| Location: | Texas |
|---|---|
| Posted: | Jul 23, 2025 |
| Due: | Aug 6, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 149FWTowerCabs |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
25 JULY 2025 UPDATES
-Amended and extended quote submission date, added Q&A below.
-SEE NEW ATTACHMENT FOR DEMENSIONS AND PICTURES
Q&A current as of 23 July 2025:
Good morning,
Below are the Q&A responses I have from all contractors thus far to include yours:
Contractor 1:
If selected, do we have to remove, demolish the existing tower cabs and provide installation of the new cabs or we just need to deliver the tower cabs?
If possible, can you please share any drawings or example pictures of the building so we can put together an accurate proposal.
Response: Complete project is removal of old tower cab and install of new cab. See Attached
Contractor 2:
1. There is a reference to drawings, 5.12 Unit to have five quadplex outlets and four duplex outlets. Outlets
are wall mounted and circuited as shown on the electric plan,
sheet 4 of 7.
Two 12' walls to have two rows of 18" wide x 20 12" tall checkers, two 10' walls to have two rows of 17 18" wide x 20 12" checker
Are they required to conform to any DOD UFCs
Responses:
Question 1- Electrical requirement for the cab are 5 quadplex outlets that are wall mounted and a total of 4 single gang junction boxes feed from 75amp 120/240vac panel with ground bus and 8 circuits. Reference to sheet 4 of 7 is in error no reference are available.
Question 2- Yes paint scheme two tone checkered pattern with said dimensions
Question 3 - Need more time to verify requirements if any
Question 4- no
Question 5- Price will include demolition(removal) of old cab, new cab, transportation to sire in Tilden TX, and install of new cab atop of tower.
END OF Q&A
________________________________________________________________________________________________
100% SMALL BUSINESS SET ASIDE
Award is made due to price and other factors delivery/install, and customer review of specifications
1. PURPOSE. Replace outdated tower cabs by removing older cabs and installing the newly fabricated cabs in their places.
2. SCOPE OF WORK. Includes all fabrication, demolition, transportation, and installation activities required to complete the upgrade efficiently and safely with minimal disruption to ongoing tower operations. This work will ensure improved structural integrity, safety, and functionality of the towers, while meeting current operational and regulatory standards.
3. DELIVERY LOCATION AND DELIVERY DATE. These cabs shall be delivered to the Texas Air National Guard 149 Fighter Wing/DET-1 (Yankee Range), located at 2200 FM 624 W, Tilden, Texas 78072 (28.23906 N, 98.71525 W) not later than October 30, 2025.
4. QUANTITY REQUIRED: 2 Tower Cabs
Q&A
| Jul 18, 2025 | [Solicitation (Original)] Replace outdated tower cabs |
| Jul 31, 2025 | [Solicitation (Updated)] Replace outdated tower cabs **Updated 31 July** |