| Location: | Vermont |
|---|---|
| Posted: | Mar 3, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Contract Locations: Washington Keywords: Construction (Non Building), Culvert Replacement, Stream... Restoration Bid Description: ...
State Government of Vermont
Bid Due: 6/19/2026
...Polly Hubbard Road Floodplain Restoration Request Date: 6/8/2026 2:35:58 PM Open Date: Closing...: ...
State Government of Vermont
Bid Due: 7/02/2026
...Westcott Brook Floodplain Restoration Implementation Request Date: 6/9/2026 4:30:53 PM Open Date... 05478 ...
State Government of Vermont
Bid Due: 7/01/2026
...Lake Carmi Lakeshore Restoration Implementation Request Date: 6/9/2026 4:36:19 PM Open Date... Bid ...
State Government of Vermont
Bid Due: 7/01/2026