| Solicitation No: | 487-** REBID ** Materials Recovery Facility Retrofit |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 487-** REBID ** Materials Recovery Facility Retrofit |
| Project Title: | ** REBID ** Materials Recovery Facility Retrofit |
| Description: | ** REBID ** This project consists of various infrastructure improvements to the Materials Recovery Facility (MRF) building (approximately 94,000 sq. feet) in support of the installation of new recycling processing equipment. The work will include, but is not limited to, a new janitor’s closet with relocated water heater, a new vestibule and door from the processing area, modified equipment floor pits and modified structural bays. The existing electrical, fire alarm and fire protection systems will be modified. All new industrial equipment will be provided by the Owner’s vendor, but the General Contractor will be required to coordinate construction activities with the demolition and installation of this existing equipment and the new equipment. Electrical, plumbing and mechanical connections for all the new spaces and industrial equipment are to be done under the General Contractor’s contract. |
| Opening Date: | 11/22/2024 2:00 PM |
| Posted Date: | 11/12/2024 |
| Status: | Open |
| Department: | COUNTY OF MECKLENBURG |
|
Solicitation Number
*
487-** REBID ** Materials Recovery Facility Retrofit
|
Department
COUNTY OF MECKLENBURG
|
Status Reason
Open
|
|
|
Opening Date
2024-11-22T14:00:00.0000000
|
Posted Date
*
2024-11-12T13:57:03.0000000Z
|
Commodity Code
Industrial plant construction services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
No Pre-bid Meeting.
|
||
|
Description
** REBID ** This project consists of various infrastructure improvements to the Materials Recovery Facility (MRF) building (approximately 94,000 sq. feet) in support of the installation of new recycling processing equipment. The work will include, but is not limited to, a new janitor’s closet with relocated water heater, a new vestibule and door from the processing area, modified equipment floor pits and modified structural bays. The existing electrical, fire alarm and fire protection systems will be modified. All new industrial equipment will be provided by the Owner’s vendor, but the General Contractor will be required to coordinate construction activities with the demolition and installation of this existing equipment and the new equipment. Electrical, plumbing and mechanical connections for all the new spaces and industrial equipment are to be done under the General Contractor’s contract.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Retrofit Phase 2 Description: Sealed, hand-delivered proposals will be received until 2:00 pm ...