Bid Solicitation: SPD125-SPDAD-5909
|
|
Header Information
|
|
Bid Number:
|
SPD125-SPDAD-5909
|
Description:
|
CSA 70 TV-2 Morongo Backup Generator Project
|
Bid Opening Date:
|
06/30/2025 02:00:59 PM
|
|
Purchaser:
|
Jessica Barajas
|
Organization:
|
Special Districts
|
|
Department:
|
SPDADMIN - ADMINISTRATION
|
Location:
|
SPADM - Administration
|
|
Fiscal Year:
|
25
|
Type Code:
|
RB - Request For Bid
|
Allow Electronic Quote:
|
Yes
|
|
Alternate Id:
|
|
Required Date:
|
|
Available Date
:
|
06/06/2025 06:00:00 AM
|
|
Info Contact:
|
Jon Aldana, Sr. Project Manager: (909) 386-8801 or jon.aldana@dpw.sbcounty.gov
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
A Mandatory Pre-bid meeting will start at 10:30AM on June 12, 2025 at the project site located at Southeast of Highway 62, along Livingston Drive in, Morongo Valley, California.
|
|
Bulletin Desc:
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the installation of the new back-up generator and all associated equipment to provide automatic back-up power, which will enable the Morongo TV Tower equipment to operate at modified capacity as shown on the Bid Documents, including the Plans and Specifications.
|
|
|
Ship-to Address:
|
Reception
Eng Tech
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: SDDprocurement@sdd.sbcounty.gov
Phone: (909) 386-8800
|
Bill-to Address:
|
Reception
Eng Tech
222 W. Hospitality Lane
2nd Floor
San Bernardino, CA 92415
US
Email: SDDprocurement@sdd.sbcounty.gov
Phone: (909) 386-8800
|
Print Format:
|
|
File Attachments:
|
CSA 70 TV-2 Morongo Generator_Addendum No. 2
CSA 70 TV-2 Morongo Generator_Addendum No. 1.pdf
CSA 70 TV-2 Morongo Generator - Section A - Bidding Requirements.pdf
CSA 70 TV-2 Morongo Generator - Section B - Contract and Bonds.pdf
CSA 70 TV-2 Morongo Generator - Section C - Prevailing Wage.pdf
CSA 70 TV-2 Morongo Generator - Section D - General Conditions.pdf
CSA 70 TV-2 Morongo Generator - Section E - Special Conditions~1.pdf
CSA 70 TV-2 Morongo Generator - Section F - Technical Specifications.pdf
CSA 70 TV-2 Morongo Generator - Section G - Exhibits~1.pdf
|
Form Attachments:
|
|
|
Required Quote Attachments
|
|
|
Amendments:
|
|
Amendment #
|
Amendment Date
|
Amendment Note
|
1
|
06/18/2025 05:04:08 PM
|
Addendum No. 1 Attachment File Changes: Header 1. File 'CSA 70 TV-2 Morongo Generator_Addendum No. 1.pdf': File 'CSA 70 TV-2 Morongo Generator_Addendum No. 1.pdf' added .
|
2
|
06/24/2025 11:45:34 AM
|
Header 1. Bid Opening Date changed from "06/25/2025 10:00:59 AM" to "06/30/2025 02:00:59 PM". Attachment File Changes: Header 1. File 'CSA 70 TV-2 Morongo Generator_Addendum No. 2': File 'CSA 70 TV-2 Morongo Generator_Addendum No. 2' added . 2. File 'CSA 70 TV-2 Morongo Generator - Section A - Bidding Requirements.pdf': Order changed from "0" to "2". 3. File 'CSA 70 TV-2 Morongo Generator - Section B - Contract and Bonds.pdf': Order changed from "0" to "3". 4. File 'CSA 70 TV-2 Morongo Generator - Section C - Prevailing Wage.pdf': Order changed from "0" to "4". 5. File 'CSA 70 TV-2 Morongo Generator - Section D - General Conditions.pdf': Order changed from "0" to "5". 6. File 'CSA 70 TV-2 Morongo Generator - Section E - Special Conditions~1.pdf': Order changed from "0" to "6". 7. File 'CSA 70 TV-2 Morongo Generator - Section F - Technical Specifications.pdf': Order changed from "0" to "7". 8. File 'CSA 70 TV-2 Morongo Generator - Section G - Exhibits~1.pdf': Order changed from "0" to "8". 9. File 'CSA 70 TV-2 Morongo Generator_Addendum No. 1.pdf': Order changed from "0" to "1".
|
|
|
Item # 1:
(
914
-
38
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the installation of the new back-up generator and all associated equipment to provide automatic back-up power, which will enable the Morongo TV Tower equipment to operate at modified capacity as shown on the Bid Documents, including the Plans and Specifications.
|
|
NIGP Code:
|
914-38
Electrical
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
909
-
24
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the installation of the new back-up generator and all associated equipment to provide automatic back-up power, which will enable the Morongo TV Tower equipment to operate at modified capacity as shown on the Bid Documents, including the Plans and Specifications.
|
|
NIGP Code:
|
909-24
Building Construction, Commercial and Institutional
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
909
-
63
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the installation of the new back-up generator and all associated equipment to provide automatic back-up power, which will enable the Morongo TV Tower equipment to operate at modified capacity as shown on the Bid Documents, including the Plans and Specifications.
|
|
NIGP Code:
|
909-63
Maintenance and Repair, Commercial and Institutional Building
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
906
-
38
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the installation of the new back-up generator and all associated equipment to provide automatic back-up power, which will enable the Morongo TV Tower equipment to operate at modified capacity as shown on the Bid Documents, including the Plans and Specifications.
|
|
NIGP Code:
|
906-38
General Construction - Architectural
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
909
-
30
)
|
Contractor shall provide all supervision, labor, equipment, materials, and transportation necessary to complete the Project that includes the installation of the new back-up generator and all associated equipment to provide automatic back-up power, which will enable the Morongo TV Tower equipment to operate at modified capacity as shown on the Bid Documents, including the Plans and Specifications.
|
|
NIGP Code:
|
909-30
Building Construction (Not Otherwise Classified)
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Tax Rate
|
Tax Amount
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
NOCODE_SBCOUNTY_AWS_PROD
|
|