| Location: | Pennsylvania |
|---|---|
| Posted: | Mar 29, 2026 |
| Due: | Apr 17, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Antrim Township Municipal Authority, Franklin County |
| Publication URL: | To access bid details, please log in. |
Project Description: The proposed project consists of General Work and Electrical Work to furnish structures and appurtenances on the Well No. 3 and the Conococheague Lane Water Treatment Plant (CLWTP) sites, and piping and conduit extensions and connections within and between the sites to complete a functional system of treatment and partial distribution from a 179 gpm well, including all related work as shown and specified. Installation of specified equipment furnished by others, and connections to a 246,000 gallon water tank constructed by others, is part of this Project.

With GovernmentContracts, you can:
...tank. The work involved with installation of the water storage tank includes, but ...
PennBid
Bid Due: 6/17/2026
...tank. The work involved with installation of the water storage tank includes, but ...
PennBid
Bid Due: 6/24/2026
...tank. The work involved with installation of the water storage tank includes, but ...
PennBid
Bid Due: 6/25/2026
.... * Excavation, stockpiling and backfilling. * Connection to existing electrical utilities * ...
PennBid
Bid Due: 6/19/2026