| Location: | Vermont |
|---|---|
| Posted: | Apr 21, 2026 |
| Due: | May 21, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building) Bid Description: The Town of Northfield, in partnership with Vermont Natural Resources Council, is seeking bids to remove the Cross Brothers Dam on the Dog River. The project will generally involve removal of the concrete dam and appurtenant structures; removal of the accumulated sediment; stream channel restoration; installation of stone armor at the sanitary sewer crossings and along the north riverbank; and site restoration. Please Contact Project Engineer Ethan Ely for plans and other attachments to the attached bid announcement.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...OVER WILLIAMS RIVER AT MILE POST 17.10 REPLACE EXISTING STONE FILL PLACED AFTER ...
State Government of Vermont
Bid Due: 10/09/2026
..., a dry-stacked stone walk, stone bridge, plunge pool, dry swale, check dam, ...
State Government of Vermont
Bid Due: 10/02/2026
.... The Project includes installation of encapsulated soil lifts, stone toe protection, plantings...
State Government of Vermont
Bid Due: 10/07/2026
...Park Stage - Stage Photos.pdf Bay Park Stage - Stone House Photos.pdf Bay ...
State Government of Vermont
Bid Due: 10/08/2026