| Location: | Georgia |
|---|---|
| Posted: | Jul 29, 2026 |
| Due: | Sep 4, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66790-NONST-2027-000000031 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66790-NONST-2027-000000031 | PTC 25-10 Peachtree Corners Town Center Overlook | Peachtree Corners, City Of |
Jul 29, 2026 @ 04:04 PM
|
Sep 04, 2026 @ 02:00 PM
|
Start Date: Jul 29, 2026 @ 04:04 PM ET
End Date:
Sep 04, 2026 @ 02:00 PM ET
Advertisement for Bids
PTC 25-10 Peachtree corners Town Center Overlook
Separate sealed Bids for the construction of PTC 25-10 Peachtree Corners Town Center Overlook will be received by the City of Peachtree Corners, Georgia at Peachtree Corners City Hall located at 310 Technology Parkway, Peachtree Corners, Georgia 30092 until September 4, 2026, 2:00 P.M. local time, and then at said office publicly opened and read aloud. The project consists of a pedestrian overlook structure on top of a cast in place retaining wall. The project will involve building sidewalk to connect existing portions of the Peachtree Corners Town Center Trail in Peachtree Corners, Georgia. Improvements include concrete sidewalk, concrete stairs with bicycle runnel, grading complete, cast in place retaining wall, and undercut of existing slope.
| Code | Description |
| 91226 | Construction, Hike and Bike Trail |
| 91223 | Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. |
| 91231 | Construction, Statues and Monuments |
| 91319 | Construction, Curb and Gutter, Including Maintenance, Repair, and Removal Services |
| 91313 | Construction, Bridge and Drawbridge, Including Reconstruction and Rehabilitation |
| 91347 | Construction, Sidewalk and Driveway, Including Pedestrian and Handicap Ramps |
| 91362 | Construction, Concrete, Pour-In-Place, Form, Place, Finish |
James Nguyen
jnguyen@peachtreecornersga.gov
470-395-7029
June 4, 2026
Mr. Greg Ramsey
Director of Public Works
City of Peachtree Corners
Peachtree Corners, Georgia
RE: Peachtree Corners Overlook and Trail Extension
Peachtree Corners Town Center
Peachtree Corners, Gwinnett County, Georgia
Project No.: PTC 25-10
Dear Mr. Ramsey,
Michael Baker International is pleased to submit the enclosed final plans package for the
Peachtree Corners Overlook and Trail Extension project. This submittal includes the plan set
and the construction cost estimate for the proposed improvements.
We appreciate the opportunity to continue supporting the City of Peachtree Corners with
quality engineering. We look forward to this project becoming a valuable community asset for
years to come. Should you have any questions regarding the enclosed materials or require any
additional information, please do not hesitate to contact us. Thank you again for the
opportunity to serve the City of Peachtree Corners.
Sincerely,
MICHAEL BAKER INTERNATIONAL
Kevin F Dascall, PE, PMP
Project Manager
3930 East Jones Bridge Road, Suite 220 , Peachtree Corners, GA 30092
Office: 770-263-9118 | Fax: 77-0263-9145
| (C) 2026 Microsoft Corporation (C) 2026 TomTom (C) 2026 Zenrin | |||||||||||||||||||||
| 0' 0 0 1 5' 0 0 7' 9 9 968' 5' 9 9 5' 9 9 | 9 6 5 ' 9 6 8 ' |
|---|
(C) 2026 Microsoft Corporation (C) 2026 TomTom (C) 2026 Zenrin
0'
0
0
1
5'
0
0
1 7'
9
9
968'
9
6
5
'
1000'
9
6
8
'
5'
9
9
5'
9
9
| BORING B-3-XX (8.52) S C E D FH SANITARY CLEAN OUT CO B | |||||||||||||||
| AC ASPHALTIC CONCRETE MH MANHOLE ALO APPROXIMATE LOCATION OF MIN. MINIMUM B/C BOTTOM OF CURB MP MATCH PAVEMENT BL BREAKLINE MUTCD MANUAL OF UNIFORM BLDG BUILDING TRAFFIC CONTROL DEVICES BP BASIN PROTECTION NAS NAVAL AIR STATION BMP BEST MANAGEMENT PRACTICES NTS NOT TO SCALE BW BOTTOM OF WALL OC ON CENTER CL CENTERLINE OD OUTSIDE DIAMETER C.B. CATCH BASIN O/H OVERHEAD C.B.S. CONCRETE BLOCK STRUCTURE OWS OIL/WATER SEPARATOR CN CURVE NUMBER PCC PORTLAND CEMENT CONCRET C.O. CLEANOUT PIV POST INDICATOR VALVE COMM COMMUNICATIONS PSI POUNDS PER SQUARE INCH CONC CONCRETE PSF POUNDS PER SQUARE FOOT DIA DIAMETER PVC POLYVINYL CHLORIDE DIAMETER R RADIUS ECP ENTRY CONTROL POINT RD ROOF DRAIN EP EDGE OF PAVEMENT RCP REINFORCED CONCRETE PIPE EX. EXISTING SAN SANITARY SEWER FFE FINISHED FLOOR ELEVATION sf SQUARE FEET F.W. FIRE WELL STD. STANDARD GALV. GALVANIZED SWMF STORM WATER MANAGEMENT GEN. GENERATOR FACILITY GSE GROUND SUPPORT EQUIPMENT TBM TEMPORARY BENCHMARK HB HAYBALES TC TOP OF CURB HGL HYDRAULIC GRADE LINE TS TRANSFER SWITCH INV INVERT TW TOP OF WALL LOD LIMITS OF DISTURBANCE TYP. TYPICAL LP LOW POINT U/G UNDERGROUND MAX MAXIMUM UG UNDERGROUND MECH MECHANICAL EQUIPMENT UGC UNDERGROUND MG MATCH GRADE COMMUNICATIONS UGE UNDERGROUND ELECTRIC WWF WELDED WIRE FABRIC XFMR TRANSFORMER | |||||||||||||||
| DEMOLISH ASPHALT DEMOLISH CONCRETE DEMOLISH GRAVEL PARKING LOT DEMOLISH BUILDING DEMOLISH LINEAR OBJECT CONCRETE SIDEWALK CONCRETE PAVEMENT LOW IMPACT DEVELOPMENT AREA RIVER ROCK GRAVEL REMOVE TREE REMOVE OBJECT | 1. HORIZONTAL COORDINATES ARE IN US STANDARD FEET AND REFER TO THE STATE PLANE COORDINATE SYSTEM, NAD83 AND VERTICAL ELEVATIONS ARE IN STANDARD FEET AND REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). SURVEY PROVIDED BAYT LAS TECHNICAL CONSULTANTS L.,L DCA.TED APRIL 8, 2026. ADDITIONAL SURVEY PROVIDED DATED 16 SEPTEMBER 2022. 2. SURVEY FOR THE SITE WAS PROVIDEDA BTYLA S TECHNICAL CONSULTAN,TS DATED APRIL 27, 2026 E 3. THE SURVEY PROVIDED DOES NOT GUARANTEE THE EXISTENCE OR NONEXISTENCE, SIZE, TYPE, DEPTH, MATERIAL OR LOCATION OF ANY UNDERGROUND UTILITIES. ALL UTILITIES SHOWN ARE BASED ON ABOVEGROUND UTILITY STRUCTURES, AVAILABLE UTILITY MAPS AND SITE PLANS. 4. THE GEOTECHNICAL ENGINEERING REPORTS, PREPAREUDN IBTYE D CONSULTIN,G A.RE PROVIDED AS A SEPARATE DOCUMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL/DISPOSAL OF ANY UNSUITABLE MATERIAL FROM THEIR OPERATION, FURNISHING AND COMPACTING SUITABLE REPLACEMENT BACKFILL MATERIAL IN ACCORDANCE WITH PROJECT SPECIFICATIONS. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND INSURANCE REQUIRED FOR THE PROJECT. 6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONFIRM, IN THE FIELD, THE EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 7. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION WITH ALL OTHER UTILITIE CONSTRUCTION. 8. CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE EROSION CONTROLS DURIN AND FOLLOWING CONSTRUCTION UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZE TO AVOID ADVERSE ENVIRONMENTAL IMPACTS TO OFF-SITE PROPERTY AND DRAINAG SYSTEMS. 9. THE CONTRACTOR SHALL NOTIFY ALL APPLICABLE UTILITIES COMPANIES 48 HOURS PRIOR TO INITIATING ANY EXCAVATION ACTIVITIES, OR AS SPECIFIED BY THE UTILITIE COMPANIES AND THE PERMITS OBTAINED FOR THE WORK. 10. CONSTRUCTION WARNING SIGNS ARE TO BE MOUNTED AND ERECTED BEFORE CONSTRUCTION CAN COMMENCE. THESE AND ALL TRAFFIC CONTROL DEVICES SHALL FOLLOW THE STANDARDS SET FORTH BY THE MANUAL OF UNIFORM TRAFFIC CONTRO DEVICES (MUTCD). 11. THE CONTRACTOR IS RESPONSIBLE FOR CLEARLY IDENTIFYING THE AREA OF CONSTRUCTION AND SAFELY ROUTING ALL VEHICULAR AND PEDESTRIAN TRAFFIC AROUND THE CONSTRUCTION AREA. THE CONSTRUCTION AREA SHALL BE CLEARLY MARKED AT ALL TIMES. 12. THE CONTRACTOR SHALL LOCATE, VERIFY, AND IDENTIFY ALL UTILITY LOCATIONS PRIOR TO EXCAVATION AND TAKE ALL MEASURES NECESSARY TO PROTECT UTILITIES DURING CONSTRUCTION. CONTRACTOR SHALL SOFT DIG OR HAND DIG IN AREAS WIT CONGESTED UTILITY CORRIDORS. SHOULD ANY UTILITY LINE OR COMPONENT BECOM DAMAGED OR REQUIRE RELOCATION THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE RESPONSIBLE UTILITY COMPANY. 13. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES, SURVEY MARKERS, MONUMENTS, ETC. DURING CONSTRUCTION. THE CONTRACTOR SHALL RESTORE/REPLACE ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES. R OR | 1. SEWER, WATER, STORM DRAIN AND SLEEVES DEEMED NECESSARY FOR IRRIGATION AND ELECTRIC (AT A MINIMUM) MUST BE INSTALLED PRIOR TO THE CONSTRUCTION OF CURB, BASE AND PAVEMENT. 2. SITE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH LIGHTING IRRIGATION AND ELECTRICAL UTILITY REGARDING REQUIRED CONDUITS. 3. PIPE LENGTHS SHOWN ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. 4. WATER AND WASTEWATER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT SPECIFICATIONS. 5. ALL MANHOLES, INLETS AND CLEANOUTS SUBJECT TO VEHICULAR LOADING, INCLUDING THOSE AREAS REQUIRING FUTURE MAINTENANCE, SHALL HAVE TRAFFIC BEARING RINGS, COVERS, GRATES, ETC. 6. ALL STORM SEWER STUB OUTS ARE TO BE CLOSED WITH MASONRY SEAL AT THE STUB END. 7. ALL STORM WATER DRAIN PIPE JOINTS WITHIN 5 FEET OF PAVING SHALL BE WRAPPED WITH APPROPRIATE FILTER FABRIC UNLESS OTHERWISE NOTED IN THE CONSTRUCTION DOCUMENTS. 8. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT GUARANTEED. THE CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL, AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. S | |||||||||||||
| G D E S 1. THE CONTRACTOR SHALL COORDINATE ALL NOTIFICATIONS AND UTILITY LOCATION EFFORTS WITH THE UTILITY OWNERS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 2. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE SEEDED AND MULCHED OR SODDED IN ACCORDANCE WITH THESE CONSTRUCTION PLANS AND PROJECT SPECIFICATIONS. L 3. THE CONTRACTOR IS RESPONSIBLE FOR THE TRENCH SAFETY SYSTEM. THE TRENCH SAFETY SYSTEM SHALL BE COMPLIANT WITH EM385-1-1. 4. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THE LAYDOWN AREA IS RESTORED TO EXISTING OR BETTER CONDITIONS. 5. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF SEDIMENT AND EROSION CONTROL MEASURES DURING CONSTRUCTION. H 6. THE CONTRACTOR SHALL ADHERE TO ALL NOTES PROVIDED IN THESE CONSTRUCTION E DRAWINGS. 7. ALL CONSTRUCTION LINES & GRADES SHALL BE ESTABLISHED AND MAINTAINED BY THE CONTRACTOR. 8. ALL EXTERIOR VEHICULAR SIGNAGE SHALL USE A MINIMUM OF TYPE III RETROREFLECTIVE SHEETING IN ACCORDANCE WITH MUTCD AND ASTM D4956-09 REQUIREMENTS. QUIRED ORK RAL HE E | |||||||||||||||
| ATFP SETBACK OVERHEAD COMPRESSED AIR LINE UNDERGROUND COMPRESSED AIR LINE ELECTRIC ELECTRICAL DUCTBANK FENCE - CHAIN LINK FIRE HOSE LAY FIRE LINE LIMITS OF DISTURBANCE SILT FENCE SANITARY SEWER PIPE STORM SEWER PIPE CONDENSATE LINE STEAM CONDENSATE LINE UNDERGROUND COMMUNICATION WATER LINE UNKNOWN WATER LINE FORCE MAIN | NORTH ARROW DWG SCALE INDICATO DRAWING TITLE INDICAT Scale: REVISION CLOUD AND NUMBER INDIC 3 C | ||||||||||||||
| ATTOHER CONTRACTOR SHALL COMPLY WITH ALL CODES REGULATING DEMOLITION WORK. THE CONTRACTOR SHALL ERECT BARRIERS AND WARNING LIGHTS, AS MAY BE NECESSARY OR RE TO PROTECT AND PREVENT UNAUTHORIZED PERSONNEL FROM ENTERING THE DEMOLITION W AREA. ALL DEMOLITION OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FEDE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) AND EM-385-1-1 INSOFAR AS THEY APPLY TO DEMOLITION WORK TO BE PERFORMED UNDER THIS CONTRACT. 1. ALL THE EXISTING FACILITIES TO REMAIN SHALL BE ACCESSIBLE DURING THE ENTIRE DURATION OF CONSTRUCTION. 2. TEMPORARY PROTECTIVE DEVICES, AS REQUIRED SHALL BE INSTALLED ADJACENT TO THE DEMOLITION WORK FOR PROTECTION OF PERSONNEL, EXISTING ADJACENT BUILDINGS, STRUCTURES AND EQUIPMENT AGAINST DUST, FALLING OR FLYING DEBRIS. ANY DAMAGE TO EXISTING STRUCTURES, FACILITIES AND/OR EQUIPMENT RESULTING FROM DEMOLITION WORK SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO T GOVERNMENT. 3. ALL DEBRIS, STUMPS AND MATERIALS GENERATED BY PROJECT DEMOLITION SHALL BE HAULED AWAY AND DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR SHALL MAK HIS OWN ARRANGEMENTS FOR OBTAINING DISPOSAL AREAS. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT SPILLAGE OF MATERIALS BEING HAULED IN PUBLIC STREETS. IT SHALL BE THE CONTRACTOR RESPONSIBILITY TO IMMEDIATELY CLEAN UP ANY SPILLAGE WHICH MAY ACCIDENTALLY OCCUR. 5. THE CONTRACTO RSHALL MAINTAIN AN ORDER OF NEATNESS AND GOOD HOUSEKEEPING. TOOLS ,SCAFFOLDING AND OTHER DEMOLITION EQUIPMEN TSHALL AT ALL TIMES BE KEPT IN A NEAT AND ORDERLY ARRANGEMENT . AT THE CONCLUSION OF THE DEMOLITION OPERATIONS T,HE ENTIRE WORK AREA SHALL BE LEFT IN A CLEAN CONDITION AS REQUIRED FOR SUBSEQUENT NEW WORK. 6. CONTRACTO RTO SCHEDULE CLEARING AND GRADING WORK FOR CLEAR ZONES AND UTILITY TRENCHING SUCH THAT THERE IS NOT MORE THAN 5 DAYS BETWEEN GROUND DISTURBANC EAND SEEDING . IF THIS CRITERIA IS NOT MET, THE CONTRACTO RSHALL PROVIDE SILT FENCING AT THE LIMITS OF DISTURBANCE. | |||||||||||||||
AC ASPHALTIC CONCRETE MH MANHOLE
ALO APPROXIMATE LOCATION OF MIN. MINIMUM
B/C BOTTOM OF CURB MP MATCH PAVEMENT
BL BREAKLINE MUTCD MANUAL OF UNIFORM 1. HORIZONTAL COORDINATES ARE IN US STANDARD FEET AND REFER TO THE STATE 1. SEWER, WATER, STORM DRAIN AND SLEEVES DEEMED NECESSARY FOR IRRIGATION AND
BORING
DEMOLISH ASPHALT BLDG BUILDING TRAFFIC CONTROL DEVICES PLANE COORDINATE SYSTEM, NAD83 AND VERTICAL ELEVATIONS ARE IN STANDARD ELECTRIC (AT A MINIMUM) MUST BE INSTALLED PRIOR TO THE CONSTRUCTION OF CURB,
B-3-XX
BP BASIN PROTECTION NAS NAVAL AIR STATION FEET AND REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). BASE AND PAVEMENT.
DEMOLISH CONCRETE BMP BEST MANAGEMENT PRACTICES NTS NOT TO SCALE SURVEY PROVIDED BAYT LAS TECHNICAL CONSULTANTS L.,L DCA.TED APRIL 8, 2026.
BW BOTTOM OF WALL OC ON CENTER ADDITIONAL SURVEY PROVIDED DATED 16 SEPTEMBER 2022. 2. SITE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH LIGHTING IRRIGATION
CL CENTERLINE OD OUTSIDE DIAMETER AND ELECTRICAL UTILITY REGARDING REQUIRED CONDUITS.
DEMOLISH GRAVEL PARKING LOT C.B. CATCH BASIN O/H OVERHEAD 2. SURVEY FOR THE SITE WAS PROVIDEDA BTYLA S TECHNICAL CONSULTAN,TS
C.B.S. CONCRETE BLOCK STRUCTURE OWS OIL/WATER SEPARATOR DATED APRIL 27, 2026 3. PIPE LENGTHS SHOWN ARE FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE.
CN CURVE NUMBER PCC PORTLAND CEMENT CONCRETE
DEMOLISH BUILDING
C.O. CLEANOUT PIV POST INDICATOR VALVE 3. THE SURVEY PROVIDED DOES NOT GUARANTEE THE EXISTENCE OR NONEXISTENCE, 4. WATER AND WASTEWATER CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT
COMM COMMUNICATIONS PSI POUNDS PER SQUARE INCH SIZE, TYPE, DEPTH, MATERIAL OR LOCATION OF ANY UNDERGROUND UTILITIES. ALL SPECIFICATIONS.
(8.52) DEMOLISH LINEAR OBJECT CONC CONCRETE PSF POUNDS PER SQUARE FOOT UTILITIES SHOWN ARE BASED ON ABOVEGROUND UTILITY STRUCTURES, AVAILABLE
DIA DIAMETER PVC POLYVINYL CHLORIDE UTILITY MAPS AND SITE PLANS. 5. ALL MANHOLES, INLETS AND CLEANOUTS SUBJECT TO VEHICULAR LOADING, INCLUDING
DIAMETER R RADIUS THOSE AREAS REQUIRING FUTURE MAINTENANCE, SHALL HAVE TRAFFIC BEARING RINGS,
CONCRETE SIDEWALK
ECP ENTRY CONTROL POINT RD ROOF DRAIN 4. THE GEOTECHNICAL ENGINEERING REPORTS, PREPAREUDN IBTYE D CONSULTIN,G A.RE COVERS, GRATES, ETC.
EP EDGE OF PAVEMENT RCP REINFORCED CONCRETE PIPE PROVIDED AS A SEPARATE DOCUMENT. THE CONTRACTOR SHALL BE RESPONSIBLE
CONCRETE PAVEMENT EX. EXISTING SAN SANITARY SEWER FOR REMOVAL/DISPOSAL OF ANY UNSUITABLE MATERIAL FROM THEIR OPERATION, 6. ALL STORM SEWER STUB OUTS ARE TO BE CLOSED WITH MASONRY SEAL AT THE STUB END.
FFE FINISHED FLOOR ELEVATION sf SQUARE FEET FURNISHING AND COMPACTING SUITABLE REPLACEMENT BACKFILL MATERIAL IN
F.W. FIRE WELL STD. STANDARD ACCORDANCE WITH PROJECT SPECIFICATIONS. 7. ALL STORM WATER DRAIN PIPE JOINTS WITHIN 5 FEET OF PAVING SHALL BE WRAPPED WITH
LOW IMPACT DEVELOPMENT AREA
GALV. GALVANIZED SWMF STORM WATER MANAGEMENT APPROPRIATE FILTER FABRIC UNLESS OTHERWISE NOTED IN THE CONSTRUCTION
GEN. GENERATOR FACILITY 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS DOCUMENTS.
RIVER ROCK GSE GROUND SUPPORT EQUIPMENT TBM TEMPORARY BENCHMARK AND INSURANCE REQUIRED FOR THE PROJECT.
HB HAYBALES TC TOP OF CURB 8. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT GUARANTEED. THE
HGL HYDRAULIC GRADE LINE TS TRANSFER SWITCH 6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONFIRM, IN THE FIELD, THE CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL, AND LOCATION OF ALL UTILITIES
GRAVEL
INV INVERT TW TOP OF WALL EXISTING UTILITY LOCATIONS AND ELEVATIONS SHOWN PRIOR TO THE PRIOR TO CONSTRUCTION.
LOD LIMITS OF DISTURBANCE TYP. TYPICAL COMMENCEMENT OF CONSTRUCTION.
REMOVE TREE LP LOW POINT U/G UNDERGROUND
MAX MAXIMUM UG UNDERGROUND 7. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION WITH ALL OTHER UTILITIES
MECH MECHANICAL EQUIPMENT UGC UNDERGROUND CONSTRUCTION.
REMOVE OBJECT
MG MATCH GRADE COMMUNICATIONS
UGE UNDERGROUND ELECTRIC 8. CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE EROSION CONTROLS DURING
WWF WELDED WIRE FABRIC AND FOLLOWING CONSTRUCTION UNTIL ALL DISTURBED AREAS HAVE BEEN STABILIZED
XFMR TRANSFORMER TO AVOID ADVERSE ENVIRONMENTAL IMPACTS TO OFF-SITE PROPERTY AND DRAINAGE
SYSTEMS.
S
9. THE CONTRACTOR SHALL NOTIFY ALL APPLICABLE UTILITIES COMPANIES 48 HOURS
C PRIOR TO INITIATING ANY EXCAVATION ACTIVITIES, OR AS SPECIFIED BY THE UTILITIES
1. THE CONTRACTOR SHALL COORDINATE ALL NOTIFICATIONS AND UTILITY LOCATION
COMPANIES AND THE PERMITS OBTAINED FOR THE WORK.
EFFORTS WITH THE UTILITY OWNERS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
E 10. CONSTRUCTION WARNING SIGNS ARE TO BE MOUNTED AND ERECTED BEFORE
2. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE SEEDED AND MULCHED OR SODDED
CONSTRUCTION CAN COMMENCE. THESE AND ALL TRAFFIC CONTROL DEVICES SHALL
IN ACCORDANCE WITH THESE CONSTRUCTION PLANS AND PROJECT SPECIFICATIONS.
FOLLOW THE STANDARDS SET FORTH BY THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD).
3. THE CONTRACTOR IS RESPONSIBLE FOR THE TRENCH SAFETY SYSTEM. THE TRENCH
D 11. THE CONTRACTOR IS RESPONSIBLE FOR CLEARLY IDENTIFYING THE AREA OF SAFETY SYSTEM SHALL BE COMPLIANT WITH EM385-1-1.
CONSTRUCTION AND SAFELY ROUTING ALL VEHICULAR AND PEDESTRIAN TRAFFIC
4. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THE LAYDOWN AREA IS RESTORED TO
AROUND THE CONSTRUCTION AREA. THE CONSTRUCTION AREA SHALL BE CLEARLY
EXISTING OR BETTER CONDITIONS.
FH MARKED AT ALL TIMES.
5. THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR THE INSTALLATION AND
12. THE CONTRACTOR SHALL LOCATE, VERIFY, AND IDENTIFY ALL UTILITY LOCATIONS
MAINTENANCE OF SEDIMENT AND EROSION CONTROL MEASURES DURING CONSTRUCTION.
PRIOR TO EXCAVATION AND TAKE ALL MEASURES NECESSARY TO PROTECT UTILITIES
DURING CONSTRUCTION. CONTRACTOR SHALL SOFT DIG OR HAND DIG IN AREAS WITH
6. THE CONTRACTOR SHALL ADHERE TO ALL NOTES PROVIDED IN THESE CONSTRUCTION
CONGESTED UTILITY CORRIDORS. SHOULD ANY UTILITY LINE OR COMPONENT BECOME
DRAWINGS.
DAMAGED OR REQUIRE RELOCATION THE CONTRACTOR SHALL IMMEDIATELY NOTIFY
SANITARY CLEAN OUT THE RESPONSIBLE UTILITY COMPANY.
CO 7. ALL CONSTRUCTION LINES & GRADES SHALL BE ESTABLISHED AND MAINTAINED BY THE
CONTRACTOR.
13. THE CONTRACTOR SHALL PROTECT EXISTING UTILITIES, SURVEY MARKERS,
MONUMENTS, ETC. DURING CONSTRUCTION. THE CONTRACTOR SHALL
8. ALL EXTERIOR VEHICULAR SIGNAGE SHALL USE A MINIMUM OF TYPE III RETROREFLECTIVE
RESTORE/REPLACE ANY DAMAGE CAUSED BY CONSTRUCTION ACTIVITIES.
SHEETING IN ACCORDANCE WITH MUTCD AND ASTM D4956-09 REQUIREMENTS.
B
NORTH ARROW
ATFP SETBACK
OVERHEAD COMPRESSED
AIR LINE
DWG SCALE INDICATOR
UNDERGROUND
COMPRESSED AIR LINE
DRAWING TITLE INDICATOR
ELECTRIC
Scale:
ELECTRICAL DUCTBANK
FENCE - CHAIN LINK
REVISION CLOUD AND NUMBER INDICATTOHER CONTRACTOR SHALL COMPLY WITH ALL CODES REGULATING DEMOLITION WORK. THE
CONTRACTOR SHALL ERECT BARRIERS AND WARNING LIGHTS, AS MAY BE NECESSARY OR REQUIRED
FIRE HOSE LAY TO PROTECT AND PREVENT UNAUTHORIZED PERSONNEL FROM ENTERING THE DEMOLITION WORK
AREA. ALL DEMOLITION OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE FEDERAL
3 OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) AND EM-385-1-1 INSOFAR AS THEY APPLY TO
FIRE LINE
DEMOLITION WORK TO BE PERFORMED UNDER THIS CONTRACT.
C
LIMITS OF DISTURBANCE 1. ALL THE EXISTING FACILITIES TO REMAIN SHALL BE ACCESSIBLE DURING THE ENTIRE
DURATION OF CONSTRUCTION.
SILT FENCE
2. TEMPORARY PROTECTIVE DEVICES, AS REQUIRED SHALL BE INSTALLED ADJACENT TO
THE DEMOLITION WORK FOR PROTECTION OF PERSONNEL, EXISTING ADJACENT
SANITARY SEWER PIPE BUILDINGS, STRUCTURES AND EQUIPMENT AGAINST DUST, FALLING OR FLYING DEBRIS.
ANY DAMAGE TO EXISTING STRUCTURES, FACILITIES AND/OR EQUIPMENT RESULTING
FROM DEMOLITION WORK SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE
STORM SEWER PIPE
GOVERNMENT.
CONDENSATE LINE 3. ALL DEBRIS, STUMPS AND MATERIALS GENERATED BY PROJECT DEMOLITION SHALL BE
HAULED AWAY AND DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR SHALL MAKE
HIS OWN ARRANGEMENTS FOR OBTAINING DISPOSAL AREAS. THE CONTRACTOR SHALL
STEAM CONDENSATE LINE
TAKE EVERY PRECAUTION TO PREVENT SPILLAGE OF MATERIALS BEING HAULED IN
PUBLIC STREETS. IT SHALL BE THE CONTRACTOR RESPONSIBILITY TO IMMEDIATELY
UNDERGROUND COMMUNICATION CLEAN UP ANY SPILLAGE WHICH MAY ACCIDENTALLY OCCUR.
5. THE CONTRACTO RSHALL MAINTAIN AN ORDER OF NEATNESS AND GOOD HOUSEKEEPING.
WATER LINE
TOOLS ,SCAFFOLDING AND OTHER DEMOLITION EQUIPMEN TSHALL AT ALL TIMES BE KEPT IN
A NEAT AND ORDERLY ARRANGEMENT . AT THE CONCLUSION OF THE DEMOLITION
UNKNOWN WATER LINE OPERATIONS T,HE ENTIRE WORK AREA SHALL BE LEFT IN A CLEAN CONDITION AS REQUIRED
FOR SUBSEQUENT NEW WORK.
FORCE MAIN
6. CONTRACTO RTO SCHEDULE CLEARING AND GRADING WORK FOR CLEAR ZONES AND
UTILITY TRENCHING SUCH THAT THERE IS NOT MORE THAN 5 DAYS BETWEEN GROUND
DISTURBANC EAND SEEDING . IF THIS CRITERIA IS NOT MET, THE CONTRACTO RSHALL
PROVIDE SILT FENCING AT THE LIMITS OF DISTURBANCE.
| SHEET YA )W 1 W / 4 R E 1 K L B Y R AI W A RA P V H ;h E p A m E 5 I 5 R G =T T R IM H O IL C D E E A G EP E S( P SHEET V-105 '0 0 0 1 '5 0 0 1 | V-102 SHEET V-103 5' '5 9 0 0' 9 0 0 1 0 1 1005' 1005' 5' 1000' 1000' 9 9 992' 993' 994' 995' 995' 0' 990 9 ' 91' 989' 990' 988' 990' 987' 9 9 5' 9 9 0' 8 5' 0' 985' 980' 985' 984'985' 986' 9 8 9 975' 980' 970' 968' 968' 968' 965' 0' 8 9 '7 9 9 995' 0' 0 1 0 5' 9 9 9 9 5 ' SHEET V-104 | |||||||||||||||
| ELECTRIC SANITARY SEWER PIPE UNDERGROUND COMMUNICATION WATER LINE | ||||||||||||||||
| GRAPHIC SCALE | ||||||||||||||||
YA
)W
1
W
/ 4 R
E 1 K
L
B Y R
AI
W A RA
P V H
;h E
p A m E
5 I 5 R G =T
T R IM
H O IL
C D E
E
A G EP
E S(
P
ELECTRIC
SANITARY SEWER PIPE
UNDERGROUND COMMUNICATION
SHEET V-102 SHEET V-103
WATER LINE
5' '5 9
0 0' 9 0 0
1 0
1
1005'
1005'
1000' 1000' 9 9
5'
992' 993' 994'
995' 995' 0' 990 9 ' 91'
990' 989'
9 9 5' 9 9 0'
9
8 5'
8
0' 985' 980'
990'
985' 984'985' 986'
987'
988'
9 975' 980'
970'
968'
968'
968'
SHEET V-105 965'
0'
'0 9 8
0
0
1
'7
9
'5 9
0
0
1
995'
0'
0
1 0 5'
9
9
9
9
5
'
SHEET V-104
GRAPHIC SCALE
| MATCH LINE - SHEET V-103 '5 0 0 1 1005' 1005' 1000' 1000' 995' 995' 990' 985' 5' 0' 9 9 9 9 5' 8 9 980' 0' 8 9 975' 970' | ELECTRIC SANITARY SEWER PIPE UNDERGROUND COMMUNICATION WATER LINE GRAPHIC SCALE | |||||||||||||
ELECTRIC
SANITARY SEWER PIPE
UNDERGROUND COMMUNICATION
WATER LINE
'5
0
0
1
1005'
1005'
1000'
1000'
995'
995'
990'
985'
5' 0'
9 9
9 9
5'
8
9 980'
0'
8
9
975'
GRAPHIC SCALE
970'
MATCH
LINE
-
SHEET
V-103
| 201 | |||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| -V TEEHS - ENIL HCTAM 5' 9 9 '5 0 0 1 0' 0 0 1 5' 9 9 0' 990' 986' 985' 985' 984' 980' | ELECTRIC SANITARY SEWER PIPE UNDERGROUND COMMUNICATION WATER LINE GRAPHIC SCALE | ||||||||||||||||
ELECTRIC
SANITARY SEWER PIPE
UNDERGROUND COMMUNICATION
WATER LINE
5'
9
9
'5
0
0
1
0'
0
0
1
5'
9
9
0'
990'
986'
985'
985'
984'
980'
GRAPHIC SCALE
201-V
TEEHS
-
ENIL
HCTAM
| MATCH LINE - SHEET V-10 | ||||||||||||||||||||||
| 5 | ||||||||||||||||||||||
| ELECTRIC SANITARY SEWER PIPE UNDERGROUND COMMUNICATION WATER LINE | ||||||||||||||||||||||
| GRAPHIC SCALE | ||||||||||||||||||||||
MATCH LINE - SHEET V-105
ELECTRIC
SANITARY SEWER PIPE
UNDERGROUND COMMUNICATION
WATER LINE
GRAPHIC SCALE
| 968' | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| '0 0 0 1 '5 0 0 1 | '7 9 9 0' 0 0 1 | 995' 5' 9 9 9 9 5 ' MATCH LINE - SHEET V-104 | ELECTRIC SANITARY SEWER PIPE UNDERGROUND COMMUNICATION WATER LINE GRAPHIC SCALE | ||||||||
968'
ELECTRIC
SANITARY SEWER PIPE
'0
0
0
1 UNDERGROUND COMMUNICATION
WATER LINE
'7
9
9
'5
0
0
1
995'
0'
0
0
1
5'
9
9
9
9
5
'
GRAPHIC SCALE
MATCH LINE - SHEET V-104
| SHEET YA )W 1 W / 4 R E 1 K L B Y R AI W A RA P V H ;h E p A m E 5 I 5 R G =T T R IM H O IL C D E E A G EP E S( P SHEET CS-105 '0 0 0 1 '5 0 0 1 | CS-102 SHEET CS-103 5' '5 9 0 0' 9 0 0 1 0 1 1005' 1005' 5' 1000' 1000' 9 9 992' 993' 994' 995' 995' 0' 990 9 ' 91' 989' 990' 988' 990' 987' 9 9 5' 9 9 0' 8 5' 0' 985' 980' 985' 984'985' 986' 9 8 9 975' 980' 970' 968' 968' 968' 965' 0' 8 9 '7 9 9 995' 0' 0 1 0 5' 9 9 9 9 5 ' SHEET CS-104 | GENERAL SHEET NOTES | |||||||||||||||
| SITE LEGEND | |||||||||||||||||
| GRAPHIC SCALE | |||||||||||||||||
| E |
YA
)W
1
W
/ 4 R
E 1 K
L
B Y R
AI
W A RA
P V H
;h E
p A m E
5 I 5 R G =T
T R IM
H O IL
C D E
E
A G EP
E S(
P
GENERAL SHEET NOTES
SHEET CS-102 SHEET CS-103
5' '5 9
0 0' 9 0 0
1 0
1 SITE LEGEND
1005'
1005'
1000' 1000' 9 9
5'
992' 993' 994'
995' 995' 0' 990 9 ' 91'
990' 989'
9 9 5' 9 9 0'
9
8 5'
8
0' 985' 980'
990'
985' 984'985' 986'
987'
988'
9 975' 980'
970'
968'
968'
968'
SHEET CS-105 965'
0'
'0 9 8
0
0
1
'7
9
'5 9
0
0
1
995'
0'
0
1 0 5'
9
9
9
9
5
'
SHEET CS-104
GRAPHIC SCALE

With GovernmentContracts, you can:
...associated electrical modifications, concrete pad, minor site grading, and all other related work. ...
G. Ben Turnipseed Engineers
Bid Due: 10/13/2026
...), Including Consulting 91223 Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock...
State Government of Georgia
Bid Due: 10/15/2026
...91223 Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization...
State Government of Georgia
Bid Due: 10/15/2026
..., General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. BuyerContact: Alan ...
State Government of Georgia
Bid Due: 9/24/2026