| Location: | Arizona |
|---|---|
| Posted: | Sep 21, 2026 |
| Due: | Sep 22, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12444126Q0060 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This project covers the replacement and replenishment of corrugated metal culvert pipes required to support road maintenance operations across the Tonto National Forest. The Contractor shall manufacture, supply, and deliver corrugated metal pipes (CMP) and all associated hardware, including coupling bands, in full compliance with FP-24 specifications (and FP-14 where applicable). All materials must meet requirements for dimensions, coatings, joints, and markings. Deliveries will be intended for stock-on-hand, allowing the Forest Service to rapidly deploy these materials for installation or replacement of drainage infrastructure on Forest System roads. This capability is critical for maintaining roadway drainage capacity and resilience, particularly following fire and flood events.
Delivery to address below: Payson Administrative Site Road Crew Workstation 1009 E. Hwy 260 Payson, AZ 85541
Note: Supplier must plan to deliver the culverts to the Payson Admin Site and have a mechanism to offload them from their truck like a truck-mounted or "piggyback" forklift.
Also, vendor must contact the COR to arrange a date and time for delivery so they can be available to open the gates for the delivery driver.
Made In America certificate or statement that the items satisfy the Made in America requirement must be supplied with offers.
| Sep 17, 2026 | [Solicitation (Original)] Tonto Culvert Order |
| Sep 22, 2026 | [Solicitation (Updated)] Tonto Culvert Order (Amended) |

With GovernmentContracts, you can:
...and Architectural Metal Work Manufacturing Place of Performance: Payson , AZ 85541 USA ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/25/2026
...19.5) Product Service Code: 4540 - WASTE DISPOSAL EQUIPMENT NAICS Code: 332439 - ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/23/2026
...junction point to obtain ore and refined metal by wagon, in turn shipping ...
City of Benson, Arizona
Bid Due: 10/09/2026
...; Drainage (surface, subsurface, drain dips, corrugated metal pipe, under drains, etc.); Aquatic ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 2/13/2028