| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 11, 2025 |
| Due: | Sep 24, 2025 |
| Agency: | The Enterprise Center |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project: The Gatehouse HVAC and Electrical Upgrades Project
Owner: The Gatehouse
Engineer: Peters Consultants, Inc.
?? 2701 Columbia Boulevard, Bloomsburg, PA 17815
Deadline: September 24, 2025, at 11:00 AM (local time)
Submission Options:
Online via PennBid
Hard copy sealed bids (marked “Sealed Bid for The Gatehouse HVAC and Electrical Upgrades Project”) delivered to the Engineer’s office
Bid Opening Location: Peters Consultants, Inc., 2701 Columbia Boulevard, Bloomsburg, PA
Review & Award: Bids reviewed by The Gatehouse; contract award contingent upon SEDA-COG approval for CDBG compliance
Date: September 17, 2025
Time: 11:00 AM
Location: On site at The Gatehouse, 21 Gatehouse Drive, Danville, PA 17821
Attendance: Optional
Install a new HVAC system in the existing building, including:
12 individual wall units with wireless thermostats (all major rooms)
Retain existing heating system for backup/supplemental use
Three outdoor condenser inverters (one per floor), with underground piping/electrical connections into basement
Concealed infrastructure routed through building via existing radiator pipe chases
Conceal power, condensation, return, and supply lines with crown molding (full perimeter installation where required)
Use boxed-out corners for vertical runs (no additional exterior-mounted components)
Electrical upgrades throughout the building per technical specification (Part III, Section 04060)
Work separated into two contracts:
Mechanical Construction
Electrical Construction
If awarded separately, contractors must coordinate work
Contractors must coordinate with Engineer, SEDA-COG, and The Gatehouse, and obtain all necessary permits
Online: http://PennBid.Bonfirehub.com
Hard Copy: Available from Peters Consultants, Inc.
$45 per set (+$25 shipping if required)
In-Person Review: Free at Engineer’s office, weekdays 8:00 AM – 4:30 PM
Bid Bond: 10% of total bid required with submission
Upon Award: Contractor must promptly provide performance and payment bonds, insurance, and required submittals
Davis-Bacon wage rates apply
Equal Employment (EO 11246):
Female participation goal: 6.9%
Minority participation goal: 1% (on-site construction, contracts > $10,000)
MBE/WBE & Section 3 Requirements:
MBE goal: 5%
WBE goal: 3% (contracts ≥ $25,000)
Section 3 goals (if HUD/CDBG funding > $200,000):
25% of labor hours = Section 3 workers
5% of labor hours = Targeted Section 3 workers
Documentation of solicitations and commitments must accompany bid
Section 3 businesses may receive preference
The Gatehouse may:
Hold bids for up to 60 days (or longer if allowed by law)
Reject any or all bids
Waive irregularities
Negotiate contract amounts
The Gatehouse does not discriminate based on race, color, national origin, sex, religion, age, disability, or familial status in employment or services.
Issued by:
SEDA-Council of Governments
Contact: Ms. Leslie Hosterman, Project Coordinator

With GovernmentContracts, you can: