| Location: | Washington |
|---|---|
| Posted: | May 30, 2025 |
| Due: | Jun 9, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 6/9/25 1:00pm |
Spokane, WA
This project consists of the grind and overlay of arterial roadways at two separate locations in north Spokane – Sprague from Freya to Havana, and Alki/Broadway from Freya to Havana. This project consists of the 26,000 square yards of 2-inch thick HMA pavement and planing of existing HMA pavement, 1,350 square yards of pavement repair excavation, 6,350 square yards of full roadway replacement, 45 square yards of cement concrete sidewalk for ADA ramp construction, 500 lineal feet of curb or curb & gutter, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...Contract I-5/I-205, Concrete Panel Rehabilitation Contract summary Requires replacing cement... and other work. ...
State Government of Washington
Bid Due: 6/17/2026
...removing and replacing precast cement concrete panels (PCCP), grinding, removing and replacing... guardrail, ...
State Government of Washington
Bid Due: 6/10/2026
...roadway (grinding and mixing existing pavement, underlying gravel and subgrade with cement and ...
County of Cowlitz
Bid Due: 6/15/2026
...of roadway and building construction materials including, but not limited to: hot mix ...
City of Sequim
Bid Due: 6/19/2026