| Location: | Vermont |
|---|---|
| Posted: | Mar 3, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Rutland Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...: Construction (Non Building) Bid Description: Work to be performed under this project ...
State Government of Vermont
Bid Due: 6/29/2026
...MIL DEPT - EAFR Wildland Fire Apparatus Building Request Date: 5/26/2026 10:21:21 AM ...
State Government of Vermont
Bid Due: 7/15/2026
...Keywords: Construction (Non Building), Bridge Repair and Construction, Culvert Replacement, Paving... INCLUDES THE ...
State Government of Vermont
Bid Due: 6/29/2026
...Contract Locations: Washington Keywords: Construction (Non Building), Culvert Replacement, Stream...), removal of the ...
State Government of Vermont
Bid Due: 6/19/2026