| Location: | Utah |
|---|---|
| Posted: | May 18, 2026 |
| Due: | Jun 9, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CS26080 |
| Publication URL: | To access bid details, please log in. |
Project Description: INVITATIONAL
Only invited contractors listed below are allowed to attend the mandatory meeting.
Contractor Name - C&R Coatings - Eric Jones - eric@candr11.com
Contractor Name -J.Ber Concrete and Landscape - Joseph Berardini - jberconcrete@gmail.com
Contractor Name - Miller Paving - Jamen Porter - jporter@millerpaving.com
Contractor Name - Precision Landworks - Matt Wagner - matt@wagnergolfworks.com
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project:
Project Description: Removal of existing sod area and install concrete pad and install 59 artificial turf hitting mats at the golf course driving range. Also, build concrete picnic table slabs with sidewalk connection to the existing cart path.
Construction Cost Estimate: $90,000.00

With GovernmentContracts, you can:
...Project: 2026-2027 Concrete Projects Ref. #: 2026-011 Department: CITIES - Springville City Type... ...
State Government of Utah
Bid Due: 8/05/2026
...Project: SLCo PWO130995-1 Asphalt Concrete Mix - RFC Ref. #: SLCo PWO130995-1 Asphalt ...
State Government of Utah
Bid Due: 12/31/2026
...PM MDT Project Description: The project consists of constructing a new ADA-compliant concrete...
State Government of Utah
Bid Due: 7/30/2026
...concrete boat ramp to replace existing ramp in poor condition. Construction Cost Estimate: ...
State Government of Utah
Bid Due: 7/30/2026