| Location: | Texas |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Jul 17, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU 26 019 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additional improvements include new flowmeter controls, irrigation and landscaping enhancements, and security upgrades at the North Berry Road gate. Modifications to the existing clearwells are also included as additive alternates. Volumes 1, 2, & 3 Specifications, Drawings, and Bid Proposal Spreadsheet will be uploaded Friday May 29, 2026.

With GovernmentContracts, you can:
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
North East Independent School District
Bid Due: 11/30/2027
FY27 PM for Sensititre Systems Follow Solicitation Solicitation ID: HHS0017148v3 Status: Posted Contact
State Government of Texas
Bid Due: 8/07/2026
Project: Advanced Metering Infrastructure (AMI) Proof of Concept Program Ref. #: BCZ26-00030328 Type:
City of Dallas
Bid Due: 7/24/2026
Title: Space Needs Assessment Study E-BID Release Date: 7/5/2026 Due Date: 7/24/2026 Status:
Kendall County
Bid Due: 7/24/2026