| Location: | Vermont |
|---|---|
| Posted: | Mar 3, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
Burlington-Winooski BF RAIZ (2) & Burlington STP 5000(29) Request for Proposal Request Date:
State Government of Vermont
Bid Due: 4/02/2027
Statewide DBOOM EVSE RFP Request Date: 9/17/2026 3:12:33 PM Open Date: 9/15/2026 Closing
State Government of Vermont
Bid Due: 11/17/2026
Facilities Job Order Contract FC0003 ON RAMP Request Date: 10/21/2026 2:34:34 PM Open
State Government of Vermont
Bid Due: 11/20/2026
Gym Flooring and Upgrades Request Date: 10/22/2026 2:11:37 PM Open Date: 10/22/2026 Closing
State Government of Vermont
Bid Due: 11/30/2026