| Location: | Missouri |
|---|---|
| Posted: | Mar 29, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | City of Jefferson |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB4367-03/26 |
| Publication URL: | To access bid details, please log in. |
Project Description: The proposed work for the project entitled "Westview Force Main – Phase 2 Project No. 31215” will include the furnishing of all material, labor, and equipment for construction of approximately 8,150 feet of new wastewater force main including sitework, piping, air release valves and structures, construction of storm sewer replacements, and construction of approximately 1,160 feet of 12-inch sanitary sewer, including manhole and pipe connections.

With GovernmentContracts, you can:
...bike lane, access connections, storm sewers, curb and gutter, street lighting, asphalt widening... ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/23/2026
...lighting, storm sewer, curb and gutter, and waterline replacement and tree planting. Primary ...
Lee's Summit city
Bid Due: 6/10/2026
...the roadway, New inlets and storm sewer connecting an adjacent drainage project and ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/12/2026
...2 rock blanket, storm sewer structures and piping, rip-rap slope protection, construction...
Missouri Department of Transportation(MDOT)
Bid Due: 6/11/2026