| Location: | Arkansas |
|---|---|
| Posted: | Mar 20, 2025 |
| Due: | Apr 7, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9127S25RA003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOURCES SOUGHT SYNOPSIS
Pine Bluff Arsenal Waterline Replacement
This is a SOURCES SOUGHT announcement; a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. Respondents will not be notified of the results of the evaluation.
On behalf of the Pine Bluff Arsenal, the U.S. Army Corps of Engineers – Little Rock District will manage the design-build solicitation and procurement of the Pine Bluff Arsenal South Side Waterline System Replacement. This will be a two step design build procurement in accordance with FAR 36.3.
The current PBA South Side Waterline system consists mostly of asbestos cement and cast-iron pipes which have been in service since 1942-1959, and it is beyond service life and unable to operate as designed. The system shall be upgraded and replaced including piping, valves, hydrants, and other appurtenances. The system currently serves an active installation with approximately 350,000 gallons per day through a distribution system, and as such the system will be kept operational to support the mission while the project is underway. When the new system is fully operational, the old system will be removed from service and abandoned in place.
The new system is not to connect to any existing mains or laterals except at facility entrances and appurtenance connections. The new system should be capable of providing water at a pressure and quantity in accordance with the applicable codes for domestic demands and fire demands. The new system shall be designed to provide all existing fire pumps with adequate flow and pressure in accordance with the pumps’ original design criteria. The South Side system consists of approximately 14,339 linear feet (LF) of 16” pipe, 3,934 LF of 12” pipe, 36,139 LF of 10” pipe, 100,240 LF of 8” pipe, 21,152 LF of 6” pipe, 1,591 LF of 4” pipe, 5,271 LF of 3” pipe, 32,032 LF of pipe less than 2”, 328 hydrants, 186 valves, and other appurtenances.
Estimated Value Range: In accordance with FAR 36/DFARS 235, the estimated value for this requirement is between $18,000,000 to $20,000,000.
Estimated Schedule Dates:
Firm’s response to this Synopsis shall be limited to 5 pages and shall include the following information:
The purpose of this synopsis is to gain knowledge of interest, capabilities and qualifications of various members of industry, to include the Other than Small & the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), & Woman-Owned Small Business (WOSB). The Government must ensure there is adequate competition among the potential pool of responsible contractors. Small business, Section 8(a), HUBZone, SDVOSB, & WOSB are highly encouraged to participate.
Estimated duration of the project is 730 calendar days.
The North American Industry Classification System code for this procurement is 237110 – Water and Sewer Line and Related Structures Construction, small business size standard of $45,000,000
The Federal Supply Code is Z1NE – Maintenance of Water Supply Facilities
Small Businesses & 8(a) participants are reminded under FAR 52.219-14, Limitations on Subcontracting, DOD will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded” for general construction-type procurement.
Prior Government contract work is not required for submitting a response under this sources sought synopsis.
Interested Firm’s shall respond to this Sources Sought Synopsis no later than 10:00 pm on 7 April 2025. All interested firms must be registered in System for Award Management (SAM) to be eligible for award of Government contracts. Mail, fax or email your response to Marcus Mitchell; Marcus.D.Mitchell@usace.army.mil. Little Rock District Corps of Engineers, 700 W. Capitol Avenue Room 7315, Little Rock, AR 72201, EMAIL IS THE PREFERRED METHOD WHEN RECEIVING RESPONSES TO THIS SYNOPSIS.
| Apr 17, 2025 | [Presolicitation (Original)] PBA Waterline Replacement |
| May 5, 2025 | [Solicitation (Original)] PBA Waterline Replacement |
| May 13, 2025 | [Solicitation (Updated)] PBA Waterline Replacement |
| May 24, 2025 | [Solicitation (Updated)] PBA Waterline Replacement |

With GovernmentContracts, you can:
Due 6/3/2026 2:00 pm US/Central Question Deadline 5/21/2026 11:45 pm US/Central Open 26026RFQ
Clinton National Airport
Bid Due: 6/03/2026
NOTICE TO CONTRACTORS Sealed bids will be received until 2:00PM, June 3, 2026,
Arkansas Democrat-Gazette
Bid Due: 6/03/2026
City of Horseshoe Bend Horseshoe Bend, Arkansas 6M2 Runway 13-31 Rehabilitation 00 11
Arkansas Democrat-Gazette
Bid Due: 6/09/2026
REQUEST FOR QUALIFICATIONS SOLICITATION No. 26026 Comprehensive Airport Financial Consulting Services The Little
Arkansas Democrat-Gazette
Bid Due: 6/03/2026