| Location: | Wyoming |
|---|---|
| Posted: | Oct 13, 2026 |
| Due: | Nov 10, 2026 |
| Agency: | City of Rawlins |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026 - 005 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
2026 - 005
|
| Bid Title: |
2026 Invitation to Bid for the Wyoming Bar Demolition Project
|
| Category: | City of Rawlins Bid Postings |
| Status: | Open |
| Additional Status Information: | Mandatory Pre-Bid Meeting will be held at the date, time and location stated in the Bid Schedule. |
|
INVITATION TO BID (ITB)
WYOMING BAR DEMOLITION PROJECT
Project Location: Former Wyoming Bar, Downtown Rawlins, Wyoming
Street Address: 413 W. Front Street, Rawlins, WY 82301
County: Carbon County, Wyoming
Owner / Responsible Entity: City of Rawlins (WCDA CDBG Grantee)
Funding Source: HUD Community Development Block Grant (CDBG)
Procurement Method: Sealed Competitive Bid (W.S. 15-1-113; 2 C.F.R. 200.320(b)(1))
Contents
INTRODUCTION 3
PROJECT BACKGROUND 3
SCOPE OF WORK & REGULATORY COMPLIANCE 4
BASIS OF AWARD 6
BID SCHEDULE 7
INSTRUCTIONS TO BIDDERS 7
APPENDIX 1: MITIGATION PLAN FOR DEMOLITION 9
APPENDIX 2: CDBG CONTRACTS HUD RIDER WCDA/ HUD GENERAL PROVISIONS 15
APPENDIX 3: HUD-4010 FEDERAL LABOR STANDARDS PROVISIONS 25
APPENDIX 4: PREVAILING WAGES FROM SAM.GOV 33
INTRODUCTION
The City of Rawlins, a Wyoming Municipal Corporation, (City) in collaboration with
the Wyoming Community Development Authority (WCDA), is seeking sealed bids
from qualified, responsible contractors to undertake the WYOMING BAR
DEMOLITION PROJECT (Wyoming Demolition). The Former Wyoming Bar building,
located at 413 W. Front Street in downtown Rawlins, Wyoming, is a vacant, blighted,
and structurally unsound historic commercial structure originally constructed circa
1900. The Wyoming Bar sits adjacent to a downtown City park. The City will
temporarily close the park during demolition.
The intent of this project is to complete regulated full demolition of the structure,
followed by proper disposal of all asbestos-containing materials (ACM), lead-paint
and other regulated demolition debris. The project is funded with HUD Community
Development Block Grant (CDBG) funds and must comply with all applicable federal,
state, and local requirements. Funding for this project is provided by Housing and
Urban Development (HUD) with funds overseen by WCDA. Project procurement,
implementation and closeout must comply with all HUD and Federal regulations.
Procurement of Federal sourced funding is subject to the City's "Federal Grant and
Loan Program Procurement Procedure" with specific requirements for record keeping
and conflict of interest that bidders should be familiar with. Because the project is
funded in part with federal CDBG funds, this procurement is also subject to 24
C.F.R. 570.489(g) and the procurement standards of 2 C.F.R. 200.317-200.327
as required by WCDA.
Any contract entered into by the successful bidder will include the CDBG
CONTRACTS HUD RIDER WCDA/HUD GENERAL PROVISIONS included with this
ITB in Appendix 2 and meet all provisions of the Federal Labor Standards Provisions
attached in Appendix 3 including the applicable wage determination from SAM.gov
(Appendix 4), as modified by any modification published and made applicable under
29 C.F.R. Part 1 before bid opening, which the City will issue by addendum.
PROJECT BACKGROUND
The Former Wyoming Bar building, located at 413 W. Front Street in downtown
Rawlins, Wyoming, is a vacant, blighted, and structurally unsound historic
commercial structure originally constructed circa 1900. The intent of this project is
to complete regulated full demolition of the structure, followed by proper disposal of
all asbestos-containing materials (ACM), lead-paint and other regulated demolition
debris. The project is funded with HUD Community Development Block Grant
(CDBG) funds and must comply with all applicable federal, state, and local
requirements.
A Phase I Environmental Site Assessment (ESA) was completed for the Former
Wyoming Bar property in accordance with ASTM Practice E1527-21 by Ayres
Associates (dated August 12, 2025). The Phase I ESA identified no Recognized
Environmental Conditions (RECs), no Controlled Recognized Environmental
Conditions (CRECs), and no significant data gaps. A Phase II ESA was not warranted
for purposes of All Appropriate Inquiry (AAI). Due to the age and condition of the
structure, asbestos containing materials and lead-based paint are presumed to be
present.
SCOPE OF WORK & REGULATORY COMPLIANCE
The scope of work for the Wyoming Demolition will comply with the approved WCDA
Mitigation Plan, attached as Appendix 1. The selected Contractor shall comply with
all mitigation and regulatory measures incorporated into the approved mitigation
plan including
1. Notification & Regulatory Compliance
2. Demolition, including work practices, worker requirements, air monitoring,
waste determination & handling, and post-demolition inspection
i. Please note that the final demolition plan must be submitted and
approved by the Wyoming Department of Environmental Quality
(DEQ) via the State of Wyoming Notification of Demolition and
Renovation form.
3. Packaging, Transport & Disposal
4. Site Control & Community Protection
5. Site Restoration
6. Documentation & Reporting
7. CDBG Compliance & Project Closeout
Additional Scope of Work
Prior to any demolition, the final demolition plan must be approved by the WDEQ.
Exterior Stonework Preservation
1. The Contractor shall develop and implement a plan to maximize the preservation
and salvage of exterior stone during demolition. Only stone verified to be free of
asbestos-containing materials (ACM), lead-based paint, and other hazardous
materials shall be retained. Salvaged stone shall be protected from damage and
stockpiled at a location, as designated by the Owner, for future public or historic
preservation projects.
Selected Contractor will be required to obtain a City contractor license Demolition
Class A. Demolition will be monitored by City Community Development Department.
Contract Time. All Work shall be substantially complete within forty-five [45]
calendar days, and finally complete within sixty [60] calendar days, after the date
stated in the Notice to Proceed. [Liquidated damages: $100 per calendar day of delay
beyond the Contract Time. No demolition may begin until the WDEQ has approved
the final demolition plan.
Air Monitoring. The Contractor shall retain an independent, qualified asbestos
consultant, not affiliated with the Contractor, to perform the perimeter air monitoring
described in Appendix 1, Section 2.3, and shall include that cost in its bid.
Insurance. The Contractor shall maintain the insurance required by the City's
standard construction contract, including contractor's pollution liability coverage
applicable to asbestos and lead-containing materials, naming the City as additional
insured.
MINIMUM BID REQUIREMENTS
* Bidder must be a responsible contractor with demonstrated experience in
regulated demolition of structures containing asbestos and lead-based paint, as
shown in the responsibility information required under Bid Submission
Requirements.
* Compliance with all Federal, State and Local Laws.
* Execute and comply with the provisions of the Mitigation Plan (attached as
Appendix 1) and DEQ Approved Demolition Plan.
* Before beginning work, the successful bidder shall furnish a performance bond
and a payment bond, each in an amount equal to one hundred percent (100%) of
the contract price, meeting the requirements of W.S. 16-6-112 and 2 C.F.R.
200.326.
* Submit bids with provided documents complete, including any addendums.
* Bid security equal to at least five percent (5%) of the total bid amount, in the form
of a bid bond (or, for a bid of $150,000 or less, a certified or cashier's check payable
to the City of Rawlins), as required by W.S. 15-1-113 and 2 C.F.R. 200.326(a).
Bid security shall remain in effect for sixty (60) days after bid opening.
* Bidder and its proposed subcontractors must not be suspended, debarred, or
otherwise excluded from federal assistance programs (2 C.F.R. Part 180 and Part
2424). The City will verify exclusion status in SAM.gov before award.
BID SUBMISSION REQUIREMENTS
Each bid shall include the following. A bid that omits a required item may be rejected as
non-responsive:
1. Responsibility information: company background; the asbestos and lead-
paint licenses and certifications held by the firm and its supervisor
(identifying the issuing agency and number); and experience with demolition
of buildings containing hazardous materials, including at least two (2)
project references.
2. Qualifications and experience of key personnel who will be involved in the
project, including the licensed asbestos/lead-paint supervisor who will be on
site during all demolition activities.
3. Summary demolition work plan showing how the Bidder will perform the
Work in accordance with Appendix 1 (reviewed for responsibility; not scored).
4. Proposed timeline, equipment and schedule for project delivery, including
milestones and completion dates, demonstrating completion within the
Contract Time stated in this ITB.
5. Plan to maximize exterior stone preservation, understanding no hazardous
materials will be retained (reviewed for responsibility and incorporated into
the contract; not scored).
6. Completed Bid Form stating (a) a firm-fixed lump-sum price for all Work,
including demolition, transport and disposal, and leaving the site in a safe
and stable condition suitable for future redevelopment; (b) the unit prices
requested on the Bid Form for [disposal of debris determined by TCLP testing
to be hazardous waste (per ton)] and [removal and disposal of mercury-
containing devices, ballasts, and refrigerants (per unit)]; and (c) a schedule
of values. Cost-reimbursement, time-and-materials, and cost-plus-a-
percentage-of-cost pricing will not be accepted.
7. Bid security as required under Minimum Bid Requirements.
8. Signed Certification Regarding Lobbying and, if applicable, Standard Form-
LLL, Disclosure of Lobbying Activities (31 U.S.C. 1352; 24 C.F.R. Part 87).
9. Signed certification regarding debarment, suspension, and other
responsibility matters (2 C.F.R. Part 180 and Part 2424).
10. Section 3 documentation required by WCDA, if any (24 C.F.R. Part 75).
11. Acknowledgment of all addenda, on the Bid Form.
12. A mandatory Pre-Bid meeting will be held at the date, time, and location
stated in the Bid Schedule. On hand to answer questions will be the
following City personnel:
1. Pam Thayer Rawlins DDA Executive Director
2. Luis Lascano Community Development Director
BASIS OF AWARD
Bids will be publicly opened and read aloud. The City will review bids for
responsiveness to this ITB; bids that do not meet the Minimum Bid Requirements
or omit required submittals may be rejected as non-responsive. The City will then
determine whether the apparent low bidder is qualified and responsible, considering
integrity, compliance with public policy, record of past performance, and financial
and technical resources (2 C.F.R. 200.318(h)). The contract will be awarded to the
lowest responsive bidder determined qualified and responsible, in accordance with
W.S. 15-1-113 and 2 C.F.R. 200.320(b)(1). The bid price for purposes of award is
the lump-sum price plus the unit prices extended by the estimated quantities stated
on the Bid Form.
Preferences. Consistent with 2 C.F.R. 200.319(c), Wyoming resident-contractor
and Wyoming-materials preferences under W.S. 16-6-102 and 16-6-104 through
16-6-107 will not be applied to this federally funded contract.
Award Contingencies. Award is contingent on (a) HUD/WCDA issuance of the
Authority to Use Grant Funds under 24 C.F.R. Part 58, (b) availability of CDBG
funds, and (c) approval by the City Council.
BID SCHEDULE
Invitation to Bid Published October 14, 2026 and
October 21, 2026
Pre-Bid Meeting October 27, 2026, at 2:00pm
Rawlins DDA Office -
116 4th Street - Upstairs
Final Questions Due October 30, 2026
Response to Questions November 4, 2026
Bids Due and Public Bid Opening
November 10, 2026, at 2:00pm at
City Hall 521 E Cedar Street
City Council Meeting & Motion to Award (tentative) November 17, 2026
INSTRUCTIONS TO BIDDERS
Each Bidder must submit one (1) original signed Bid and one (1) copy in a sealed
envelope clearly marked "WYOMING BAR Demolition Project" and listing the
Bidder's name and address.
1. The City will not be liable to any Bidder for any unforeseen circumstances,
delivery, or postal delays. Bids submitted late or via oral, telephonic,
telegraphic, electronic mail, or facsimile will not be considered or accepted.
Postmarking on the due date will not substitute for receipt of the Bid. Each
Bidder is responsible for submission of its Bid. Additional time will not be
granted to a single Bidder; however, additional time may be granted to all
Bidders by written addendum if the City determines that circumstances
warrant it.
2. Bids must be received no later than 2:00 p.m., Mountain Time, on
November 10, 2026. Bids will be publicly opened and read aloud at that
time at Rawlins City Hall, 521 W. Cedar St., Rawlins, WY. Bidder name
and bid amount will be announced and recorded. Once opened, bids will
be filed for public inspection and become the property of the City.
3. Please submit bids in an envelope marked "WYOMING BAR Demolition
Project" to:
Lynn Shearer, City Clerk
City of Rawlins
521 West Cedar Street
PO Box 953. Rawlins, WY 82301
The City of Rawlins reserves the right to reject any or all bids received, to
waive any informalities or irregularities in the bids received, and to award
the contract to the lowest responsive bidder determined qualified and
responsible, in accordance with W.S. 15-1-113 and applicable HUD, State,
and WCDA requirements. Any rejection of all bids will be documented in
writing.
For inquiries or clarification regarding this ITB, please contact via email up
to the final question date as noted:
* Pam Thayer - DDA Director pthayer@rawlinswy.gov
* Lou Lascano - Community Development Director llascano@rawlinswy.gov
The City will answer questions only by written addendum issued to all plan
holders of record and posted on City of Rawlins website -
www.Rawlinswy.gov/bids. Oral answers are not binding.
APPENDIX 1: MITIGATION PLAN FOR DEMOLITION
Mitigation Plan for Demolition
Wyoming Bar - Rawlins, Wyoming
RE: Full-Structure ACM and Lead Paint Assumption & Demolition
Project Summary
Due to structural instability and confirmed unsafe entry conditions, the building will be treated in
its entirety as asbestos-containing material (ACM) and Lead Paint (LP). Demolition will be
conducted under asbestos and lead paint control measures, with all resulting debris managed,
transported, and disposed of as ACM in accordance with the U.S. Environmental Protection
Agency National Emission Standards for Hazardous Air Pollutants (NESHAP, 40 CFR Part 61),
Wyoming Department of Environmental Quality requirements, applicable OSHA asbestos
standards, and U.S. Department of Housing and Urban Development environmental review
requirements under 24 CFR Part 58.
Due to unsafe structural conditions, the building will not undergo additional asbestos and lead paint
inspection or pre-demolition abatement. Reports are included.
* Designated by the City of Rawlins as a Dangerous Building on March 10, 2016
* Phase I Environmental Site Assessment (Wyoming Brownfields SPURR Program)
determined:
Structure is unsafe to access All suspect materials are presumed
o o
asbestos-containing (PACM/ACM) Report Included
o
* A Wyoming-licensed structural engineer will provide written certification that the building
is in imminent danger of collapse - Report Included
* Hire licensed/certified asbestos and lead paint contractor and supervisor Result:
The entire structure will be regulated and handled under asbestos NESHAP demolition provisions
as ACM-contaminated debris. Lead Paint addressed under waste determination and handling.
1. Notification & Regulatory Compliance
* Have a meeting to review and verify all requirements are met in the Mitigation
Plan for Demolition with Wyoming DEQ, EPA, OSHA and HUD Environmental.
* Submit Notification of Demolition and Renovation to the Wyoming DEQ
*
Notification provided at least 10 working days prior to demolition All activities
*
will comply with: EPA NESHAP (40 CFR Part 61)
o
OSHA asbestos regulations
o
Wyoming DEQ HUD
o o
Environmental
Contractor shall maintain all required licensing, certifications, and disposal documentation
*
onsite during demolition activities
2. Demolition (No Pre-Abatement)
* No interior asbestos and lead paint abatement will occur prior to demolition
* Structure will be demolished in place under controlled asbestos & lead paint work practices.
2.1 Work Practices
To minimize visible emissions and prevent the release of asbestos fibers and lead paint dust during
demolition activities, the following work practices will be implemented:
* Continuous wet methods before, during, and after demolition
* Controlled mechanical demolition only; no dry crushing or pulverizing
* Minimize drop heights and unnecessary debris handling
* Maintain wet debris piles at all times
* Utilize water spray systems capable of delivering continuous saturation to demolition areas
and debris piles
* Cease demolition operations during excessive wind conditions when visible emissions
cannot be controlled
* Debris shall not be dropped, thrown, or mechanically crushed in a manner that could release
asbestos fibers or lead paint dust
* Adequately wet ACM/LP debris prior to loading, unloading, handling, or transport
Site Inspection & Emission Control Measures
The asbestos and lead paint contractor/supervisor and designated competent person shall conduct
routine inspections throughout demolition activities to verify compliance with EPA NESHAP,
OSHA asbestos standards, Wyoming DEQ requirements, and HUD environmental review
commitments.
Inspection Frequency
* Inspection of active demolition operations at the start of each workday.
* Continuous observation during active demolition operations.
* Inspection whenever demolition methods change, debris is loaded for transport, or weather
conditions change significantly.
* Inspection immediately following any equipment malfunction, unexpected material
release, visible dust generation, or complaints from the public.
Inspection Items
* Adequacy of wetting and dust suppression systems.
* Presence of visible emissions or airborne dust.
* Condition of debris piles and waste containers.
* Condition of haul vehicles and load coverings.
* Site security fencing and warning signage.
* Worker compliance with PPE and decontamination requirements.
Corrective Actions
If visible emissions, excessive dust, inadequate wetting, or other non-compliant conditions are
observed:
* Work shall be immediately suspended in the affected area.
* Additional water suppression shall be applied.
* Demolition methods shall be modified to reduce fiber release.
* Conditions shall be corrected before demolition activities resume.
* Corrective actions shall be documented in the daily inspection log.

With GovernmentContracts, you can:
Follow CO OMAD 300(71) Minuteman Missile Access Active Contract Opportunity Notice ID 6982AF27B000010
TRANSPORTATION, DEPARTMENT OF
Bid Due: 12/02/2026
Description Opening Date/Time Closing Date/Time MPO 27-01 Casper Area Bicycle and Pedestrian Plan
City of Casper
Bid Due: 12/11/2026
Follow 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Active
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/17/2026
Follow CO OMAD 300(71) Minuteman Missile Access Active Contract Opportunity Notice ID 6982AF27B000010
TRANSPORTATION, DEPARTMENT OF
Bid Due: 12/02/2026