| Location: | New York |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Aug 31, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: | |
| Solicitation No: | FA875126Q0928 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Sources Sought Notice – FA875126Q0928
NOTICE: APC UPS Units
Description
THIS IS A REQUEST FOR INFORMATION (RFI). This RFI is issued solely for information and planning purposes. It does not constitute a Request for Quote (RFQ) or imply the Government’s intent to issue an RFQ in the future. This request for information does not commit the Government to contract for any supply or service whatsoever. Interested parties are advised that the U.S. Government will not pay for any information or administrative costs incurred in response to this RFI. All costs associated with responding to this RFI will be solely at the interested party’s expense. No entitlement to payment by the Government of direct or indirect costs or charges will arise as a result of the submission of information in response to this RFI. Response to this RFI is strictly voluntary and will be used to determine if there is adequate competition. Not responding to this RFI does not preclude participation in any future RFQ, if any is issued. All information received shall be safeguarded from unauthorized disclosure.
Introduction
Rome Research Site, NY requires six (6) APC UPS Units to replace existing APC/Schneider end of life (EOL) units. Units will vary in size from 15 to 40 KvA and vary in battery uptime. Government electricians will perform installation, ancillary service by APC or certified Original Equipment Manufacturer (OEM) is required to certify units are installed per OEM specifications and start the systems up. No third-party vendors will be accepted.
These units have to be installed and cut over from the old units to the new units in a very short outage time. Because of the criticality of the systems they support, the integration of another OEM unit will cause unnecessary delays and outage of critical systems. An engineering study was done to match the existing wiring to units that will require little to no changes in the configuration of input and distribution wiring. The existing APC wiring differs in many ways from standard configurations with additional over voltage and protect circuits which would need to be changed or eliminated with other OEMs.
The familiarity and training with the APC product line (including the new GVS units) by the installation engineers, operators and maintainers enhances the ability of the government to have a smooth transition from one unit to another with minimal downtime to affected systems.
This effort is to replace EOL APC units with like APC units in spaces where two units cannot simultaneously be installed and working for the transition in most cases, thus the need for units that will directly substitute with minimal manipulation of wiring.
Specific APC UPS models requested are attached.
Contractor employees requiring access to USAF bases, AFRL facilities, and/or access to U.S. Government Information Technology (IT) networks in connection with the work on this contract must be U.S. citizens. For the purpose of base and network access, possession of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This requirement does not apply to foreign nationals approved by the U.S. Department of Defense or U.S. State Department under international personnel exchange agreements with foreign governments. It also does not apply to dual citizens who possess US citizenship, to include Naturalized citizens.
Requirements
Interested vendors are requested to respond to this RFI and provide the following information:
a. Demonstration of the companies’ certified OEM status
b. Companies business size
c. Preliminary market research quote for all six (6) requested APC units
Responses
Interested vendors are requested to respond to the RFI no later than 12:00 PM EST on 31 August 2026.
Responses will only be accepted via email to Ms. Jenna Tarbania, Contracting Officer, at jenna.tarbania@us.af.mil, and Ms. Tiffany Slopka, Contract Specialist, at tiffany.slopka@us.af.mil.
Any questions relative to this RFI should be sent electronically to the above e-mail addresses. NO PHONE INQUIRIES PLEASE. All communication shall be in writing and reference: FA875126Q0928 APC UPS Units
Attachment 1: Solution Components Breakout Detail

With GovernmentContracts, you can:
...15 Title: Software License and Maintenance Support CR#: 2138201 Agency: Mental Health, NYS ...
The New York State Contract Reporter
Bid Due: 9/01/2026
...Document Management Software System Amended 07/31/2026 08:00 AM EDT 09/14/2026 04:00 PM EDT...
Nassau County
Bid Due: 9/14/2026
...08 Title: SUNY Brockport Applicant Tracking Software CR#: 2138232 Agency: State University of ...
The New York State Contract Reporter
Bid Due: 9/24/2026
...23 Title: Collegiate Athletics Compliance and Recruiting Software Solution Note: Proposals should...
The New York State Contract Reporter
Bid Due: 9/15/2026