| Location: | Texas |
|---|---|
| Posted: | Jul 7, 2026 |
| Due: | Jul 17, 2026 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU 26 019 |
| Publication URL: | To access bid details, please log in. |
Project Description: The project consists of the construction of a new residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable frequency drives, a new electrical building with a motor control center (MCC), HVAC improvements, and replacement of the site transformer. Additional improvements include new flowmeter controls, irrigation and landscaping enhancements, and security upgrades at the North Berry Road gate. Modifications to the existing clearwells are also included as additive alternates. Volumes 1, 2, & 3 Specifications, Drawings, and Bid Proposal Spreadsheet will be uploaded Friday May 29, 2026.

With GovernmentContracts, you can:
...Commercial Heating, Ventilation and Air Conditioning (HVAC) Maintenance and Repair Services - FTW...: ...
State Government of Texas
Bid Due: 10/09/2026
...Follow Replace Fisher House 1 HVAC System Active Contract Opportunity Notice ID 36C25726Q0864..., ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 9/25/2026
...equipment; purchase and installation of new food service equipment; selective demolition...; modifications to ...
Tarrant County College District
Bid Due: 10/14/2026
...as best as possible. Applicable Product Categories: 910-17, Energy Computerized Control System, HVAC..., ...
City of San Antonio
Bid Due: 9/30/2026