer and affiliate Ventura Housing (formerly the
Housing Authority of the City of San Buenaventura, "HACSB"), is issuing this Request for Proposals
& Qualifications ("RFP") to select a qualified General Contractor ("Contractor") to provide
preconstruction and construction services for the Pasteur Court Apartments (the "Project"), a new
33-unit affordable and supportive housing community in the City of Ventura, California.
Responses will be used to evaluate the qualifications, approach, and cost proposals of interested
firms and to select one firm to negotiate an Owner-Contractor Agreement based on the Cost of
the Work Plus a Fee with a Guaranteed Maximum Price ("GMP"), administered on a 100% open-
book basis.
2. I N TRO DU C TI O N & B AC K G RO U N D
Ventura Housing is developing a new 33-unit affordable housing community at 5832 Valentine
Road, Ventura, adjacent to its recently completed 5818 Valentine Road project. The site was
originally planned as a restaurant pad for the former La Quinta Inn but was never developed
beyond a driveway and surface parking lot. The Project will serve 15 households experiencing
homelessness (encampment residents) and 17 low-income households at 30-60% of Area Median
Income (AMI), plus one manager's unit.
The Project will be owned by Pasteur Court LP, a California limited partnership. The managing
general partner is Pasteur Court LLC, whose sole member is Homecomings, Inc., a nonprofit
corporation wholly controlled by Ventura Housing. The construction contract will be between the
Contractor and Pasteur Court LP.
The Project is designed to meet California Tax Credit Allocation Committee (TCAC) requirements,
including TCAC sustainability, energy efficiency, and cost-limitation requirements.
3. P RO JEC T DET AI L S
A. Site and Project Description
* Approximately 0.60-acre infill site; General Commercial (C-2) zone; 2050 General Plan land
use designation Mixed Use 6.
* One three-story, U-shaped residential building with elevator, organized around a central
courtyard; each unit has a private balcony or patio.
* Unit mix: 30 one-bedroom units (approx. 492 sf) and 3 two-bedroom units (approx. 745-
749 sf), including one manager's unit.
* Common areas of approximately 2,838 sf, including a 756-sf community room, lobby,
property management office, and two supportive services offices (case management and
flex).
* Common laundry facility.
* Approximately 1,287-sf rooftop deck above the community room.
* 24 surface parking spaces, including EV charging stations.
* Site layout provides a connection to the adjacent, occupied Valentine Road Apartments
affordable housing community.
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 3 OF 13

Role Organization
Managing General Partner Pasteur Court LLC (sole member: Homecomings, Inc.)
Owner's Representative / S.L. Leonard & Associates, Inc.
Construction Manager
Geotechnical Engineer Earth Systems

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
* Accessibility: at least 15% of units fully accessible (mobility); all units adaptable.
* Sustainability: solar PV targeting 100% energy offset, CALGreen compliance, Green Point
Gold Rating? EV charging, and Dark Sky-compliant site lighting.
B. Owner and Design Team
Role Organization
Owner Pasteur Court LP
Managing General Partner Pasteur Court LLC (sole member: Homecomings, Inc.)
Developer Ventura Housing
Owner's Representative / S.L. Leonard & Associates, Inc.
Construction Manager
Architect DiCecco Architecture, Inc. (Mark DiCecco Architect)
Geotechnical Engineer Earth Systems
Civil, Structural, MEP, Landscape, ECG, RGSE, Consulting West, PCLD, Partner Energy
Title 24 & other consultants
C. Entitlements, Schedule and Financing
The Project received Director's Permit approval on March 18, 2026, as a ministerial, by-right
approval under the Supportive Housing Act (AB 2162), and is exempt from CEQA review as an infill
project. Construction documents were submitted for first plan check on July 16, 2026.
Construction is anticipated to begin in March 2027, contingent on an award of 9% Low-Income
Housing Tax Credits (2026 Second Round), with an estimated 22-month construction duration
and completion by February 2029. All 33 units will be completed and delivered simultaneously.
Proposers should note that 9% tax credit projects are subject to strict TCAC readiness deadlines
for the start of construction; schedule reliability will be weighed accordingly.
Project financing includes City of Ventura Encampment Resolution Funding (ERF), City and
County of Ventura HOME-ARP funds, a construction loan, 9% LIHTC equity, and eight (8) Project-
Based Vouchers for operations.
D. Special Conditions and Programmatic Requirements
1. Labor Standards
Ventura Housing has determined that there is no obligation to pay State prevailing wages or
federal Davis-Bacon wages on this Project. Proposers shall nonetheless list any master labor
agreements or other agreements with construction trade groups to which the firm is signatory or
with which it traditionally complies.
2. Federal Funding Requirements
Because the Project includes federal HOME-ARP funds, the Contractor and its subcontractors
must comply with the federal requirements flowed down through the City and County HOME-
ARP agreements, which are expected to include [Section 3 (24 CFR Part 75) hiring and contracting
goals and reporting; equal opportunity and affirmative steps for minority- and women-owned
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 4 OF 13

Milestone Date
Email confirmation of intent to submit Wednesday, October 28, 2026
Deadline for Requests for Information (RFIs) Wednesday, November 4, 2026, 12:00
PM
PROPOSALS DUE Wednesday, November 18, 2026, 2:00
PM (Pacific)
Notice of selection Wednesday, December 16, 2026

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
businesses; and verification that the Contractor and subcontractors are not suspended or
debarred (SAM.gov) - confirm with City/County].
3. Sustainability
The Contractor will be responsible for constructing the Project in accordance with the CALGreen
Building Code, TCAC sustainable building requirements, the solar PV system design (targeting
100% energy offset), EV charging requirements, and Dark Sky lighting requirements, and for
providing all documentation needed for TCAC and utility verification.
4. Site Safety, Staging and Neighbor Impacts
The site is adjacent to the occupied Valentine Road Apartments, which houses formerly homeless
and low-income residents, and to Pasteur Drive. Special attention is required to maintain safe
access, minimize disruption, and secure the site at all times. Proposals must describe the
construction sequence, staging, traffic, and pedestrian safety plan and the approach to after-
hours site security.
4. R FP SC H E DU L E
The following dates are anticipated and subject to change by addendum:
Milestone Date
RFP issued Friday, October 16, 2026
Email confirmation of intent to submit Wednesday, October 28, 2026
Pre-proposal site walk Thursday, October 22, 2026, 10:00 AM -
at site location
Deadline for Requests for Information (RFIs) Wednesday, November 4, 2026, 12:00
PM
Final addendum / RFI responses issued Monday, November 9, 2026
PROPOSALS DUE Wednesday, November 18, 2026, 2:00
PM (Pacific)
Virtual interviews (short-listed firms) Wednesday, December 2, 2026
Notice of selection Wednesday, December 16, 2026
Anticipated construction start date (9% LIHTC award) March 2027
5. P RO P O S AL C O N TEN T S & FO R MA T
Proposals shall be concise and organized using the tabs below. Responses that do not follow this
format may be considered non-responsive.
Tab 1 - Cover Letter
Signed by an officer authorized to bind the firm, including acknowledgment of all addenda;
acknowledgment that the firm has reviewed and accepts all exhibits (or has noted exceptions in
Tab 14); the name and contact information of the firm's primary contact; and confirmation that
the proposal will remain valid for ninety (90) days from the proposal due date.
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 5 OF 13

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
Tab 2 - Contractor's Qualification Statement
a. A completed AIA Document A305, Contractor's Qualification Statement.
b. California Contractors State License Board (CSLB) Class B license number, classification(s),
and status.
c. Company profile: years in business, ownership, principals, and number of employees by
office.
Tab 3 - Firm Organization and Proposed Project Team
a. Company organization chart and a Project-specific chain-of-command chart.
b. Resumes for key staff, including the proposed Project Executive, Project Manager,
Superintendent, Preconstruction Manager/Estimator, and Scheduler.
c. Percentage of time each key staff member will be assigned to the Project (preconstruction
and construction phases) and hourly rates.
d. Description of the team organization for both the preconstruction and construction
phases.
e. Commitment that key staff will not be replaced without Owner approval.
Tab 4 - Relevant Experience
List five (5) recent projects of comparable type, size, and complexity, completed within the last
seven (7) years. Affordable multifamily, permanent supportive housing, and tax credit-financed
projects are of particular interest. For each project provide:
a. Description of scope and contract type (e.g., GMP, lump sum).
b. Location, number of units, and gross square footage.
c. Financing type (e.g., 9% / 4% LIHTC, HOME, state funds).
d. Owner's name, contact person, telephone, and email.
e. Architect's name, contact person, telephone, and email.
f. Original and final contract amount; construction cost per gross square foot; and total
change orders as a percentage of the original contract.
g. Original planned contract completion time and actual completion time (explain any
delay).
h. Photographs (optional).
Also provide a list of currently contracted work and backlog, including size, contract value, and
anticipated completion of each project.
Tab 5 - Financial Capacity and Bonding
a. Annual construction volume for each of the past three (3) years.
b. Audited or reviewed financial statements for the past two (2) years (may be submitted
confidentially - see Section 9).
c. Letter from surety confirming single-project and aggregate bonding capacity, bonding
rate, and surety's A.M. Best rating.
d. Disclosure of any pending or outstanding financial claims, liens, or lawsuits against the
firm.
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 6 OF 13

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
Tab 6 - Safety and Legal Record
a. Current Experience Modification Rate (EMR) and EMRs for the past three (3) years.
b. OSHA 300A logs (or equivalent) for the past three (3) years and description of any citations.
c. Description of the firm's site safety program, including approach for an infill site adjacent
to occupied housing.
d. List of lawsuits, claims, and arbitrations (settled and unsettled) for the past five (5) years.
e. Self-certification that the firm is not currently debarred, suspended, or otherwise
disqualified by any federal, state, or local public agency.
Tab 7 - Insurance and OCIP
Confirm the firm's ability to meet the insurance requirements in Exhibit B, and provide current
insurance carriers, limits, and rates. Ventura Housing is considering an Owner Controlled
Insurance Program (OCIP). Describe your experience with OCIP/wrap-up programs and your
process for ensuring proper insurance credits and full subcontractor enrollment.
Tab 8 - Preliminary Construction Schedule
a. A preliminary construction schedule based on Exhibit A documents, assuming a Notice to
Proceed of March 1, 2027, and an estimated 22-month duration. Identify critical path
activities, long-lead items (e.g., elevator, switchgear/transformer, solar PV, windows), and
utility (SCE) coordination.
b. Scheduling software used and the name of the proposed scheduler.
c. Identify any work that may require early release before execution of the GMP agreement,
with reason and an itemized cost for each.
Tab 9 - Preliminary GMP and Cost Proposal
Provide a preliminary GMP for all of the Work shown in Exhibit A documents, including all direct
and indirect costs necessary for successful completion of the Project, with a detailed line-item
breakdown by CSI division. The cost proposal shall include:
a. Contractor's Fee - a fee percentage applied to the Cost of the Work for home office
overhead and profit, also stated as a dollar amount.
b. General Conditions and General Requirements (GC/GR) - presented on the Exhibit C
template and tied to the proposed schedule duration. GC/GR must include, but is not
limited to: project supervision; project management; office overhead directly associated
with the Project; temporary facilities (trash, water, fencing, power, sanitation, field office,
equipment rental, IT hardware and software, etc.); site security, including after-hours, as
recommended by the proposer; insurance costs; clean-up and safety labor; and all other
items generally accepted in the construction industry as GC/GR.
c. TCAC cost limitation - Contractor profit, overhead, and general requirements combined
shall not exceed fourteen percent (14%) of the cost of construction, consistent with TCAC
regulations. Show the calculation.
d. Change order markups - (a) the proposed markup to be applied to additive and
deductive changes in the scope of work, inclusive of GC/GR (changes that demonstrably
affect GC/GR, such as time extensions, will be negotiated case by case, using a weekly GC
rate prorated for daily changes); and (b) proposed allowable subcontractor markups for
additive and deductive change orders.
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 7 OF 13

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
e. Contractor's Contingency - the proposed percentage of the Cost of the Work to be
carried as Contractor's Contingency within the GMP.
f. Bond premium - rate and estimated cost for 100% Performance and Payment Bonds.
g. Allowances - list and value of any proposed allowances.
h. Qualifications and exclusions - a detailed list of assumptions, qualifications, and
exclusions used to develop the GMP.
i. Permits and fees - Owner will pay plan check, building permit, and utility
connection/impact fees directly; Contractor shall carry miscellaneous permits (e.g.,
encroachment, haul route, temporary power)
j. Value engineering - potential cost-saving opportunities or substitutions may be listed
separately. Under no circumstances shall they be incorporated into the preliminary GMP.
k. Preconstruction services - provide a separate preconstruction fee if any for anticipated
value engineering, constructability reviews, and cost updates for plan check corrections.
Proposers may add or delete line items on the provided templates but must highlight and explain
each modification. Prior to execution of the GMP agreement, the selected Contractor will be
required to submit subcontractor bids substantiating the GMP, with a minimum of three (3) bids
for each major trade where reasonably available.
Tab 10 - Self-Performed Work
Identify any scope proposed to be self-performed. Self-performed work for trades such as
underground utilities, earthwork, concrete, and framing shall be treated as fixed stipulated sums
and shall be ineligible for transfers to or from line-item savings or Contractor's Contingency. Any
scope changes affecting self-performed trades shall be addressed through Change Order
Requests prior to the work being put in place. Self-performed trades identified as fixed stipulated
sums shall be excluded from audit solely as to the underlying cost composition of such stipulated
sum. Miscellaneous labor for clean-up and safety shall be carried in GC/GR.
Tab 11 - Cost Management and Project Controls
a. Confirm experience with, and willingness to administer, the Project on a 100% open-book
basis, with all project-related cost records available to the Owner, its Owner's
Representative, lenders, and tax credit investor.
b. Describe your process for tracking line-item transfers, Contractor's Contingency, and
allowances to ensure transparency and clear communication.
c. Describe your change management process, including review of Change Order Requests
and response times.
d. Describe constructability review and RFI procedures during preconstruction.
e. Describe your subcontractor prequalification and selection process.
f. Confirm the ability to support lender and investor draw requirements and the TCAC final
cost certification, including providing a contractor's cost certification and audit support.
g. Construction administration platform used (e.g., Procore). Architect prefers Procore but
not a requirement.
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 8 OF 13

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
Tab 12 - Contractor Concerns and Alternative Methods
a. Describe specific major areas of concern or high risk with respect to the successful
completion of the Project (e.g., site conditions, utilities, schedule, market conditions).
b. List any potential cost-saving opportunities or alternative methods, if any.
Tab 13 - Section 3, Local Hiring and Subcontractor Outreach
Describe the firm's experience meeting Section 3 requirements, outreach to local and
disadvantaged, minority-, and women-owned subcontractors in Ventura County, and
partnerships with workforce training organizations. Describe the specific outreach plan proposed
for this Project.
Tab 14 - Comments on Form of Agreement
Identify any exceptions to, or requested modifications of, the documents in Exhibit D. Requests for
modification will not be considered after the RFP process concludes.
6 . FO R M O F AG RE EM EN T
The Owner intends to enter into a Cost of the Work Plus a Fee with a Guaranteed Maximum Price
contract using modified versions of the following (Exhibit D):
* AIA Document A102-2017, Standard Form of Agreement Between Owner and Contractor
where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed
Maximum Price; and
* AIA Document A201-2017, General Conditions of the Contract for Construction.
The agreement will be subject to review and approval by the Owner's construction lender, tax
credit investor, and public funders, and may be amended to incorporate their requirements. Final
contract terms are subject to negotiation with the selected Contractor.
7 . BO N DI N G & I N SU R AN C E
Bonds. The Contractor shall provide Performance and Payment Bonds, each in the amount of
100% of the contract sum, issued by a California-admitted surety acceptable to the Owner and its
lenders.
Insurance. The Contractor shall carry, at its own expense, at least the types and amounts of
insurance set forth in Exhibit B. Builder's risk insurance will be obtained by the Owner. If an OCIP
is implemented, the Contractor will provide its own off-site and excluded-coverage insurance and
will provide an insurance credit for enrolled coverages.
The following entities shall be named as additional insureds: Pasteur Court LP; Pasteur Court LLC;
Homecomings, Inc.; Ventura Housing; S.L. Leonard & Associates, Inc.; There might also be a need
to include the City of Ventura, the County of Ventura, the construction lender, and tax credit
investor, as required.
8. E VAL U ATI O N & SEL EC T I O N
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 9 OF 13

Criterion Maximum Points
2. Proposed project team - experience and availability 20
4. Proposed GMP Estimate 10
6. Cost of doing business (fee, GC/GR, insurance, bonds, markups, 5
contingency)
8. Safety and legal record 5

PASTEUR COURT | RFP FOR GENERAL CONTRACTOR SERVICES
Proposals will be evaluated on the following criteria. Ventura Housing may invite one or more
firms to participate in virtual interviews before making a final selection.
Criterion Maximum Points
1. Firm capacity (financial strength, bonding, backlog) 20
2. Proposed project team - experience and availability 20
3. Experience and past performance on comparable projects 25
4. Proposed GMP Estimate 10
5. Contract administration and project controls 5
6. Cost of doing business (fee, GC/GR, insurance, bonds, markups, 5
contingency)
7. Special conditions experience - Section 3 and local outreach, 10
supportive / tax credit housing, and safety programs for infill sites
adjacent to occupied housing
8. Safety and legal record 5
Total 100
Following selection, the Owner intends to negotiate the final GMP, schedule, and contract terms
with the selected firm. If agreement cannot be reached, the Owner may begin negotiations with
the next-ranked firm.
9 . SU B MI S SI O N I N STRU C TI O N S
a. Intent to submit. Confirm by email no later than Wednesday, October 22, 2026, your
intent to submit a proposal.
b. Electronic submission. Submit one (1) PDF of the complete proposal no later than
Wednesday, November 18, 2026 at 2:00 PM (Pacific) to: Marco Valencia. PDF proposals to
be submitted by email to: Marco Valencia (mvalencia@venturahousing.org), Mike
Iwuchukwu (mike@slleonard.com), Sean Leonard (sll@slleonard.com), and Sandy Sanchez
(ssanchez@venturahousing.org).
c. Hard copy. Deliver one (1) hard copy by the same deadline to: Ventura Housing, 995
Riverside Street, Ventura, CA 93001, Attn: Marco Valencia.
d. Financial statements. Financial statements may be emailed separately and confidentially
to Karen Flock (kflock@venturahousing.org).
e. Questions / RFIs. Submit all questions in writing to Mike Iwuchukwu
(mike@slleonard.com), with copies to Marco Valencia (mvalencia@venturahousing.org)
and Mark DiCecco (mark@diceccoarch.com), no later than 12:00 PM on Wednesday,
November 4, 2026. Responses will be issued to all proposers by addendum. No oral
interpretation will be binding.
f. Communications. From the issue date until notice of selection, proposers shall not
contact Ventura Housing Board members or staff regarding this RFP other than the
contacts listed above.
g. Late proposals will not be accepted.
VENTURA HOUSING * 995 Riverside Street, Ventura, CA 93001 * PAGE 10 OF 13

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...of General Contractors to Bid on the PSTC Fire Tower Project) Issue Date ...

Santa Rosa Junior College

Bid Due: 12/03/2026

...Project ID: 2026-RFP-019 Title: GENERAL CONTRACTOR PRE-QUALIFICATION PACKAGE TUSTIN POLICE... GENERAL CONTRACTOR PRE-QUALIFICATION ...

City of Tustin

Bid Due: 12/22/2026

...District will, as appropriate, provide a list of prequalified general contractors and subcontractors..., ...

West Contra Costa Unified School District

Bid Due: 12/31/2026

...interested and qualified general contractors (Respondents) to provide Design-Build (DB), Collaborative (Progressive) Design-Build ...

State Government of California

Bid Due: 11/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.