RFP #26-017: Data Center Enclosure & MEP Upgrades

Location: Texas
Posted: Sep 20, 2026
Due: Oct 21, 2026
Agency: Tarrant County College District
Type of Government: State & Local
Category:
  • 70 - General Purpose Information Technology Equipment (including software).
Solicitation No: RFP #26-017
Publication URL: To access bid details, please log in.
Project: RFP #26-017: Data Center Enclosure & MEP Upgrades
Ref. #: RFP #26-017
Type: RFP
Status:
Open
Open Date: Sep 18th 2026, 12:00 PM CDT
Questions Due Date: Oct 13th 2026, 11:30 PM CDT
Close Date: Oct 21st 2026, 2:00 PM CDT

Project Description: Request for Proposals
Tarrant County College District (TCCD) announces RFP #26-017: Data Center Enclosure & MEP Upgrades. The RFP proposal submission deadline is Wednesday, October 21, 2026, at 2:00 PM local time. A virtual initial public conference is scheduled for Wednesday, September 23, 2026, at 11:00 AM local time. A non-mandatory walk-through is scheduled for Thursday, September 24, 2026, at 9:00 AM local time. See our bid portal for more specific information, Bonfire: https://tccd.bonfirehub.com/. Darren King, Construction Purchasing Manager, darren.king@tccd.edu.
Tarrant County College District is soliciting proposals for RFP #26-017, Data Center Enclosure & MEP Upgrades, located at the TCC Trinity River Campus, 300 Trinity Campus Circle, Fort Worth, Texas 76102, Building ID TCRF (Clear Fork). The project consists of renovations and system upgrades to the existing data center/server-room area. The construction documents identify an approximate 4,070-square-foot renovation area.
The work is anticipated to be performed under one lump-sum construction contract and includes all labor, materials, equipment, supervision, coordination, and incidentals necessary to complete the project as shown and specified in the Contract Documents. The scope includes selective demolition; modifications to the existing raised access floor; new demountable fire-rated enclosure construction and welded-wire security partitions; doors, hardware, ceilings, finishes, signage, and firestopping; and modifications to access control, security, and related technology systems.
The work also includes substantial MEP upgrades, including removal of existing computer-room air-conditioning equipment and installation of new CRAH units; chilled-water piping, condensate and domestic-water connections; BAS controls and integration; modifications to fire suppression, VESDA smoke detection, FM-200/clean-agent systems, and fire alarm systems; electrical distribution and equipment connections; lighting and lighting controls; and reconfiguration of the emergency-power-off systems. Construction must be coordinated so that the operating data center remains functional, including maintaining the required cooling capacity during the work and implementing specified dust containment, negative-air, and HEPA filtration measures.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...controls and integration; modifications to fire suppression, VESDA smoke detection, FM-200/clean-agent... to the ...

Tarrant County College District

Bid Due: 11/25/2026

...(Fire Alarm Service, Parts and Repair) RFP 832-2023-05-28 (Canine Detection Services) RFP 834-2023... ...

Frisco Independent School District

Bid Due: 12/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.